Instructions for Installers
Preparation for installation
Parts list for demand control option PCB kit (optional parts)
Items to be prepared:
• Demand control option PCB kit: optional parts
• Signal transmission cable (fi eld supply) : for demand control signal
transmission
Double insulated (cable size: 0.5–1.5 mm
2
)
NOTE: Use cable conformed to AS/NZS 5000.2.
For outdoor unit
How to connect
(1) Remove the service panel of the
outdoor unit.
(2) Remove the INV cover of the main
unit board.
(3) Attach spacers (in four places) to the
demand control option PCB.
㪈㪉㪊㪚
GOOD
PROHIBITED
(8) Put the cable tie with clips into the holes on the
bottom of the demand control option PCB.
㪈㪉㪊㪚
(9) Fix the signal transmission
cable with the cable tie
(with clip).Then cut off the
redundant end of the cable
tie.
Do not route the signal
transmission cable
overlapping with the power
supply cable. Then wire the
cable to the outside of the
outdoor unit.
(7)
Connect the signal transmission cable (fi eld-supplied)
to the demand control signal terminal block.
NOTE: Confirm that each wires of the signal
transmission cable are firmly connected
to corresponding terminal of the terminal
block.
1 : DRM 1
2 : DRM 2
3 : DRM 3
C : COMMON
20
15
( mm )
(4) Fix the demand control option PCB with
four spacers attached to the holes on the
bracket so that the demand control signal
terminal block comes underneath.
(6) Connect the demand control option PCB
and CN14 on the control board by using the
connector cable (Large Core).
Attach the Insulation to the EMI core.
Put the Connector cable and the earth
(ground) wire into the notch.
NOTE: Confirm that the connector cable
is fi rmly connected to the demand
control option PCB and the control
board.
CAUTION
Do not directly press or apply any pressure to the demand control option PCB.
Application of pressure may cause damage or fault of the board.
(12)After you complete the wiring, reinstall the
protective cover and the service panel fi rmly.
• When testing the operation of the demand control modes, please ensure the
air conditioner and optional PCB has been installed in accordance with the
provided installation manuals.
• Enquiries when testing the operation of the demand control option PCB,
Consult Fujitsu General Customer Service and your energy provider if you
have any operational issues or errors are caused.
Signal transmission cable
Attach the one-touch bush to the knockout hole.
CAUTION
Route the signal transmission cable away from the power supply cable.
Adjacent wiring of those cables may lead the product malfunctions caused by
generated noise.
Cable tie with clip
WARNING
• Do not turn ON the power until all work has been completed. Turning ON
the power before the work is completed can cause serious accidents such
as electric shock or fire.
• Ensure that any electrical installation is completed by a qualifi ed person.
• Ensure the electrical installation is installed in accordance with AS/NZS
3000.
INV cover
CN14
UTY-XCZZ3
Parts name Q'ty Summary
Demand control option PCB
1
Cooling and heating opera-
tions of air conditioners are
limited by the external input.
Option PCB holder
1*
Parts name Q'ty Summary
Connector cable (large core)
1*
For connecting the demand control option
PCB.
Connector cable (small core)
1*
For connecting the demand control option
PCB.
Cable ties with clips
1 For fi xing the signal transmission cable.
Cable ties (large)
1* For fi xing the connector cable.
Cable ties (small)
1
For fi xing the EMI core and the signal
transmission cable.
Tapping screw (large)
2* For attaching the option PCB holder.
Tapping screw (small)
1* For connecting the earth(ground) cable.
EMI core
1 Attached to the signal transmission cable.
Insulation
2* For attaching the EMI core.
Spacer
4* For fi xing the demand control option PCB
One-touch bush
1*
For attaching the signal cable.
(for connecting to the demand response
signal)
Installation manual
1
* (May not be used, depending on the model.)
Service panel
15 - 20
( mm )
Cable tie
(small)
(10) Fix the EMI core to the
signal transmission cable
with the cable tie (small).
(11) Attach the Insulation to the
EMI core.
(5) Connect the earth (ground) wire of the
demand control option PCB.