1.1,
Product Content
1 x Rail
1
Level can make the
rail horizontal.
Place the rail against the wall, and use a pencil to
mark where the holes should be.
Make sure the height of holes on the wall is H+1/”.
Instructions
It is very important to determine whether you will be installing
a Header Board prior to installing the track.
Due to many overlapping factors such as the location of wall
studs (Our rail come with pre-drilled holes every 16” on center),
the weight of a barn door and the various types of trim used in
homes, we recommend using a Header Board in all situations.
Please install a 1” x 4” or 1” x 6” Header Board above the door
opening directly into studs.
Header Board must be solid wood and measure at least the full
length of the track or longer.
2
A
B
Concrete wall Installation.
Install the anchor to holes on the concrete wall first,
then install carriage bolt to anchor.
Drywall Installation.
Install the lag bolt to wood stud or head board directly.
Tools Needed
1,
2,
Pencil
Phillips Screwdriver
Drill
Wrench3,
4,
5,
9,
Plumb Bob
Level
6,
Tape7,
Drill Bit
8,
Drill Bit
3.1,
3.2,
3.3,
6 x Anchor
6 x Lag Bolt
6 x Wall Spacer
(For concrete wall)
(For wood stud)
H+1/”
* Header Board and Lag Bolts
for installing Header Board
are not included in kit.
TM
tandard
TM
tandard
TM
tandard
TM
tandard
TM
TM
tandard
TM
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
TM
S
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
TM
S
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
TM
S
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
TM
S
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
tandard
TM
S
S
mart
TM
S
tandard
TM
S
S
mart
tandard
TM
S
S
mart
TM
S
S
mart
TM
S
S
mart
TM
S
S
mart
TM
S
S
mart
TM
S
TM
S
S
mart
We provide 2 kinds of screws for you to install rail onto
concrete wall or drywall.
2.1,
8 x Long Door Screw
4 x Hanger
2.2,
4.1,
4.2,
4.3,
4.4,
4 x Rubber End
2 x Floor Guide
4 x Door Stopper
1 x Hex Key
Measurements
C
D
B
F
E
The gap between each pre-drilled hole is 16”.
Door height is H.
The height of holes on the wall is H+1/”.
Distance from the bottom of the door to the floor is ⁄”.
Distance from door top side to holes on the wall is 1/”.
Total Rail length is 96”.
A
96”
A
16” 16” 16” 16”
B
1/”
C
16”
E
H H+1/”
F
⁄”
D
1/”
3/”
Insert door stoppers into rail. Install door stoppers
between A-B C-D D-Eand F-G. Door stopper is used to
prevent the hangers coming out of the rail.
A B C D E F G
Do not screw it in
place at this stage
3
3