IS-52010-US
We’re here to help 866-558-5706
Hrs: M-F 9am to 5pm EST
7) Pass xture wire from threaded tube aached to upper mounng plate[S]
through coupling[I].
8) Screw coupling[I] onto protruding poron of threaded tube to ghten down
upper nial[U] and mounng plate cover[T].
9) Pass xture wire from the coupling[I] through a stem[M] and threaded
tubes[N] and screw stem into coupling.
NOTE: Thread locking compound must be applied to all stem threads as
noted with symbol (4) to prevent accidental rotaon of xture during
cleaning, relamping, etc.
10) Pass xture wire through desired amount of stems and screw stems together
using supplied short threaded tubes.
11) Pass xture wire from last stem through loop[L]. Thread loop onto end of
last stem.
12) Take threaded pipe[A] from parts bag and screw in screw collar loop[B] a
minimum of 6 mm (1/4”). Lock into place with hexnut[C].
13) Run another hexnut down threaded pipe almost touching rst hexnut.
Now screw threaded pipe into mounng strap[D]. Mounng strap must be
posioned with extruded thread faced into outlet box[E]. Threaded pipe
must protrude out the back of mounng strap. Screw third hexnut onto end
of threaded pipe protruding from back of mounng strap.
14) Connect mounng strap[D] to outlet box using the strap mounng
screws[K].
15) Unscrew the threaded ring[F] from screw collar loop. Take canopy[G] and pass
over screw collar loop. Approximately one half of the screw collar loop exterior
threads should be exposed. Adjust screw collar loop by turning assembly up or
down in mounng strap. Remove canopy.
16) Aer desired posion is found, ghten both top and boom hexnuts up
against the boom and top of the mounng strap.
17) Slip canopy over screw collar loop and thread on threaded ring. Aach chain
link[H] (with xture connected) to screw collar loop. Close the open link by
wrapping with a towel and squeezing closed using pliers. Unscrew threaded
ring, let canopy and threaded ring slip down.
18) Pass electrical wire and ground wire through chain link[H], threaded ring[F],
canopy, screw collar loop, threaded pipe and into outlet box.
19) Grounding instrucons: (See Illus. a or b).
a) On xtures where mounng strap is provided with a hole and two raised
dimples, wrap ground wire from outlet box around green ground screw,
and thread into hole.
b) On xtures where a cupped washer is provided, aach ground wire from
outlet box under cupped washer and green ground screw, then thread
into mounng strap.
If xture is provided with ground wire, connect xture ground wire to outlet
box ground wire with wire connector aer following the above steps. Never
connect ground wire to black or white power supply wires.
20) Make wire connecon. Reference chart below for correct connecons and
wire accordingly.
Connect Black or Red
Supply Wire to:
Connect White Supply
Wire to:
Black White
*Parallel cord (round &
smooth)
*Parallel cord (square &
ridged)
Clear, Brown, Gold or
Black without Tracer
Clear, Brown, Gold or Black
with Tracer
Insulated wire (other
than green) with copper
conductor
Insulated wire (other
than green) with silver
conductor
*Note: When parallel wire (SPT
1 & SPT 2) are used. The neutral
wire is square shaped or ridged
and the other wire will be round
in shape or smooth (See illus.)
Neutral Wire
21) Raise canopy to ceiling.
22) Secure canopy in place by ghtening threaded ring onto screw collar loop.
23) Install the recommended bulbs (not supplied).
24) Carefully lower glass shades[J] to the xture. Slip the smaller opening over
the socket unl seated on the socket.
GREEN GROUND
SCREW
CUPPED
WASHER
OUTLET BOX
GROUND
FIXTURE
GROUND
DIMPLES
WIRE CONNECTOR
OUTLET BOX
GROUND
GREEN GROUND
SCREW
FIXTURE
GROUND
a
b
Fixture Diagram
Parts List
Cauons
CAUTION – RISK OF SHOCK –
Disconnect Power at the main circuit breaker panel or main fusebox before
starng and during the installaon.
WARNING:
This xture is intended for installaon in accordance with the Naonal Electrical
Code (NEC) and all local code specicaons. If you are not familiar with code
requirements, installaon by a cered electrician is recommended.
Installaon Instrucons
1) Aach lower decorave secon[O] to main ring[P] using decorave
screws[Q] (6 places).
2) Locate decorave tube[R] with xture wire already threaded through. Aach
decorave tube [R] to main ring[P] by screwing tube onto threaded pipe
aached to main ring. Repeat for remaining 3 decorave tubes.
3) Aach decorave tube[R] to loop on upper mounng plate[S] using open
chain link[H]. Once aached, close the open chain link by placing a piece
of cloth over the open link and using a pair of pliers gently squeeze the link
closed. Repeat for remaining 3 decorave tubes.
4) Pass xture wire from decorave tube[R] through loop and threaded tube
connected to upper mounng plate[S].
5) Slide mounng plate cover[T] down over upper mounng plate[S], ensuring
the threaded tube aached to the upper mounng plate is protruding
through the center hole of the mounng plate cover.
6) Slide upper nial[U] down over exposed threaded tube onto the top of the
mounng plate cover[T].
Installaon Instrucons (connued)
[A] Threaded Pipe
[B] Screw Collar Loop
[C] Hexnut
[D] Mounting Strap
[E] Outlet Box
[F] Threaded Ring
[G] Canopy
[H] Chain Link
[I] Coupling
[J] Glass Shade
[K] Strap Mounting
Screws
[L] Loop
[M] Stem
[N] Threaded Tubes
[O] Lower Decorative
Section
[P] Main Ring
[Q] Decorative Screws
[R] Decorative Tube
[S] Upper Mounting
Plate
[T] Mounting Plate
Cover
[U] Upper Finial
E
D
C
K
A
G
B
F
H
►
L
M
N
►
►
►
I
U
T
S
H
R
P
O
Q
J