Rheodyne 7125 Operating instructions

Type
Operating instructions
Operating Instructions for
Model 7125 Syringe Loading
Sample Injector
mobile phase coming out of the needle port
when the valve is turned from INJECT to
LOAD.
Example: 1-mL loop expands 20 uL
upon decompression from 200 bar.
4.2 Warning: When using the Needle Port
Cleaner, empty the syringe slowly to prevent
solvent from squirting back.
4.3 Caution: Use the correct size syringe
needle to prevent damage to the valve.
4.4 Caution: Rinse the valve after using
buffer solutions to prevent crystals from
forming, which can scratch the rotor seal.
5.0 USING PROPER SYRINGES
Use syringes with 0.028-inch O.D. (22
gauge) x 2-inch long needle, without electro
taper, and 90
°
point style. Using the incorrect
needle size will damage the injector.
6.0 INSTALLATION
a) To mount the valve on a panel, remove
the handle by loosening the two handle set
screws. Use the two screws supplied to fasten
the valve to a panel.
b) Replace the handle by tightening the
two set screws on the two flats of the shaft.
c) Connect the two vent tubes (supplied) to
ports 5 and 6. Place the outlet ends of both at
the same horizontal level as that of the needle
port to avoid siphoning. See Fig. 2.
1.0 DESCRIPTION
Model 7125 is a seven-port sample
injection valve in which the sample is loaded
through a built-in needle port in the front of
the valve.
Fig. 1 shows the flow diagram of the
valve. The six small circles represent the
ports in the valve stator. The two heavy arcs
represent the connecting passages in the
rotor seal. The larger circle represents the
needle port.
The sample loop is loaded in through the
needle port in the LOAD position. Rotation of
the knob, 60°, switches the valve from LOAD
to INJECT. In the INJECT position the
mobile phase flows through the loop.
2.0 SUPPLIED WITH THE VALVE
Supplied with the valve in a separate bag
are fitting sets for tubing connections and the
items shown below. A 20-uL sample loop is
standard with the valve.
Remove the supplied 22 gauge needle from
the needle port before using the valve.
3.0 SPECIFICATIONS
•Maximum temperature is 80°C.
•Valve is set to hold 345 bar (5000 psi). It can
be adjusted to hold up to 483 bar (7000 psi).
•The wetted surfaces are stainless steel,
alumina ceramic, and an inert polymer.
4.0 IMPORTANT SAFETY NOTICES
4.1 Warning: When using sample loops
larger than 100 uL, shield yourself from
d) Connect the pump to port 2 and the
column to port 3. Leave the column discon-
nected from the valve during initial flushing.
7.0 FLUSHING THE INJECTOR
In the INJECT position, flush the needle
port with about 1 mL of mobile phase, using
the needle port cleaner as shown in Fig. 3. At
this time, the pump flushes the loop.
8.0 COMPLETE LOOP LOADING
In complete filling, the volume of sample
injected is set by the volume of the loop (this
includes the valve passages). This method
produces the highest precision.
Overfill the loop with at least two to three
loop volumes of sample. Five to ten loop
volumes will provide even better precision.
An excess of sample is needed because mo-
bile phase near the wall of the loop is dis-
placed slowly, due to the laminar flow pattern
shown in Fig. 4.
To completely fill the loop:
a) See Warning 4.1 and turn to LOAD.
b) Put the syringe into the needle port. You
will feel tightness during the last 2-3 mm of
travel, as the needle passes through the needle
seal and then stops against the stator face.
c) Load the sample.
d) Leave syringe in and turn to INJECT.
LOAD INJECT
9/64 Hex Key
5/64 Hex Key
Needle Port Cleaner
Mounting Screws (2)
Vent Tubes (2)
Figure 1: 7125 Flow Diagram
Correct level
of vent
line ends Height of
needle port
Figure 2: Correct Position of Vent Lines 9.0 PARTIAL LOOP FILLING
If you only have small quantities of sample,
this is the method of choice. In the partial
filling method the volume of sample injected
is set by the syringe. In this method, no more
than half a loop volume of sample is loaded
into the loop. For example, load no more than
10 uL into a 20 uL loop. With larger volumes
some of the sample is lost out vent tube 6. This
is due to the laminar flow effect shown in
Fig. 4: sample flows down the center of the
loop at twice the average speed.
To partially load the loop:
a) In INJECT, use the Needle Port Cleaner
to flush out the needle port with about 1 mL of
mobile phase. This will flush out contamina-
Flow Tube Wall
Mobile PhaseSample
Figure 4: Laminar Flow Effect
Knob of Valve
Figure 3: Use of the Needle Port Cleaner
Needle Guide
CAUTION: To avoid liquid squirting back
at you, discharge syringe slowly.
Needle Port Cleaner
Syringe Barrel
PO BOX 1909, ROHNERT PARK, CA 94927-1909, U.S.A. • PHONE 707-588-2000 • FAX 707-588-2020
tion from the earlier injection. This liquid will
exit out vent tube 5.
b) Follow steps a-d in Section 8.0.
10.0 ADJUSTING FOR HIGHER PRES-
SURE OPERATION/LEAKAGE
The valve has been factory-set to hold 345
bar. If you need operation to a higher pressure
or if there is a leak between stator and stator
ring proceed as follows.
With the system pressurized, back the three
set screws part-way out of the stator. Tighten
each of the three stator screws 1/8 of a turn,
continue to do so until the leak stops and the
valve is holding the pressure you want.
Confirm that the gap between the stator and
stator ring is equal around the valve. After the
leak has stopped tighten the set screws until
they touch the stator ring. Replace the rotor
seal if the leak continues.
NOTE: If the vent tubes from ports 5 and
6 do not have their outlet ends at the same
horizontal level as the needle port, siphoning
can result, which is often misinterpreted as
a leak.
11.0 MAINTENANCE
With normal use the valve will give many
thousands of injections without trouble. The
rotor seal wears with use and is the only part
that needs routine replacement. The main
causes of early failure are:
a) the wrong needle tip can chip the
ceramic stator face which then causes deep
scratching of the rotor seal surface or,
b) abrasive particles in the sample can
scratch the rotor seal surface.
11.1 CHANGING THE ROTOR SEAL
To change the rotor seal (P/N 7125-047)
refer to Fig. 5 and proceed as follows:
a) Remove the three stator screws.
b) Remove the stator, stator face assembly
and stator ring from the body.
c) Pull the rotor seal off the pins.
d) Leave isolation seal and bearing ring in
place. See Section 12.2 for reassembly.
11.2 REASSEMBLY
To reassemble the valve proceed as
follows and refer to Fig. 5:
a) Line up rotor seal as shown in Fig. 6.
The rotor seal slots face the stator.
b) Replace the stator ring so that the two
stop pins enter the mating holes in the body.
The rotor pin must be between the two stop
pins.
c) Put the stator face assembly on the
stator. Line up the small notch in the rim of the
assembly with port 1 of the stator.
d) Mount the stator and stator face
assembly on the valve by pushing it onto the
two pins on the stator ring.
f) Put the three stator screws in place.
Tighten each an equal amount until the screws
are tight. The three set screws will keep the
space even between the stator and stator ring.
11.3 SPARE PARTS
7125-047 Vespel Rotor Seal (standard)
7125-079 Tefzel Rotor Seal (high pH)
12.0 OPERATING SUGGESTIONS AND
TROUBLESHOOTING
12.1 LEAKAGE
If you see liquid between the stator and
stator ring, tighten the pressure adjusting screw
as explained in Section 11.0. Replace the
rotor seal if the leak continues.
12.2 NEEDLE SEAL LEAKAGE
Since the outside diameter of syringe
needles can be different from syringe
tosyringe, the needle seal (Teflon sleeve in the
rotor seal) may not seal correctly around a
needle which is smaller than average. This
will result in a loss of accuracy in loading
the sample.
12.3 USE OF AQUEOUS BUFFERS OR
SALT SOLUTIONS
To prevent the formation of salt crystals in
the valve, flush out the flow passages and the
injection port with water after using salt
solutions.
12.4 USE OF HIGH pH SOLUTIONS
The standard rotor seal is Vespel, a
polyimide with good wear resistance. It
is sensitive to alkaline attack, so avoid
solutions having a pH of 10 or more. Use the
Tefzel rotor seal for alkaline solutions (see
Section 11.3).
12.5 ACCURACY OF SAMPLE LOOPS
Sample loop sizes are not actual values. The
actual volume can differ by up to 10% for a
20-uL loop. There is a greater difference for
smaller loops. Use partial filling if you must
know the actual volume injected.
13.0 WARRANTY
All Rheodyne valves are warranted
against defects in materials and workman-
ship for a period of one year following date
of shipment by Rheodyne. Rheodyne will
repair or replace any Rheodyne product
that fails to conform to the foregoing war-
ranty, at no charge to the customer, provided
that the valve is returned to Rheodyne's
factory, transportation prepaid. The forego-
ing is Rheodyne's sole warranty of its prod-
ucts, and all other warranties, express or
implied, including any implied warranties
of merchantability or fitness for any particu-
lar purpose are hereby disclaimed. Under no
circumstances will Rheodyne be liable for
any consequential or incidental damages
attributable to any Rheodyne valves, even if
Rheodyne has been placed on notice of the
possibility of such damages.
14.0 RETURN OF VALVES
Products may not be returned which are
radioactive or contaminated by infectious
agents, or other materials that may constitute
health hazards to Rheodyne employees.
Figure 5: Model 7125 Exploded View
Notch
Stop Pins
Figure 6: Rotor Seal Orientation (view from stator)
Handle Assembly
Thrust Bearing
Body
Set Screws (3)
Stator Ring
Stop Pins (2)
Rotor Seal
Isolation Seal
(spring loaded)
Bearing Ring
Needle Port Tube
Assembly
Spring Washers (4)
Needle Seal
Stator
Stator Face Assembly
Stator Screws (3)
Rotor Pin
Seal Pins (4)
Needle Guide
  • Page 1 1
  • Page 2 2

Rheodyne 7125 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI