TANDBERG T3 offers a highly immersive total Telepresence solution designed in great detail to create an experience where meeting participants from around the globe have the sensation that they are sitting across the table engaging in a face to face conversation. The orchestration of the room environment is a critical element of creating the “illusion of being there” that is at the heart of the Telepresence experience.

TANDBERG T3 offers a highly immersive total Telepresence solution designed in great detail to create an experience where meeting participants from around the globe have the sensation that they are sitting across the table engaging in a face to face conversation. The orchestration of the room environment is a critical element of creating the “illusion of being there” that is at the heart of the Telepresence experience.

PA GE 1 /2 2
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3 RO OM INSTALLATI O N G U I DE
TANDBERG WORLD HEADQUARTERS
Philip Pedersens vei 20
1366 Lysaker, Norway
Tel: +47 67 125 125
Fax: +47 67 125 234
Video: +47 67 126 126
1212 Avenue of the Americas
24th Floor
New York, NY U.S.A. 10036
Tel: +1 212 692 6500
Fax: +1 212 692 6501
Video: +1 212 692 6535
www.tandberg.com
TANDBERG T3 Telepresence provides a highly immersive total Telepresence solution
designed in great detail to create an experience where meeting participants from
around the globe have the sensation that they are sitting across the table engaging
in a face to face conversation.
The orchestration of the room environment is a critical element of creating the
“illusion of being there” that is at the heart of the Telepresence experience.
TANDBERG’s immersive room package creates a total Telepresence environment
with specialized lighting, acoustics, and furnishings delivering a warm and inviting
atmosphere with superior visual and audio quality.
The following pertains to the architectural specifications required for the
implementation of Immersive and non-Immersive Telepresence T3 rooms.
These specifications are to be used as a guide for the design and implementation
of a Telepresence T3 room. Failure to follow the guidelines below will produce a
less than optimal Telepresence experience.
It should be noted that for the majority of T3 installations with the proper room
dimensions, only certain room modifications need to be made. TANDBERG and its
partners will work closely with the customer to accommodate any special requests
or modifications.
We strongly recommend that you follow the sequence outlined in this document.
CONTE N T S
Room installation guide ..........................................................................................1
Planning and initial steps ........................................................................................2
Wall lattice construction .........................................................................................5
The baseboard ......................................................................................................14
The blue Walls ......................................................................................................15
The LED lines .......................................................................................................18
Main lighting .........................................................................................................19
Light mounting details ..........................................................................................20
This document is confidential and remains proprietary
to TANDBERG Telecom AS (“TANDBERG”).
Without TANDBERG’s prior written approval, this
document, either in whole or in part, may not be
reproduced in any form or by any means, disclosed
to others outside the Client’s organisation or used for
any purpose whatsoever other than for evaluatory
purposes by the Client.
All information, descriptions, examples and
calculations contained in this document are for
guidance purposes only and should not be treated as
definitive.
Although all reasonable care has been taken to ensure
that the information contained in the presentation is
accurate and not misleading, TANDBERG shall not be
liable for any loss resulting from reliance placed on the
information contained in this document.
PA GE 2 /2 2
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
RO OM INSTALLATI O N G U I DE
PLAN N I N G A N D INITI A L S T E P S
We strongly recommend that you start your planning with a meeting. Make sure
you include all the people needed:
• Project manager and assistant(s)
• Carpenters, painters, electricians, mechanical engineer
• HVAC (heating, ventilation, air conditioning) specialists
• IT personnel
• Architect
It is of vital importance that all parties agree on who is going to do what and when,
before you start the installing the system.
CHECKLIST BEFORE TANDBERG INSTALLATION
ROOM SIZE
Room Dimensions
without second row
Room Dimensions
with second row
depth width depth width height
Minimum
410 cm
14’ 5
1
2
675 cm
22’ 2”
438 cm
14’ 4
1
2
675 cm
22’ 2”
211 cm
6’11”
Optimal /
Maximum
466 cm
15’ 3
1
2
720 cm
23’ 7”
508 cm
16’ 8”
720 cm
23’ 7”
245 cm
8’
width
depth
height
DOOR OPENING AND PLACEMENT
Tip! More on room size can be found in the
document TANDBERG Telepresence T3
Room Requirements.
Right: Defining the terms depth, width
and height. Note that room dimensions
refer to an empty room before T3 specific
walls and ceiling have been mounted.
Included in the TANDBERG Immersive
Room Package:
•Glass wall accessories T3
•Glass walls T3
•LED lights T3
•Walnut wall panels T3
•Walnut wall panel corners T3
•Walnut wall panel profiles T3
•Main lighting T3
Not included in the TANDBERG
Immersive Room Package:
•Wall lattice construction materials
•Entrance door
•Rockwool or similar insulation material
Special tools required:
•Saw for gypsum with integrated dust
extration
Suggested Workflow
Preparing your room:
• Electricity 2 days
• HVAC 3 days
• Walls w / wooden structure 1 week
• Ceiling 1 day
TANDBERG Immersive Room:
• Glass panels 1 day
• Wood panels 2–3 days
• Carpet 1 day
• Lighting 2 days
PA GE 3 /2 2
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
RO OM INSTALLATI O N G U I DE
PLAN N I N G A N D INITI A L S T E P S
The door is not a part of the TANDBERG Immersive Room package. The door
opening should fit a 100 cm door. The door should open outwards.
Light opening for door: 100 cm × 208 cm
102 cm
102 cm
100 cm
208 cm
Door should be painted black.
The door should be mounted
flush on the outside.
40
1
4 39
1
2
82”
PA GE 4 /2 2
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
WALL FINISH
• All 4 walls should be painted white.
• The finish should be flat and without holes, but need not be totally perfect.
• Make sure there are no cables visible behind the blue wall.
• No holes must be made higher up and no wall outlets must be mounted
higher up than 10 cm (4”) above the floor.
RO OM INSTALLATI O N G U I DE
PLAN N I N G A N D INITI A L S T E P S
You may want to consult the document
Room Requirements for the requirements
on:
Heating, ventilation and air-conditioning
Electrical Outputs
LAN Outputs
Ceiling
The blue wall
WHITE
WHITE
WHITE
WHITE
PA GE 5 /2 2
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
RO OM INSTALLATI O N G U I DE
WAL L L ATTICE C O N S T RUCTIO N
Note! These items are not included. Suitable material should be sourced locally.
Observe the following:
• The vertical studs must not go all the way up to the ceiling. They must stop
at the highest horizontal cross member.
• The light opening for the blue glass, centered on the two long walls, is
593.5 cm × 208.5 cm / 19’5
21
32× 6’10
3
32.
Note that these dimensions are critical dimensions needed for perfect fitting
of the glass panels!
• The upper cross members must not let light through, i.e. there must be no
gap between the white walls and the inner surface of the cross members
(where the walnut panels shall be attached).
Note that failure to do so will cause visible stripes of light on the white walls
above the glass panels.
• The distance from the front of the wall panels/glass wall, to the inner wall
must be:
14 cm (5
1
2”) in the front and rear
8.5 cm (3
1
4”) in the sides
These distances are due to the need for sufficient space for the LED
lights behind the blue glass walls and for sufficient space for the acoustic
perforated panels on the side walls.
Build a lattice structure as shown above and on the following pages and put
Rockwool in the areas marked with red. This is where the acoustic perforated
panels are to be mounted.
Before the panels can be mounted, you
need to set up the wall lattice construction.
Note that the materials for this and
Rockwool (or similar) insulation material
must be sourced locally.
PA GE 6 /2 2
TANDBERG
Telepresence T3
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
PA GE 7 /2 2
TANDBERG
Telepresence T3
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
RO OM INSTALLATI O N G U I DE
WAL L L ATTICE C O N S T RUCTI O N
Tip! Some rooms have floors that are not
entirely level. This means that the height to
the ceiling may vary about the room.
When taking measurements of the room
always use the lowermost point of the floor
as your reference plane.
This may force you to cut the baseboard
somewhat in some places, but the result
will look far better than if the baseboard fails
to go all the way down to the floor.
2360
92
7
8
"
955
37
5
8
"
625
24
5
8
"
945
37
1
4
"
300
11
3
4
"
1900
74
3
4
"
2025
79
3
4
"
300
11
3
4
"
Gap between the
vertical lattices
300 - approx. 600mm
Area for insulation boards
977
38
1
2
"
625
24
5
8
"
2311
91"
945
37
1
4
"
300
11
3
4
"
300
11
3
4
"
1000
39
3
8
"
1026,5
40
3
8
"
Area for insulation boards
Distance of the first
lattice from corner lattice - 300 (11,8)
PA GE 6 /2 2
TANDBERG
Telepresence T3
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
PA GE 7 /2 2
TANDBERG
Telepresence T3
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
2360
92
7
8
"
955
37
5
8
"
625
24
5
8
"
945
37
1
4
"
300
11
3
4
"
1900
74
3
4
"
2025
79
3
4
"
300
11
3
4
"
Gap between the
vertical lattices
300 - approx. 600mm
Area for insulation boards
977
38
1
2
"
625
24
5
8
"
2311
91"
945
37
1
4
"
300
11
3
4
"
300
11
3
4
"
1000
39
3
8
"
1026,5
40
3
8
"
Area for insulation boards
Distance of the first
lattice from corner lattice - 300 (11,8)
PA GE 8 /2 2
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
Note! The carpet is supplied in a single roll and must be cut to measure. Roll width
is 2 m (6’6
3
4”). Roll out and cut the carpet as indicated below. Cut as many lengths
as required. Make sure glue is applied to the entire floor surface.
RO OM INSTALLATI O N G U I DE
CA R P E T
2 m (6’6
3
4”)
Roll out the carpet in this direction
PA GE 9 /2 2
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
Note! These items are included in the Immersive Room Package.
What to unpack: Unpack the three boxes marked
• Walnut wall panels T3
• Walnut wall panel corners T3
• Walnut wall panel Profiles T3
Box contents:
• The box marked Walnut wall panels T3 contains aluminum baseboards
(not shown), in addition to the items shown to the upper left.
• The box marked Walnut wall panels corners T3 contains corner base-
boards (not shown), in addition shown to the lower left.
• The box marked Walnut wall panels Profiles T3 contains border lists, in
addition to the following five kinds of profiles:
Note! It is of utmost importance that you mount the corners first.
Do as follows:
1. Start at the bottom and build your way up.
2. Fasten the profile E vertically on the lattice next to the glass walls (it will be
the border between the wooden panels and the glass walls).
3. Continue by cutting the profile B in appropriate lengths (from the edge of
the corner profile to the radius).
RO OM INSTALLATI O N G U I DE
ThE WOODEN PAN E L S
These elements are located in the box
marked Walnut wall panels T3.
These elements are located in the box
marked Walnut wall panel corners T3.
24×
16×
16×
PA GE 1 0/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
4. Insert and bend profile C in the slotted curve.
RO OM INSTALLATI O N G U I DE
ThE WOODEN PAN E L S
PA GE 1 1/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
5. Place the wooden panel in correct level and perpendicular position.
RO OM INSTALLATI O N G U I DE
ThE WOODEN PAN E L S
PA GE 1 2/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
6. The profiles shall fit as shown to the left.
Should you need to adjust the length of any of the panels, it is important to
use the right tools.
Note! Be sure to cut the panels with the backside up, in order to minimize
the risk of damaging the front of the panels. Observe how dimensions are
presented (page 6 of this document)
7. The profile D is to be used at the top of the topmost panel. Fasten with
screws to the top lattice.
The top panel with profile D as seen from the back is shown to the left.
8. Insert black aluminum trim pieces vertically between adjacent panels.
These are not precut and must be cut to fit from aluminum stock.
RO OM INSTALLATI O N G U I DE
ThE WOODEN PAN E L S
How the profiles should fit.
The top panel with profile D as seen from
the back
Back of Wood Panel upwards
Saw for Gypsum
with guide rail
Integrated dust extraction
Aluminum Profile
Saw for Gypsum
with guide rail
Integrated dust extraction
PA GE 1 3/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
9. The red areas in the illustration represent the perforated acoustic panels.
The panels situated above the glass walls are to be mounted with the Profile
D, both at the top and bottom of the panel.
RO OM INSTALLATI O N G U I DE
ThE WOODEN PAN E L S
PA GE 1 4/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
• Mount the aluminum baseboards to the lowest profile B around the whole
room. The front of the baseboards shall be aligned with the front of the
panels.
RO OM INSTALLATI O N G U I DE
ThE B A S E B OA R D
PA GE 1 5/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
RO OM INSTALLATI O N G U I DE
ThE B L U E WAL L S
Note! These items are included in the Immersive Room Package.
What to unpack: Unpack the two boxes marked
• Glass wall Accessories T3
• Glass walls T3
Box contents:
• The box marked Glass wall Accessories T3 contains the following items:
• The box marked Glass walls T3 contains the following items:
8 glass panels, each consisting of 9 mm (
5
16) glass, with the dimensions of
1964 mm × 1480 mm and with a weight of 65 kg or 142 lbs. per panel.
The glass walls are to be mounted with aluminum profiles, fastened with brackets,
joint brackets and adjusting screws and nuts. Brackets are fastened with M5 screws.
Do as follows:
1. Mount the upper profiles to the lattice.
Tip: Wear gloves at all times when handling
the glass plates.
Caution! The glass panels should be
handled by authorized personnel only.
Caution! Glass plates should always be
stored in upright position.
Caution! The weight of the entire glass
plate should never rest on just one corner.
There are two blue walls altogether, one
behind the participants and one behind the
screens.
The blue wall behind
the participants
The blue wall
behind the screens
16×
16×
16×
PA GE 1 6/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
Tip: Wear gloves at all times when handling
the glass plates.
Caution! The glass panels should be
handled by authorized personnel only.
Caution! Glass plates should always be
stored in upright position.
Caution! The weight of the entire glass
plate should never rest on just one corner.
2. Adjust so that the glass profile is flush with the vertical black side profile
(the one closest to the panels). Mount the angle bracket onto the lower
glass profile (drill a hole for the M5 screw in the glass profile). This should
fix the distance between the wall and the glass profile.
3. Measure the distance between the upper and the lower profiles. Adjust the
distance between the profiles to 1972 mm by adjusting the feet.
4. Use screws to attach the angle brackets to the wall. The glass profiles
should now be fixed.
5. Repeat 2–4 and mount the joint brackets until all are mounted.
RO OM INSTALLATI O N G U I DE
ThE B L U E WAL L S
Note! It is paramount that the distance
between the profiles is 7–8 mm (¼”)more
than the glass panel length (height when
mounted). Otherwise you will not be able
to mount the panels.
Tip! You may want to mount the LED
lights before you mount the glass panels.
Although strictly not needed to do so, you
may find it convenient. LED mounting is
described after this section.
PA GE 1 7/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
RO OM INSTALLATI O N G U I DE
ThE B L U E WAL L S
6. Carefully unpack the glass walls. Wipe the glass clean if needed. Wear
gloves at all times to avoid leaving marks on the panels. Glass plates must
be stored in an upright position.
IMPORTANT! The weight of the glass plate should never rest on just one
corner.
Note! The glass plates should be mounted with the matte side inwards (into
the room).
7. Use the enclosed tape and mount it along the top and bottom edges of
the glass panel. There may be tape visible along the bottom edge after the
mounting. Careful alignment of the tape along the bottom edge will mini-
mize this. You may also use a sharp knife and carefully cut and remove the
excess tape after the panels have been mounted.
8. Mount two rubber bumpers on what will be the right edge (when mounted)
of the left glass panel. Take care to position these so that they will become
covered by the profiles holding the panel in position. The rubber bumpers
serve to prevent the glass panels from touching each other.
Placing the glass walls requires a minimum of two persons. Place the glass
walls in the profiles by lifting the glass so that the top of the glass touches
the surface of the top profile. Then slowly sink the glass into the groove of
the bottom profile.
9. Repeat the rubber bumper mounting for the center panel. Put the second
glass in place as close to the first panel as possible.
Tip: Wear gloves at all times when handling
the glass plates.
Caution! The glass panels should be
handled by authorized personnel only.
Caution! Glass plates should always be
stored in upright position.
Caution! The weight of the entire glass
plate should never rest on just one corner.
PA GE 1 8/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
Note! These items are included in the Immersive Room Package.
Note! Lamps must be installed by qualified personnel only. Local regulations and
requirements may apply.
What to unpack: Unpack the box marked
• LED lights T3.
Box contents:
• This box contains the 10 × Phillips BCS722 LED light modules.
US version:
10 × eW Grace Powercore
2 × Leader Cable
8 × Jumper Cable
Kindly observe the following:
• Installation of Phillips LED lighting can begin as soon as the installation of
the blue backlighting walls is complete.
• Each blue wall contains 5 LED lights placed end to end on the floor
• 5 LED lights should be connected in series behind each blue wall.
• LED light coupling: 2 double and 1 single.
Place Center LED light on top of brackets
for glass fixture. This applies to the blue wall
behind the system only.
RO OM INSTALLATI O N G U I DE
ThE L E D L I N E S
140
5
1
2
"
140
5
1
2
"
4600
181
1
8
"
85
3
3
8
"
85
3
3
8
"
111
4
3
8
"
1695
66
3
4
"
885
34
7
8
"
400
15
3
4
"
885
34
7
8
"
1885
74
1
4
"
2160
85"
570
22
1
2
"
760
29
7
8
"
829
32
5
8
"
87,5
3
3
8
"
Centerline
4 single power outlets
5 single power outlets
Hardwire outlet - Light
Lan outlet
110V/30A, 220V/16A
110V/30A, 220V/16A
110V/30A, 220V/16A
On Floor Cable Routing
- Transport cables from T3
Power / AV / Lan
Video Lan
Customers Lan
Master Panel
Light
Control Data
Panel
Doc Cam Outlet
Doc Cam Capture Area
Max. size 760 x 570
Min. size 50 x 45
On floor Cable Routing
- Transport cables from T3
Unit: mm/"
Scale:
Sheet Size:
Drw No.
:
TANDBERG
T3 Electrical System
04.11.08
01
119083
www.tandberg.com
Doc Cam location in
suspended ceiling
110V/30A, 220V/16A
Ceiling hardwire outlet - Light
Fuse - Power outlets: A,B,C,D
Doc Cam, Ceiling lights and LED module : Fuse D
17.11.08
02
All Hardwire outlets : Fuse D
4
01.12.08
03
A A A B C
A A B C
Hardwire outlet for light,
mounted sideways
on wood lattice.
Hardwire outlet for light,
mounted sideways
on wood lattice.
LED 5LED 4LED 3LED 2LED 1
3 x junction box
Leader Cable
LED organisation Europe (Junction box and extra cables supplied by local electrician)
)5
4
Leader Cable
Doc. Title:
Sign.:
Date:
Revision:
Related Tandberg Product -
TANDBERG T3
1:25
A3
Fire Emergency switch
(Controls fuse groups A,B and C)
5
140
5
1
2
"
140
5
1
2
"
4600
181
1
8
"
85
3
3
8
"
85
3
3
8
"
111
4
3
8
"
1695
66
3
4
"
885
34
7
8
"
400
15
3
4
"
885
34
7
8
"
1885
74
1
4
"
2160
85"
570
22
1
2
"
760
29
7
8
"
829
32
5
8
"
87,5
3
3
8
"
Centerline
Single power outlet
8 single power outlets
Hardwire outlet - Light
Lan outlet
110V/30A, 220V/16A
110V/30A, 220V/16A
110V/30A, 220V/16A
On Floor Cable Routing
- Transport cables from T3
Power / AV / Lan
Video Lan
Customers Lan
Master Panel
Light
Control Data Panel
Doc Cam Outlet
Doc Cam Capture Area
Max. size 760 x 570
Min. size 50 x 45
On floor Cable Routing
- Transport cables from T3
Unit: mm/"
Scale:
Sheet Size:
Drw No.
:
TANDBERG
T3 Electrical System
US
04.11.08
01
119083 - US
www.tandberg.com
Doc Cam location in
suspended ceiling
110V/30A, 220V/16A
Ceiling hardwire outlet - Light
Fuse - Power outlets: A,B,C,D
Doc Cam, Ceiling lights and LED module : Fuse D
17.11.08
02
All Hardwire outlets : Fuse D
8
01.12.08
03
A A A A A A B C
A A A A A A B C
Hardwire outlet for light,
mounted sideways
on wood lattice.
Hardwire outlet for light,
mounted sideways
on wood lattice.
LED 5LED 4LED 3LED 2LED 1
4 x jumper Cable
Leader Cable
LED organisation USA (Jumper cables and leader cable supplied by Tandberg
8
Doc. Title:
Sign.:
Date:
Revision:
Related Tandberg Product -
TANDBERG T3
1:25
A3
Fire Emergency switch
(Controls fuse groups A,B and C)
8
LED mounted on bracket
Hardwire outlet for LED light
Power / Lan Outlet
PA GE 1 9/ 22
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
TANDBERG
Telepresence T3
Note! These items are included in the Immersive Room Package.
What to unpack: Unpack the box marked
• Main Lighting T3
Box contents:
• The box contains 6 Fluorescent lightbulbs
US: 21W 830
EU: 39W 830
11 35W Halogen lightbulbs.
The rear ceiling lighting consists of seven 640 mm spot light armatures mechanically
fastened together and parallel wired together. (Rear edge 5 cm / 2” inner rear wall and
228 cm / 7’ 5
3
4” from the floor. )
The front ceiling lighting consists of four 450 mm spot light armatures plus three fluorescent
light armatures mechanically fastened together and parallel wired together. (Rear edge
200 cm / 6’6
7
10 from inner rear wall and bottom edge 228 cm / 75
3
4from theoor).
Ceiling attachment by means of hang wires provided with lighting. Anchor method in
ceiling will depend on ceiling structure and composition.
RO OM INSTALLATI O N G U I DE
MAIN L I G h T I NG
PA GE 2 0/ 22
TANDBERG
Telepresence T3
119077.01 TELEPRESENCE T3 ROOM INSTALLATION GUIDE 12.08
Thread hang wires through push fasteners. Trim off excess wire to approximately 8cm / 3”
Use the provided 4mm bolts ad plastic nuts to fasten
the seven lights together in one continuous row.
Press in the chrome colored end plates to cap off each
row of lights.
Unscrew the light bezel. Insert light bulb. Reinstall light bezel.
RO OM INSTALLATI O N G U I D E
LIGhT M O U N T ING DETAILS
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22

TANDBERG T3 User manual

Type
User manual
This manual is also suitable for

TANDBERG T3 offers a highly immersive total Telepresence solution designed in great detail to create an experience where meeting participants from around the globe have the sensation that they are sitting across the table engaging in a face to face conversation. The orchestration of the room environment is a critical element of creating the “illusion of being there” that is at the heart of the Telepresence experience.