Cisco Systems OL-7822-06 User manual

Category
Gateways/controllers
Type
User manual
Americas Headquarters
Cisco Systems, Inc.
170 West Tasman Drive
San Jose, CA 95134-1706
USA
http://www.cisco.com
Tel: 408 526-4000
800 553-NETS (6387)
Fax: 408 527-0883
Cisco Service Control Engine 1000 2xGBE
Quick Start Guide
Release 3.1
May 2007
Customer Order Number:
Text Part Number: OL-7822-06
THE SPECIFICATIONS AND INFORMATION REGARDING THE PRODUCTS IN THIS MANUAL ARE SUBJECT TO CHANGE WITHOUT NOTICE. ALL
STATEMENTS, INFORMATION, AND RECOMMENDATIONS IN THIS MANUAL ARE BELIEVED TO BE ACCURATE BUT ARE PRESENTED WITHOUT
WARRANTY OF ANY KIND, EXPRESS OR IMPLIED. USERS MUST TAKE FULL RESPONSIBILITY FOR THEIR APPLICATION OF ANY PRODUCTS.
THE SOFTWARE LICENSE AND LIMITED WARRANTY FOR THE ACCOMPANYING PRODUCT ARE SET FORTH IN THE INFORMATION PACKET THAT
SHIPPED WITH THE PRODUCT AND ARE INCORPORATED HEREIN BY THIS REFERENCE. IF YOU ARE UNABLE TO LOCATE THE SOFTWARE LICENSE
OR LIMITED WARRANTY, CONTACT YOUR CISCO REPRESENTATIVE FOR A COPY.
The Cisco implementation of TCP header compression is an adaptation of a program developed by the University of California, Berkeley (UCB) as part of UCB’s public
domain version of the UNIX operating system. All rights reserved. Copyright © 1981, Regents of the University of California.
NOTWITHSTANDING ANY OTHER WARRANTY HEREIN, ALL DOCUMENT FILES AND SOFTWARE OF THESE SUPPLIERS ARE PROVIDED “AS IS” WITH
ALL FAULTS. CISCO AND THE ABOVE-NAMED SUPPLIERS DISCLAIM ALL WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING, WITHOUT
LIMITATION, THOSE OF MERCHANTABILITY, FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT OR ARISING FROM A COURSE OF
DEALING, USAGE, OR TRADE PRACTICE.
IN NO EVENT SHALL CISCO OR ITS SUPPLIERS BE LIABLE FOR ANY INDIRECT, SPECIAL, CONSEQUENTIAL, OR INCIDENTAL DAMAGES, INCLUDING,
WITHOUT LIMITATION, LOST PROFITS OR LOSS OR DAMAGE TO DATA ARISING OUT OF THE USE OR INABILITY TO USE THIS MANUAL, EVEN IF CISCO
OR ITS SUPPLIERS HAVE BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.
Any Internet Protocol (IP) addresses used in this document are not intended to be actual addresses. Any examples, command display output, and figures included in the
document are shown for illustrative purposes only. Any use of actual IP addresses in illustrative content is unintentional and coincidental.
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
© 2007 Cisco Systems, Inc. All rights reserved.
CCSP, the Cisco Square Bridge logo, Follow Me Browsing, and StackWise are trademarks of Cisco Systems, Inc.; Changing the Way We Work, Live, Play, and Learn, and iQuick
Study are service marks of Cisco Systems, Inc.; and Access Registrar, Aironet, ASIST, BPX, Catalyst, CCDA, CCDP, CCIE, CCIP, CCNA, CCNP, Cisco, the Cisco Certified
Internetwork Expert logo, Cisco IOS, Cisco Press, Cisco Systems, Cisco Systems Capital, the Cisco Systems logo, Cisco Unity, Empowering the Internet Generation,
Enterprise/Solver, EtherChannel, EtherFast, EtherSwitch, Fast Step, FormShare, GigaDrive, GigaStack, HomeLink, Internet Quotient, IOS, IP/TV, iQ Expertise, the iQ logo, iQ
Net Readiness Scorecard, LightStream, Linksys, MeetingPlace, MGX, the Networkers logo, Networking Academy, Network Registrar, Packet, PIX, Post-Routing, Pre-Routing,
ProConnect, RateMUX, ScriptShare, SlideCast, SMARTnet, StrataView Plus, SwitchProbe, TeleRouter, The Fastest Way to Increase Your Internet Quotient, TransPath, and VCO
are registered trademarks of Cisco Systems, Inc. and/or its affiliates in the United States and certain other countries.
All other trademarks mentioned in this document or Website are the property of their respective owners. The use of the word partner does not imply a partnership relationship
between Cisco and any other company. (0501R)
iii
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
CONTENTS
CHAPTER
1 Prepare for Installation 1-1
Information About Preparing for Installation 1-1
Site Preparation and Unpacking 1-1
Tools and Parts 1-2
Prepare for Rack-Mount Installation 1-2
Workbench or Tabletop Installation 1-2
CHAPTER
2 Rack-Mount the SCE 1000 2-1
The SCE 1000 Mounting Brackets 2-1
Attach the Brackets to the SCE 1000 2-2
Installing the Crossrail Supports (Four-post rack only) 2-3
Assemble the Crossrail Supports 2-3
Attach the Crossrail Supports to the Rack 2-4
Mount the System to the Rack 2-4
CHAPTER
3 Connect the Power Supply Units 3-1
Connect the Chassis Ground 3-1
Connecting the Power 3-2
Connect the DC-Input Power Supply Unit 3-3
Connect the AC-Input Power Supply Unit 3-4
CHAPTER
4 Connect the Management Interfaces and Perform Initial System Configuration 4-1
Connect the Local Console 4-1
Perform the Initial System Configuration 4-2
Initial System Configuration 4-2
The Setup Command 4-3
Setup Command Parameters 4-4
Example 4-6
Step 1: Configuring Initial Settings 4-6
Example 4-7
Step 2: Configuring the Hostname 4-7
Step 3: Setting the Passwords 4-7
Contents
iv
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
EXAMPLE: 4-8
Step 4: Configuring Time Settings 4-8
EXAMPLE: 4-10
Step 5: Configuring the DNS Settings 4-10
EXAMPLE: 4-11
Step 6: Configuring the RDR Formatter Destination 4-12
EXAMPLE: 4-12
Step 7: Configuring Access Control Lists (ACLs) 4-12
Information About Access Control Lists 4-12
Examples 4-15
Step 8: Configuring SNMP 4-16
EXAMPLE: 4-19
Step 9: Configuring the Topology-Dependent Parameters 4-20
About the Topology-Dependent Parameters 4-20
Examples 4-21
Step 10: Completing and Saving the Configuration 4-22
Examples 4-24
Connect the Management Interface 4-25
EXAMPLE: 4-25
CHAPTER
5 Cable the Line Ports 5-1
Information About Cabling 5-1
Single Link: Inline Topology 5-1
Single Link: Receive-only Topology 5-2
Cabling the Line Interfaces 5-3
Configure GigabitEthernet Auto-Negotiation 5-3
Connect the GBE Line Interface Ports 5-4
CHAPTER
6 Completing the Installation 6-1
Examining the LEDs 6-1
Final Tests 6-1
Verifying Operational Status 6-1
Example: 6-2
Viewing the User Log Counters 6-2
EXAMPLE: 6-2
Viewing Configuration 6-2
Saving the Configuration Settings 6-3
Examples 6-4
EXAMPLE 1: 6-4
Contents
v
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
EXAMPLE 2: 6-4
CHAPTER
7 Installing a Service Control Application 7-1
Advanced Configuration of the SCE Platform 7-1
Loading and Activating a Service Control Application 7-1
CHAPTER
8 Troubleshoot Startup Problems 9-1
SCE 1000 Operational Status 9-1
Identifying Startup Problems 9-3
CLI Commands for Troubleshooting 9-3
Contents
vi
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
CHAPTER
1-1
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
1
Prepare for Installation
This section contains warnings, information about tools and parts, site preparation information, and
information for workbench or tabletop installation and rack-mount installation.
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you
work on any equipment, be aware of the hazards involved with electrical circuitry and be familiar with
standard practices for preventing accidents. To see translations of the warnings that appear in this
publication, refer to the translated safety warnings that accompanied this device.
Only trained and qualified personnel should install, replace, or service this equipment.
Read the installation instructions before you connect the system to its power source.
This unit is intended for installation in restricted access areas. A restricted access area is where access
can only be gained by service personnel through the use of a special tool, lock and key, or other means
of security, and is controlled by the authority responsible for the location.
Voltage is present on the backplane when the system is operating. To reduce risk of an electric shock,
keep hands and fingers out of the power supply bays and backplane areas.
Do not work on the system or connect or disconnect cables during periods of lightning activity.
Before beginning the installation of the SCE 1000, read the Regulatory Compliance and Safety
Information for the Cisco Service Control Engine document.
Information About Preparing for Installation
Site Preparation and Unpacking, page 1-1
Tools and Parts, page 1-2
Prepare for Rack-Mount Installation, page 1-2
Site Preparation and Unpacking
Lift the SCE 1000 platform safely out of the packing container.
Ensure the power service at the site is suitable for the SCE 1000 platform.
Check the packing slip to ensure that all the proper components are present.
Locate and have accessible the Site Log for recording information about this installation.
1-2
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 1 Prepare for Installation
Workbench or Tabletop Installation
Tools and Parts
Use the following list of tools and parts as a checklist for preparing for installing the SCE 1000 platform:
Appropriate cables to connect the SCE 1000 to the network and console terminal
Tape measure (optional)
Level (optional)
Number 1 Phillips screwdriver
Number 2 Phillips screwdriver
1/4-inch flat-blade screwdriver
1/4-inch hex wrench
Grounding kit (shipped with the SCE 1000)
12 AWG or 2.5 mm copper installation wire with hex or loop connectors for DC power leads (DC
power only) Ring terminals must be UL approved and suitable for 12 AWG wire.
AC power cords (AC power only, shipped with SCE 1000)
Rack-mounting kit (shipped with SCE 1000)
Spare screws for changing bracket position
Prepare for Rack-Mount Installation
Before you begin the rack-mounting tasks, determine the type of rack—four-post or two-post—that you
will be using.
Workbench or Tabletop Installation
Figure 1-1 Tabletop Installation of the SCE 1000 Platform
For a workbench or tabletop installation, verify the following before installing the SCE 1000 platform:
The SCE 1000 platform is off the floor and has adequate ventilation.
C
is
c
o
S
C
E
1
0
0
0
S
eries
2
x
G
B
E
L
IN
K
R
X
T
X
R
X
M
M
T
X
L
IN
K
R
X
T
X
R
X
M
M
T
X
G
B
E
-1
S
U
B
L
IN
E
N
E
T
P
W
R
B
S
T
A
T
U
S
P
W
R
A
B
Y
P
A
S
S
1
0
/
1
0
0
/
1
0
0
0
L
I
N
K
/
A
C
T
I
V
E
1
0
/
1
0
0
/
1
0
0
0
L
I
N
K
/
A
C
T
I
V
E
AUX
C
O
N
S
O
L
E
MNG 2
MNG 1
1
2
92967
1-3
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 1 Prepare for Installation
Workbench or Tabletop Installation
An adequate chassis ground (earth) connection exists for the SCE 1000 platform.
The SCE 1000 platform has at least 2 inches (5 cm) of clearance at each side and at least 5 inches
(12.7 cm) of clearance at the rear to allow proper air flow.
Step 1 Remove the adhesive strips from the four rubber feet and affix the feet onto the four marked locations
on the bottom panel of the unit.
Step 2 Place the SCE 1000 platform on the tabletop or workbench.
1-4
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 1 Prepare for Installation
Workbench or Tabletop Installation
CHAPTER
2-1
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
2
Rack-Mount the SCE 1000
This section provides information for rack-mounting the SCE 1000 platform.
The SCE 1000 Mounting Brackets
Attach the Brackets to the SCE 1000
Installing the Crossrail Supports (Four-post rack only)
Mount the System to the Rack
The SCE 1000 Mounting Brackets
There are two standard types of equipment racks, and the appropriate brackets for each are provided in
the enclosed kit.
19” rack with front rack posts — the mounting kit includes two mounting brackets as illustrated
below:
Figure 2-1 Mounting Bracket for 2-post Racks
19” rack with front and back rack posts — in addition to the mounting brackets illustrated below,
the mounting kit includes two crossrail supports that the unit slides onto.
210429
2-2
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 2 Rack-Mount the SCE 1000
Attach the Brackets to the SCE 1000
Figure 2-2 Mounting Bracket for 4-post Racks
The SCE 1000 mounts to the two front rack posts with brackets that attach to the front of the SCE 1000
The inside width between the two posts or mounting strips (left and right) must be at least 17.3 inches
(44 cm).
Note Remember to leave a two-inch (5 cm) clearance on both sides of the SCE 1000 and at the rear for
adequate airflow for the inlet and exhaust vents.
Attach the Brackets to the SCE 1000
Before installing the SCE 1000 in the rack, you must first install an appropriate rack-mount bracket on
each side of the front of the SCE 1000, as illustrated in the following figures.
Figure 2-3 Attaching the Mounting Brackets (4-post)
210430
L
IN
K
R
X
T
X
R
X
M
M
T
X
L
IN
K
R
X
T
X
R
X
M
M
T
X
P
W
R
B
S
T
A
T
U
S
P
W
R
A
B
Y
P
A
S
S
10/100/
1000
LINK
/
AC
T
IV
E
10/100/
10
00
LIN
K/
AC
T
IVE
A
U
X
C
O
N
S
O
L
E
M
N
G
2
M
N
G
1
Cisco SCE 1000
S
e
r
i
e
s
2xG
BE
GBE-1
SUB LINE
NET
1 2
210418
2-3
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 2 Rack-Mount the SCE 1000
Installing the Crossrail Supports (Four-post rack only)
Figure 2-4 Attaching the Mounting Brackets (2-post)
To install the rack-mount brackets on the SCE 1000 chassis, complete the following steps:
Before installing the SCE 1000 in the rack, you must first install a rack-mount bracket on each side of
the front of the SCE 1000.
Step 1 Align the rack-mount bracket to the side of the SCE 1000. Choose the proper bracket for your installation
(2-post rack or 4-post rack) as illustrated in Rack-Mount the SCE 1000
Step 2 Insert and tighten three screws.
Step 3 Repeat steps 1 and 2 on the other side of the SCE 1000.
If mounting the SCE 1000 in a rack with only two posts, skip to Mount the System to the Rack.
If mounting the SCE 1000 in a rack with four posts, proceed to the next step, Installing the Crossrail
Supports (Four-post rack only).
Installing the Crossrail Supports (Four-post rack only)
This section provides information for assembling the crossrail supports and attaching them to the rack.
When mounting in a rack with four posts (front and back) the two crossrail supports are mounted one on
each side of the rack. The SCE 1000 then slides into these crossrails, which support the weight of the
unit.
Assemble the Crossrail Supports
Attach the Crossrail Supports to the Rack
Assemble the Crossrail Supports
Step 1 Assemble the two crossrail supports. Use three screws for each crossrail assembly.
L
I
N
K
R
X
T
X
R
X
M
M
T
X
L
I
N
K
R
X
T
X
R
X
M
M
T
X
P
W
R
B
S
T
A
T
U
S
P
W
R
A
B
Y
P
A
S
S
1
0
/
1
0
0
/
1
0
0
0
L
IN
K
/
A
C
T
IV
E
1
0
/
1
0
0
/
1
0
0
0
L
IN
K
/
A
C
T
I
V
E
A
U
X
C
O
N
S
O
L
E
M
N
G
2
M
N
G
1
Cisco SC
E
1000
Series
2xGBE
GBE-1
SUB
LINE
NET
210603
1 2
2-4
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 2 Rack-Mount the SCE 1000
Mount the System to the Rack
Figure 2-5 Assembling the Slider Brackets
Step 2
Make sure that they are oriented so that both crossrails will support the SCE 1000 when they are attached
to the rack.
Attach the Crossrail Supports to the Rack
Step 1 Align the crossrail supports with the side of the rack, parallel to the floor.
Figure 2-6 Attaching the Crossrails to the Rack
Step 2
Insert and tighten two screws to the front posts or mounting strips of the rack
Step 3 Insert and tighten two screws to the Back posts of the rack.
Step 4 Repeat steps 2 and 3 on the other side of the rack, keeping the brackets flush against the posts and
parallel to the supporting bracket on first side of the rack.
Mount the System to the Rack
When the appropriate mounting brackets are securely installed, the SCE 1000 can be installed into the
rack.
321
92777
321
92778
2-5
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 2 Rack-Mount the SCE 1000
Mount the System to the Rack
SUMMARY STEPS
1. Make sure that the rack brakes are locked or that the rack is otherwise stabilized.
2. Position the SCE 1000 so that the front end is closest to you, and lift it carefully to place it into the
rack. To prevent injury, avoid sudden twists or moves.
3. Slide the SCE 1000 into the rack, pushing it back until the brackets (installed at the front of the SCE
1000) meet the mounting strips or posts on both sides of the rack.
4. While keeping the brackets flush against the posts or mounting strips, align the holes in the brackets
with the holes on the rack or mounting strip.
5. For each bracket, insert and tighten two appropriate screws to the rack.
DETAILED STEPS
Step 1 Make sure that the rack brakes are locked or that the rack is otherwise stabilized.
Figure 2-7 Sliding the SCE Platform into the Rack
Step 2
Position the SCE 1000 so that the front end is closest to you, and lift it carefully to place it into the rack.
To prevent injury, avoid sudden twists or moves.
Step 3 Slide the SCE 1000 into the rack, pushing it back until the brackets (installed at the front of the SCE
1000) meet the mounting strips or posts on both sides of the rack.
L
I
N
K
R
X
C
i
s
c
o
S
C
E
2
0
0
0
S
e
r
i
e
s
4
x
G
B
E
T
X
R
X
M
M
T
X
L
I
N
K
R
X
T
X
R
X
M
M
T
X
L
I
N
K
R
X
T
X
R
X
M
M
T
X
L
I
N
K
R
X
T
X
R
X
M
M
T
X
G
B
E
-
1
S
U
B
L
I
N
E
N
E
T
P
W
R
B
S
T
A
T
U
S
P
W
R
A
B
Y
P
A
S
S
1
0
/
1
0
0
/
1
0
0
0
L
I
N
K
/
A
C
T
I
V
E
1
0
/
1
0
0
/
1
0
0
0
L
I
N
K
/
A
C
T
I
V
E
G
B
E
-
2
S
U
B
L
I
N
E
/
C
A
S
C
A
D
E
N
E
T
A
U
X
C
O
N
S
O
L
E
M
N
G
2
M
N
G
1
L
IN
K
R
X
T
X
R
X
M
MT
X
L
IN
K
R
X
T
X
R
X
M
M
T
X
P
W
R
B
S
T
A
T
U
S
P
W
R
A
B
Y
P
A
S
S
10/100/
1000
LIN
K
/
A
C
T
IV
E
10/1
00/
1000
LIN
K
/
A
C
T
IVE
A
U
X
C
O
N
S
O
L
E
M
N
G
2
M
N
G
1
Cisco SC
E 1000
S
e
r
i
e
s
2xG
BE
GBE-1
SUB
LINE
NET
1 2 3
210419
2-6
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 2 Rack-Mount the SCE 1000
Mount the System to the Rack
A rack with both front and back posts will have the crossrail supports installed. Slide the SCE 1000 onto
these crossrails and push it all the way back.
Step 4 While keeping the brackets flush against the posts or mounting strips, align the holes in the brackets with
the holes on the rack or mounting strip.
Figure 2-8 Securing the SCE Platform to the Rack
Step 5
For each bracket, insert and tighten two appropriate screws to the rack.
Note Since the brackets support the weight of the entire SCE 1000 chassis, be sure to use all four screws to
fasten the two rack-mount brackets to the rack posts.
L
IN
K
R
X
T
X
R
X
M
M
T
X
L
IN
K
R
X
T
X
R
X
M
M
T
X
P
W
R
B
S
T
A
T
U
S
P
W
R
A
B
Y
P
A
S
S
1
0/100/
1
000
L
IN
K/
ACTIV
E
10/10
0/
1
000
LINK
/
A
CTIV
E
A
U
X
C
O
N
S
O
L
E
M
N
G
2
M
N
G
1
Cisco SCE 1000
S
e
r
i
e
s
2xGBE
GBE-1
SUB LINE
NET
321
210420
CHAPTER
3-1
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
3
Connect the Power Supply Units
This section provides information for grounding the SCE 1000 platform and connecting the AC or DC
power supply units.
Connect the Chassis Ground, page 3-1
Connecting the Power, page 3-2
Connect the Chassis Ground
Figure 3-1 Grounding the Unit (AC)
IN PO
W
ER B O
K
IN
POW
ER A O
K
BYP
ASS 1
210421
21
3-2
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 3 Connect the Power Supply Units
Connecting the Power
Figure 3-2 Grounding the Unit (DC)
A Grounding kit is provided with each SCE 1000. Use this Grounding kit to properly ground the SCE
1000 chassis.
When installing the unit, the chassis ground connection must always be made first and disconnected last.
Step 1 On the rear panel of the SCE 1000, locate the chassis grounding connector (refer to the appropriate figure
for an AC- or DC-powered SCE 1000 above).
Step 2 Attach the grounding cable (green and yellow colored cable), firmly fastening the (enclosed) hex nuts
and spring washers with a #¼” hex wrench (refer to the appropriate figure for an AC- or DC-powered
SCE 1000 above).
The other side of the grounding cable must be connected to the site equivalent of the AC earth.
Connecting the Power
The following sections describe how to reconnect the AC or DC power:
Connect the DC-Input Power Supply Unit, page 3-3
Connect the AC-Input Power Supply Unit, page 3-4
IN
PO
W
ER
B
O
K
IN
PO
W
ER
A
O
K
BYP
ASS 1
210422
21
3-3
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 3 Connect the Power Supply Units
Connecting the Power
Connect the DC-Input Power Supply Unit
Figure 3-3 Connecting the DC Power
Before completing any of the following steps, and to prevent short-circuit or shock hazards, ensure that
power is removed from the DC circuit. To ensure that all power to the power supply unit is OFF, locate
the circuit breaker on the panel board that services the DC circuit, switch the circuit breaker to the OFF
position, and tape the switch handle of the circuit breaker in the OFF position.
Wiring should be done by a professional in accordance with state and local electrical codes.
Step 1 Ensure that the DC power line input leads are disconnected from the power source.
Step 2 Using the number 2 Phillips screwdriver, remove the protective plate from the terminal block.
Step 3 Insert one receptacle screw into the hex or loop connector on one power line input, insert the screw with
the connector into the corresponding lead receptacle and tighten the receptacle screw using the number
2 Phillips. Repeat for the remaining power line input lead.
Note The color coding of the DC-input power supply leads depends on the color coding of the DC power
source at your site. Make certain the lead color coding you choose for the DC-input power supply
matches lead color coding used at the DC power source.
Note Use 12 AWG (2.5 mm) copper wire only with hex or loop connectors. Ring terminals must be UL
approved and suitable for 12 AWG wire.
Step 4 Using the number 2 Phillips screwdriver, securely fasten the protective plate to the terminal block.
Step 5 Connect the DC power line input leads to the DC power source through a fast 10A circuit breaker.
Step 6 Turn the on/off switch to the on position.
IN POW
ER
BOK
IN
PO
W
ER
A
O
K
BYP
ASS 1
210424
3-4
Cisco Service Control Engine 1000 2xGBE Quick Start Guide
OL-7822-06
Chapter 3 Connect the Power Supply Units
Connecting the Power
Step 7 Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front
panel. If the DC-input power supply unit is operating properly, these LEDs will be glowing green.
Step 8 Ensure that the power supply is properly aligned and the installation screw is tightened.
Connect the AC-Input Power Supply Unit
Step 1 Plug the AC-input power cable into the AC-input power receptacle on the AC-input power supply
For AC-input power, we recommend powering the SCE 2000 platform from a 120 VAC, 15A receptacle
U.S. (240 VAC, 10A international) at the power source.
Figure 3-4 Connecting the AC Power
Step 2
Plug the AC power supply cable into the AC power source.
Step 3 Turn the on/off switch to the on position.
Step 4 Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front
panel. If the AC-input power supply unit is operating properly, these LEDs will be glowing green.
Step 5 Ensure that the power supply is properly aligned and the installation screw is tightened.
IN PO
W
ER B O
K
IN
PO
W
ER A OK
BYPASS 1
210423
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64

Cisco Systems OL-7822-06 User manual

Category
Gateways/controllers
Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI