Streamline X-3340-68FSWH-FM Installation guide

Type
Installation guide
INSTALLATION AND CARE GUIDE
Notice: Do not change or modify the product in any way. Doing so may compromise the
products structural integrity and will void the warranty.
Notice: Installation instruction must be followed. Any diversions from the installations may risk
property damage and will void the warranty.
Notice: When moving your tub be sure to lift, never slide or pull, doing so may result in damage
to the product or surrounding area.
Notice: If you are unfamiliar with tub installation please consult a professional.
Tools:
PREPARE FOR INSTALLATION:
1. Remove the tub from the packaging and place on a soft cloth.
(it is recommended to have two people for this step)
2. Level the tub by turning it over and rotating the feet underneath.
(it is recommended to have two people for this step)
page:01
3. Fill the tub to the overflow, and check for leaks.
4. Clean and prepare the floor where you will be installing the tub.
5. Place the tub in the exact position you will be installing it.
(it is recommended to have two people for this step)
6. Using a pencil, trace around the tub, marking the installation area.
INSTALLATION:
1. Determine the location of the drain pipe on
the floor by measuring of the drain and
waste location under the tub. (This will
vary on each tub)
2. Apply a bead of silicone or adhesive to the
bottom tub supports.
3. Apply a bead of tub and tile caulk around
the edge of the base.
4. Carefully set the tub into position and
connect the preinstalled drain to the waste
water pipe.
5. Filling the tub again check for any leaks in
waste connections below.
(access below the floor will be
necessary)
6. Wipe up any excess tub and tile caulk.
7. Apply a final bead of tub and tile caulk
around the bottom edge of the tub where it meets the floor and wipe away any excess.
8. For faucet installation consult the manufacuters instructions.
CARE GUIDE:
Care: Rinse thoroughly and use a soft cloth to wipe the product dry after each use
to prevent hard water stains.
Cleaning: Soft abrasive cleaners may be used when necessary.
page:02
INSTALLATION INSTRUCTION FOR
PRE-INSTALLED DRAIN
Drain on the tub is already pre-installed, Below instructions are provided in case it
needs to be re-installed.
Step 1 : Divide the whole drain into 3 parts as per photos below.
page:03
Step 2 :Put silicone sealant on the bottom of the drain hole as per photos
below.(draw a circle)
Step 3 : Put part 2 in the drain hole from top side as per photos below.
Step 4 :Put part 1 on part 2 as per photos below.
Please pay attention on the side as per photos below.
page:04
Step 5 :Put also part 3 on part 2 as per photos below.
Step 6 : One hand control the part 3,and the other hand use wrench to fasten the
inside of part 2 as per photos below.
Step 7 : Screw the pipe as per photos below.
page:05
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5

Streamline X-3340-68FSWH-FM Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI