CONTRACTOR

ESL VISION CONTRACTOR Installation guide

  • Hello! I'm a chat assistant, and I've reviewed the ESL Vision Contractor Panel Series Surface Mount Installation Guide. This document provides instructions for installing various surface mount light fixtures, detailing compatible parts and step-by-step installation techniques. I can help answer your questions about the installation process and components mentioned in the guide.
  • What materials are the screws made of?
    How many Screw A's are used to assemble the frame?
    How many expansion bolts are included in the kit?
CONTRACTOR PANEL SERIES
Surface Mount Installation Guide Page 1 of 1
†Not All Part Numbers DLC Qualified. For a Complete Listing Please Consult the DLC Qualified Products List (QPL).
Copyright © 2021 ESL Vision, LLC. All rights reserved. Rev: 08/26/21
Installation
2Fix the frame to the ceiling
using Screw B with the
Expansion Bolts.
Screw B
Expansion Bolts
1Assemble the four sides with
Screw A (total of 8) to create
the frame.
Screw A
4Slide the panel into the
frame channel. 5Reassemble the frame end
with the remaing Screw A
(total of 4).
3Once securely mounted to
the ceiling, disassemble one
end by removing Screw A
(toal of 4)
Kit Contents (Available for 1'x4', 2'x2' & 2'x4')
PART 1'x4' 2'x2' 2'x4' DIMENSIONS MATERIAL
Screw A 888 0.04" x .4" Zinc Coated Iron
Screw B 666 0.16" x .98" Zinc Coated Iron
Expansion Bolt 666 0.24" x 1.18" PVC
1' Frame 2 0 0 12.04” x 2.44” Aluminum
2' Frame 0 4 2 24.08” x 2.44” Aluminum
4' Frame 20248.17” x 2.44” Aluminum
Compatible Parts
1'X4'
MOUNT:
ESLC-DP-SMF-14-W
FIXTURES:
ESLC-DPS-14-U-P-2
ESLC-DP-14-U-P-30-xxK-80-D
2’X2’
MOUNT:
ESLC-DP-SMF-22-W
FIXTURES:
ESLC-DPS-22-U-P-2
ESLC-DP-22-U-P-yy-xxK-80-D
2’X4’
MOUNT:
ESLC-DP-SMF-24-W
FIXTURES:
ESLC-DPS-22-U-P-2
ESLC-DP-24-U-P-yy-xxK-80-D
/