PENDANT MOUNT KIT
INSTALLATION GUIDE
IMPORTANT SAFETY INSTRUCTONS
Please read carefully and follow all safety instructions before attempting to assemble, operate or install the product.
• WARNING - Risk of fi re or electric shock. Disconnect and turn power o at fuse or circuit breaker before installing or
servicing the fi xture.
• WARNING - Risk of fi re or electric shock. Properly make all electrical and grounding connections in accordance with the
NEC and any applicable local code requirements.
• WARNING – Risk of fi re or electric shock. Pendant mount kit for the fi xture installation requires knowledge of luminaire
electrical system and the hazard involved. If not qualifi ed, do not attempt installation. Contact a qualifi ed electrician.
• WARNING – Do not install the pendant mount kit if the fi xture is damaged.
• WARNING – Do not disassemble or open the LED fi xture when installing the pendant mount kit.
• WARNING – Do not place or store items on top of fi xture.
• CAUTION – Risk of injury. Wear safety glasses and gloves when installing the pendant mount kit.
SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE.
Tools Required (not included):
• Drill
• Drill Bits
• Wire Cutter
• Phillips Screw Driver
INSTALLATION PACKAGE CONTENTS:
HARDWARE FOR PENDANT
HARDWARE FOR WIRING
NOTE: Before beginning, lay out all parts before installation. If any part(s) is missing or damaged, do not attempt to install
the product.
CABLE A
Ceiling cable with large hook (2)
CABLE B
Fixture cable with two small hooks
& metal insert (2)
• 1/4” Toggle bolt (2)
• 1/4” Eye bolt with toggle thread (2)
• 1/4” Eye bolt with lag thread (2)
• Washer (2)
• Wire Cord (1)
• Junction box cover plate (1)
• Junction box cover plate screw (1)
• Cover plate wire plug (1)
• Junction box bracket (1)
• Junction box bracket screws (2)
• Wire Nuts (6)
• 3/8” Wire Clamp (1)
If you have any questions, problems or missing parts, please contact customer
TWO YEAR LIMITED WARRANTY
• Level
• Work Gloves
• Ladder
WIRING INSTRUCTIONS GUIDE
WARNING - Risk of fi re or electric shock. Disconnect and turn power o at fuse or circuit breaker before installing or
servicing.
1. Unscrew and remove wiring cover plate on the back of the fi xture, and then remove the knockout located on the wiring
cover plate.
2. Connect and secure the Wire Clamp to wiring cover plate.
3. Route and feed the wire cord through the wire clamp. Tighten the screws on the wire clamp to
mechanically secure the wire cord.
4. Separate the wires from the wire cord and fi xture.
5. Using the wire nuts provided, connect the black wire of the wire cord to the black wire from the
fi xture. Connect the white wire of the wire cord to the white wire from the fi xture. Connect the
green wire of the wire cord to the green/yellow ground wire from the fi xture. Note: Fixture
ground wire should be secured and connected with the ground screw.
6. Insert the all electrical wiring connections into the wiring compartment of
the fi xture. Attach and secure the wiring cover plate with the screw back to the
fi xture.
Once wiring connection of the Wire Cord is completed, proceed to the
Pendant Mounting Instructions.
4. If using the toggle eye bolt, thread toggle onto eye bolt. Then push toggle through pre-drilled
hole. Skip this step, if using eye bolt with lag thread.
Note: Not required if using eye bolt with lag thread, toggle will not be used.
PENDANT MOUNTING INSTRUCTIONS GUIDE
WARNING - Risk of fi re or electric shock. Disconnect and turn power o at fuse or circuit breaker before installing or
servicing.
WARNING - It is recommended to use two people to install this pendant fi xture.
WARNING - Do not place or store items on top of fi xture.
1. Select the appropriate eye bolt (Toggle bolt for hollow dry wall or lag thread bolt for existing studs).
2. Once appropriate eye bolt is determined:
• For toggle eye bolt, pre-drill appropriate size hole in ceiling surface, where fi xture is to be located.
• For lag thread eye bolt, pre-drill appropriate size hole for easy securement to existing studs.
3. Thread eye bolts through washer.
5. Tighten and secure eye bolt to ceiling surface.
Note: if using toggle bolt, slightly pull on eye bolt to create enough tension to screw
eye bolt into ceiling.
CONTINUE TO BACK PAGE