Goodwe SCU3000 User manual

Type
User manual
User Manual
Smart Communication Unit
SCU3000&SCU3000A
V1.0-2023-07-28
Copyright StatementUser Manual V1.0-2023-07-28
I
No part of this manual can be reproduced or transmitted to the public platform
in any form or by any means
without the prior written authorization of GoodWe.
The information in this user manual is subject to change due to product updates or other reasons. This manual
cannot replace the product labels or the safety precautions unless otherwise specied. All descriptions in the
manual are for guidance only.
Copyright ©GoodWe Technologies Co., Ltd., 2023. All rights reserved.
Trademarks
NOTICE
and other GoodWe trademarks are trademarks of GoodWe Company. All other trademarks or
registered trademarks mentioned in this manual are owned by GoodWe Company.
CONTENT User Manual V1.0-2023-07-28
II
CONTENT
01 About This Manual ����������������������������������������������������������������� 1
1.1 Applicable Model ................................................................................................ 1
1.2 Target Audience ................................................................................................... 1
1.3 Symbol De󼴩nition ............................................................................................... 1
1.4 Updates ............................................................................................................... 1
2 Safety Precaution ����������������������������������������������������������������������� 2
2.1 General Safety ..................................................................................................... 2
2.2 Grounding Safety ............................................................................................... 2
2.3 Personal Safety ................................................................................................... 2
2.4 Equipment Safety ............................................................................................... 2
2.5 De󼴩nition of Warning Labels .............................................................................. 3
2.6 Personnel Requirements .................................................................................... 3
2.7 EU Declaration of Conformity ............................................................................. 3
3 Product Introduction ����������������������������������������������������������������� 4
3.1 Functions ............................................................................................................. 4
3.2 Networking .......................................................................................................... 4
3.3 Parts and Dimension ........................................................................................... 5
3.4 Nameplate ........................................................................................................... 6
3.5 Internal Composition .......................................................................................... 7
3.6 Electrical Diagram ............................................................................................... 8
3.7 RS485 Communication Networking ................................................................... 9
3.8 PLC Communication Networking ..................................................................... 10
4 Check and Storage �������������������������������������������������������������������11
4.1 Check before Receiving .................................................................................... 11
4.2 Storage ............................................................................................................... 11
4.3 Deliverables ....................................................................................................... 11
5 Installation ����������������������������������������������������������������������������12
5.1 Installation Requirements ............................................................................... 12
5.2 SCU Installation ................................................................................................. 14
5.2.1 Moving the SCU ................................................................................................................... 14
5.2.2 Wall-Mounting .................................................................................................................... 14
5.2.3 Pole-Mounting .................................................................................................................... 15
5.2.4 Standing-Mounting ............................................................................................................ 15
5.3 Opening the Cabinet Door ................................................................................ 16
6 Electrical Connection �������������������������������������������������������������17
6.1 Safety Precaution .............................................................................................. 17
CONTENT
User Manual V1.0-2023-07-28
III
6.2 Connecting the PE Cable .................................................................................. 19
6.3 Connecting the Three-Phase AC Input Cable .................................................. 20
6.4 Connecting the Single-Phase Power Cable ..................................................... 21
6.5 Connecting the RS485 Communication Cable ................................................ 22
6.6 Connecting the Optical Fiber ............................................................................ 23
6.7 Connecting the DO/DI/AI/PT100/PT1000 Signal Cable ................................... 23
7 Equipment Commissioning �����������������������������������������������������24
7.1 Check before Power On .................................................................................... 24
7.2 Power On ........................................................................................................... 24
8 System Commissioning ������������������������������������������������������������25
8.1 Commissioning of the SCU ............................................................................... 25
8.2 Closing the Cabinet Door .................................................................................. 25
9 Maintenance ���������������������������������������������������������������������������26
9.1 Power O󼴨 .......................................................................................................... 26
9.2 Periodic Maintaining ......................................................................................... 26
9.3 Removing the SCU ............................................................................................ 27
9.4 Disposing of the SCU ......................................................................................... 27
9.4 Troubleshooting ................................................................................................ 28
10 Technical Parameters �������������������������������������������������������������29
1
About This ManualUser Manual V1.0-2023-07-28
01 About This Manual
1.1 Applicable Model
1.2 Target Audience
This manual applies to trained and knowledgeable technical professionals only. The technical personnel has to be
familiar with the product, local standards, and electric systems.
1.3 Symbol Denition
1.4 Updates
The latest document contains all the updates made in earlier issues.
V1.0 2023-07-28
First Issue
Dierent levels of warning messages in this manual are dened as follows:
DANGER
Indicates a high-level hazard that, if not avoided, will result in death or serious injury.
WARNING
Indicates a medium-level hazard that, if not avoided, could result in death or serious injury.
CAUTION
Indicates a low-level hazard that, if not avoided, could result in minor or moderate injury.
NOTICE
Highlight and supplement the texts. Or some skills and methods to solve product-related problems to save time.
This manual describes the product information, installation, electrical connection, commissioning, troubleshooting,
and maintenance. Read through this manual before installing and operating the product. All the installers and
users have to be familiar with the product features, functions, and safety precautions. This manual is subject to
update without notice. For more product details and latest documents, please visit www.gesolarinverter.com.
This manual applies to Smart Communication Unit: SCU3000 and SCU3000A (SCU for short).
02 Safety Precaution User Manual V1.0-2023-07-28
2
2 Safety Precaution
2.1 General Safety
2.2 Grounding Safety
2.3 Personal Safety
Notice
The information in this document is subject to change due to product updates or other reasons. This
document cannot replace the product labels or the safety precaution unless otherwise specied. All
descriptions here are for guidance only.
Before installations, read through this document to learn about the product and the precautions.
All installations should be performed by trained and knowledgeable technicians who are familiar with local
standards and safety regulations.
Strictly follow the installation, operation, and conguration instructions in this document. The manufacturer
shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more
warranty details, visit https://www.goodwe.com/support-service/warranty-related.
NOTICE
The equipment is designed and tested strictly in compliance with related safety rules. Read and follow all the safety
instructions and cautions before any operations. Improper operation might cause personal injury or property
damage as the equipments are electrical equipment.
Danger
When installing the equipment, the grounding cable must be installed rst; when removing the equipment, the
grounding cable must be removed last.
Warning
Connect a PE cable to the nearest grounding point of the equipment.
Choose the grounding point outside the cabinet for grounding as priority.
Make sure the equipment is reliably grounded before operation.
Danger
Use insulating tools and wear personal protective equipment (PPE) when operating the equipment to ensure
personal safety.
Do not touch the equipment when it is short-circuited. Keep away from the equipment, and turn o the power
immediately.
Before wiring, disconnect all upstream switches to ensure the equipment is not powered on.
2.4 Equipment Safety
Danger
Make sure the installation place is solid enough to bear the equipment weight before installation.
Warning
Use appropriate tools for proper installation, maintenance, etc.
Observe local standards and safety regulations when operating the equipment.
Unauthorized disassembly or modication may cause damage to the equipment, which is not covered within
the warranty scope.
02 Safety PrecautionUser Manual V1.0-2023-07-28
3
2.5 Denition of Warning Labels
Danger
All labels and warning marks must be clear and distinct after the installation. Do not block, alter, or damage
any label.
Warning labels on the equipment are as follows.
2.6 Personnel Requirements
Notice
Personnel who install or maintain the equipment must be strictly trained, learn about safety precautions and
correct operations.
Only qualied professionals or trained personnel are allowed to install, operate, maintain, and replace the
equipment or parts.
HIGH VOLTAGE HAZARD
Power o the equipment before
any operations.
Potential risks exist. Wear proper PPE
before any operations.
Read through the user manual
before any operations.
Grounding point.
CE marking Do not dispose of the equipment as
household waste. Discard the product
in compliance with local laws and
regulations, or send it back to the
manufacturer.
2.7 EU Declaration of Conformity
The equipment without wireless communication modules sold in the European market meets the requirements of
the following directives:
Electromagnetic compatibility Directive 2014/30/EU (EMC)
Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
Waste Electrical and Electronic Equipment 2012/19/EU
Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
You can download the EU Declaration of Conformity on: https://en.goodwe.com.
4
03 Product Introduction User Manual V1.0-2023-07-28
3 Product Introduction
Environmental monitoring
instrument (EMI) Inverter MV Station
Switch
3.1 Functions
The SCU is one outdoor smart communication unit, integrating EzLogger, PLC CCO module, Fiber channel switch
(FC switch), Fiber optic splice closure (FOSC), and so on, which
Supports receiving and processing data reported by inverters via PLC or RS485 communication.
Able to report or receive commands from the monitoring platform via Ethernet or the optical ber.
Allows multiple SCU3000s to communicate in a ber ring network with built-in FC switch.
Supports wall mounting, standing and pole mounting, which is convenient for equipment installation,
maintenance and other operations.
Equips security locks on the cabinet door to ensure the safety of the equipment.
3.2 Networking
Router
Monitoring server
Smart meter
……
……
SCU 1
Local monitoring platform
Supports up to 15 SCUs for ber ring networking.
A single PLC communication channel in SCU can support a maximum of 60 inverters' connections.
A single RS485 communication channel in SCU can support a maximum of 20 inverters’ connections.
SCU N
SCU 15
5
03 Product IntroductionUser Manual V1.0-2023-07-28
3.3 Parts and Dimension
Cabinet door Lock
Mounting plate
Grounding point
Fixing hole Fixing holeCable routing hole
Ventilation
valve
226mm
(8.90in.)
201mm
(7.91in.)
723mm
(28.46in.)
600mm
(23.62in.)
700mm
(27.56in.)
780mm
(30.71in.)
180mm
(7.09in.)
660mm
(25.98in.)
488mm
(19.21in.)
144mm
(5.67in.)
6
03 Product Introduction User Manual V1.0-2023-07-28
Product type and model
Technical parameters
Safety symbols and certication marks
GoodWe Logo, contact information and serial number
The nameplate is for reference only.
3.4 Nameplate
7
03 Product IntroductionUser Manual V1.0-2023-07-28
3.5 Internal Composition
No. Item Explanation
1(Optional)
PLC CCO module
PLC CCO module is used in dual split-box transformer scenarios. It is used to
report the data from the inverter to the monitoring platform, and transmit the
commands back to inverters. All data are kept in Ezlogger.
Optionally, SCU3000A can select a built-in HPLC_CCO module, while SCU3000
can select a built-in PLC_CCO module.
2 Switch
The switch is a 2-ber 6-electrical industrial ring network switch. It is internally
connected to EzLogger via electrical ports and externally connected to the
router, switch, or computer via Ethernet cables or optical bers.
3 EzLogger Smart data logger.
4Power adapter An AC to DC power module that provides 24V, 3.2A DC power to SCU.
5 Fiber optic splice closure (FOSC) Used to connect to the switch via the optical ports internally, and to lead out
the ber externally.
6 Reserved installation place Prepare other equipments if needed. Rail specication: 35mm in height and
45mm in width.
7RS485 communication terminal Connects to the RS485 communication equipment terminal.
8Grounding point for RS485 commu-
nication Ground terminal for the shielding layer of the RS485 communication cable.
9Single-phase input switch Single-phase AC circuit breaker, with a specication of 1P, 400V, 25A.
10 Three-phase input switch Three-phase AC circuit breaker, with a specication of 3P, 1000V, 32A, which
connects with PLC1 cable; .
11 (Optional) Three-phase input switch Three-phase AC circuit breaker, with a specication of 3P, 1000V, 32A, which
connects with PLC2 cable.
12 Surge protection module (SPD) Single-phase AC surge protection module with a specication of 385V AC/20kA.
13 Surge protection module (SPD) Three-phase AC surge protection module with a specication of 1500V AC/
20kA.
14 (Optional) Surge protection module
(SPD)
Three-phase AC surge protection module with a specication of 1500V AC/
20kA.
15 Grounding bar Protective earthing (PE) bar to protect the SCU.
8
03 Product Introduction User Manual V1.0-2023-07-28
3.6 Electrical Diagram
L1
L2
L3
L1
L2
L3
N
L
F01
F02
F03
PLC_CCO Module
PLC CAN
DC IN
24V_2
Power
module
24V_1
24V_3
AC
IN DC IN
ETH1
CAN
EzLogger
FOSC
ETH ETH
DC IN
FC switch
Longitudinal
encryption
equipment
RS485 A1/B1
ETH
ETH
Optical
ber
ETH
DC IN
SC SC SC SC
SC SC SC SC
PLC
ETH
Optical
ber
RS485
1/2/3/4
RS485
5/6/7/8
RS485 A2/B2
RS485 A3/B3
RS485 A4/B4
RS485 A5/B5
RS485 A6/B6
RS485 A7/B7
RS485 A8/B8
24V_4
ETH
Please note that the dashed lines indicate optional modules.
F01/F02/F03 are Surge protection modules.
ETH
ETH
9
03 Product IntroductionUser Manual V1.0-2023-07-28
3.7 RS485 Communication Networking
The SCU supports connecting to inverters, transformers, environmental monitoring equipments, and other
equipments via the RS485 communication.
Three-phase circuit breaker
......
Station power
supply
Single-phase circuit breaker
Inverter 1
Inverter N (2 N 20)
......
Single-phase
switch
Grounding bar
RS485 termi-
nal block
Power module
EzLogger
PE cable AC cable
RS485 cable Power cable
SCU
Transformer
(Double-split scenario)
Busbar of LV
side in MVS
Busbar of LV
side in MVS
10
03 Product Introduction User Manual V1.0-2023-07-28
3.8 PLC Communication Networking
SCU supports PLC communication.
When connecting to a dual-winding transformer, only one PLC communication is required through the three-
phase AC wire.
When connecting to a dual split transformer, two PLC communications are required through the three-phase AC
wire.
PE cable AC cable
Signal cable Power cable
Transformer
(Double-split scenario)
Three-phase circuit breaker
Busbar of LV
side in MVS
Station power
supply
Inverter
Inverter
Single-
phase
switch
Grounding
bar
PLC CCO
Power module
Three-
phase
switch
EzLogger
SCU
Single-phase
circuit breaker
Busbar of LV
side in MVS
11
04 Check and StorageUser Manual V1.0-2023-07-28
4 Check and Storage
4.1 Check before Receiving
4.3 Deliverables
Notice
Use the delivered terminals and screws. The manufacturer shall not be liable for the equipment damage if
other connectors or terminals are used.
PLC communication OT terminals: 6 in double-split scenario, 3 in dual-winding scenario.
4.2 Storage
Check the following items before receiving the product.
1. Check the outer packing box for damage, such as holes, cracks, deformation, and others signs of equipment
damage. Do not unpack the package and contact the supplier as soon as possible if any damage is found.
2. Check the product model. If the product model is not what you requested, do not unpack the product and
contact the supplier.
3. Check the deliverables for correct model, complete contents, and intact appearance. Contact the supplier as
soon as possible if any damage is found.
If the equipment is not to be installed or used immediately, please ensure that the storage environment meets the
following requirements:
1. Do not unpack the outer package or throw the desiccant away.
2. Store the equipment in a clean place. Make sure the temperature and humidity are appropriate and no
condensation.
3. Stack the equipment complying with the labels and requirements on the packing box.
4. The equipment must be stacked with caution to prevent them from falling.
5. If the equipment has been long term stored, it should be checked by professionals before being put into use.
SCU *1 Screw for grounding
*1
Tube terminal *16 6PIN terminal *4
PLC OT terminal *4
OT terminal for
grounding internally *1
Document *1
OT terminal for grounding
& RS485 communication
*3
Screw for RS485
communication *2
M12 exposition bolt
*4
Tube terminal *2
Key *42PIN terminal *6 4PIN terminal *8 Storage card *1
12
05 Installation User Manual V1.0-2023-07-28
0%~95%RH
IP65
ALT: 5000m
(16404ft)
Children No Touch
5 Installation
5.1 Installation Requirements
1. Do not install the equipment in a place near ammable, explosive, or corrosive materials.
2. Install the equipment on a surface that is solid enough to bear its weight.
3. The place to install the equipment shall be well-ventilated for heat radiation and large enough for operations.
4. The equipment with a high ingress protection rating can be installed outdoors.The temperature and humidity at
the installation site should be within the appropriate range.
5. It is recommended to install the equipment in a sheltered place.
6. Do not install the equipment in a place that is easy to touch, especially within children’s reach.
7. Install the equipment at a height that is convenient for operation and maintenance, electrical connections, and
checking indicators and labels.
8. Install the equipment away from electromagnetic interference.
Installation Environment Requirements
Mounting Support Requirements
The mounting support shall be nonammable and reproof.
Install the equipment on a surface that is solid enough to bear its weight.
200mm
(7.87in.)
500mm
(19.69in.)
200mm
(7.87in.)
200mm
(7.87in.)
200mm
(7.87in.)
200mm
(7.87in.)
13
05 InstallationUser Manual V1.0-2023-07-28
M5/M12
M4/M6
M3
The following tools are recommended when installing the equipment. Use other auxiliary tools on site if necessary.
Installation Tool Requirements
Multimeter
Goggles Safety shoes Safety gloves Dust mask RJ45 crimping tool
Diagonal pliers Wire stripper Hammer drill Heat gun Crimping tool
Marker Level Heat shrink tube Rubber hammer
Vacuum cleaner Torque wrench
Cable tie Socket wrench
14
05 Installation User Manual V1.0-2023-07-28
1
3
2
CAUTION
Move the equipment to the site before installation. Follow the instructions below to avoid personal injury or
equipment damage.
1. Consider the weight of the equipment before moving it. Assign enough personnel to move the equipment to
avoid personal injury.
2. Wear safety gloves to avoid personal injury.
3. Keep the equipment in balance during moving to avoid its falling down.
Notice
Avoid the water pipes and cables buried in the wall when drilling holes.
Wear goggles and a dust mask to prevent the dust from being inhaled or contacting eyes when drilling holes.
5.2 SCU Installation
5.2.1 Moving the SCU
5.2.2 Wall-Mounting
Step 1 Put the SCU on the wall horizontally and mark positions for drilling holes.
Step 2 Drill holes to a depth of 70mm with the hammer drill. The diameter of the drill bit should be 15mm.
Step 3 Lift the SCU by two persons and hang it onto the exposition bolts. Secure the SCU with the assistance of a
third person using a socket wrench to tighten the expansion bolts.
Depth:
70mm (2.76in.) Diameter:
15mm (0.59in.)
30mm
(1.18in.)
15
05 InstallationUser Manual V1.0-2023-07-28
1 2
3
M12
42N·m
5.2.3 Pole-Mounting
Notice
When installing the SCU around a pole, prepare the necessary pole mounting accessories.
5.2.4 Standing-Mounting
Notice
When installing the SCU in a standing position, please choose a suitable location with two sturdy bases.
It is recommended to use M12 bolts to secure the SCU into the bases.
Step 1 Put the SCU on two at bases and mark positions for drilling holes.
Step 2 Drill holes to a depth of 70mm with the hammer drill. The diameter of the drill bit should be 15mm.
Step 3 Fix the SCU on the bases with M12 bolts.
M12
42N·m
180mm
(7.09in.)
660mm
(25.98in.)
Φ: 15mm (0.59in.)
D: 70mm (2.76in.)
16
05 Installation User Manual V1.0-2023-07-28
5.3 Opening the Cabinet Door
Notice
Please use the key to open the cabinet door of the SCU. Keep the keys properly after usage for future use.
Step 1 Insert the keys into the three lock cylinders separately.
Step 2 Turn the keys clockwise.
Step 3 Open the cabinet door.
Warning
Take protective measures to prevent the rain or snow from entering the cabinet when opening the cabinet door
in rainy or snowy weather. If the rain or snow cannot be prevented from entering the cabinet, do not open the
cabinet door.
Before opening the cabinet door, make sure that the main switch of the SCU is disconnected. If energized
operation is required, please take appropriate insulation protection measures.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34

Goodwe SCU3000 User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI