Asco 300 Series Power Panels Installation guide

Type
Installation guide

Asco 300 Series Power Panels are designed for exterior use and feature integrated disconnect breakers for safe and easy power management. They come in various configurations for input (generator) and output (load bank) applications, with options for ground and neutral connections, voltage ratings, and amperage. These panels provide quick and reliable connections for power distribution and are ideal for industrial and commercial settings requiring backup power or load testing.

Asco 300 Series Power Panels are designed for exterior use and feature integrated disconnect breakers for safe and easy power management. They come in various configurations for input (generator) and output (load bank) applications, with options for ground and neutral connections, voltage ratings, and amperage. These panels provide quick and reliable connections for power distribution and are ideal for industrial and commercial settings requiring backup power or load testing.

Public
SERIES 300
Quick Connect Input and Output Power Panels
with Integrated Disconnect Breaker
150 - 800 Amp Wall Mount
1000 - 4000 Amp Pad Mount
Installation Manual
381333-504
10/2021
Pad Mount Panel
2 381333-504
Public
Legal Information
The Schneider Electric brand and any trademarks of Schneider Electric SE and its
subsidiaries referred to in this guide are the property of Schneider Electric SE or its
subsidiaries. All other brands may be trademarks of their respective owners.
This guide and its content are protected under applicable copyright laws and
furnished for informational use only. No part of this guide may be reproduced or
transmitted in any form or by any means (electronic, mechanical, photocopying,
recording, or otherwise), for any purpose, without the prior written permission of
Schneider Electric.
Schneider Electric does not grant any right or license for commercial use of the
guide or its content, except for a non-exclusive and personal license to consult it on
an “as is” basis. Schneider Electric products and equipment should be installed,
operated, serviced, and maintained only by qualified personnel.
As standards, specifications, and designs change from time to time, information
contained in this guide may be subject to change without notice.
To the extent permitted by applicable law, no responsibility or liability is assumed by
Schneider Electric and its subsidiaries for any errors or omissions in the
informational content of this material or consequences arising out of or resulting
from the use of the information contained herein.
SERIES 300 Quick Connect Power Panel with Integrated Breakers Installation Manual
381333-504 3
Public
Table of Contents
Safety Precautions ............................................................................... 6
Catalog Number Identification ............................................................... 7
Installation .............................................................................................. 8
Supporting Foundation .......................................................................... 8
Mounting ................................................................................................ 8
Line Connections ................................................................................... 9
Testing Power Conductors .................................................................... 9
Connecting Power Conductors .............................................................. 9
Quick Connect Input Panel (Generator) ................................. 9
Phase Rotation Monitoring Wiring ......................................................... 9
Generator Start ..................................................................................... 9
Cam-Lok Cable Connections & Disconnection .................................. 10
Provisions for Kirk Lock ...................................................................... 11
Quick Connect Output Panel (Load Bank) ........................... 12
Load Dump .......................................................................................... 12
Cam-Lok Cable Connections & Disconnection .................................. 12
Provisions for Kirk Lock ...................................................................... 13
Testing & Service ............................................................................... 14
Transfer Test ....................................................................................... 14
Preventive Maintenance ...................................................................... 14
Annual Inspection Checklist ................................................................ 14
Index ...................................................................................................... 15
Installation Manual SERIES 300 Quick Connect Power Panel with Integrated Breakers
4 381333-504
Public
List of Figures
Figure 1: Phase Rotation Configurations ..................................... 9
Figure 2: Generator Start Terminal Block .................................... 9
Figure 3: Phase Rotation ABC ................................................... 10
Figure 4: Phase Rotation CBA ................................................... 11
Figure 5: Load Dump Terminal Block ......................................... 12
Installation Manual SERIES 300 Quick Connect Power Panel with Breaker
381333-504 5
Public
Safety Information
Important information
Please note
Read these instructions carefully and look at the equipment to become familiar with the device
before trying to install, operate, service, or maintain it. The following special messages may
appear throughout this manual or on the equipment to warn of potential hazards or to call
attention to information that clarifies or simplifies a procedure.
The addition of either symbol to a “Danger” or “Warning” safety label indicates that
an electrical hazard exists which will result in personal injury if the instructions are
not followed.
This is the safety alert symbol. It is used to alert you to potential personal injury
hazards. Obey all safety messages that accompany this symbol to avoid possible
injury or death.
DANGER indicates a hazardous situation which, if not avoided,
will result in death or serious injury
WARNING indicates a hazardous situation which, if not avoided,
could result in death or serious injury
CAUTION indicates a hazardous situation which, if not avoided,
could result in minor or moderate injury
NOTICE is used to address practice not related to physical injury. The safety
alert symbol shall not be used with the signal word
Electrical equipment should be installed, operated, serviced, and maintained only by
qualified personnel. No responsibility is assumed by ASCO POWER TECHNOLGIES
for any consequences arising out of the use of this material.
A qualified person is one who has skills and knowledge related to the construction,
installation, and operation of electrical equipment and has received safety training to
recognize and avoid the hazards involved.
Installation Manual SERIES 300 Quick Connect Power Panel with Integrated Breakers
6 381333-504
Public
Safety Precautions
Limited Warranty
Maintenance
Technical Support
This manual contains information critical to proper installation and operation of the
ASCO SERIES 300 Quick Connect Power Panels. Be certain to read and
understand all instructions prior to installation and operation.
NOTE: The ASCO SERIES 300 Quick Connect Input and Output Power Panels
contain a disconnect breaker which provides a disconnect between sources. Castell
or Kirk Key locks must be installed on generation connection door and disconnect
breaker which serves as an interlock between permanent generator and portable
generator.
ASCO SERIES 300 Quick Connect Power Panels are listed to UL891 Standards.
When this ASCO SERIES 300 Quick Connect Power Panel is installed and
operated, according to the manual instructions, ASCO Power Technologies will
repair or replace any of its mechanical or electrical parts if they are found to be
defective in material or workmanship within two years of the purchase date.
The ASCO SERIES 300 Quick Connect Power Panels require maintenance. ASCO
Power Technologies recommends annual inspections to keep the panel in safe
operating condition. ASCO Power Technologies recommends that the Pre-
Operation and Maintenance Checklist under Appendix A serve a basis for annual
inspection
ASCO Power Services. Inc. are available to assist in resolving issues by calling
1-800-800-2726 (ASCO) or by emailing customercare@ascopower.com for any
additional information, please refer to ascopower.com.
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
Apply appropriate personal protective equipment (PPE) and follow safe
electrical work practices. See NFPA70E, CSA Z462 or NOM-029-STPS.
This equipment must only be installed and serviced by qualified electrical
personnel.
Turn off all power supplying this equipment before working on or
inside equipment.
Always use a properly rated voltage sensing device to confirm power
is off.
Replace all devices, doors and covers before turning on power to
this equipment.
Failure to follow these instructions will result in death or serious injury.
Installation Manual SERIES 300 Quick Connect Power Panel with Breaker
381333-504 7
Public
Catalog Number Identification
A typical Catalog Number is shown below with its elements explained. The
example is for an Input (Generator) panel with a ground and neutral, 3 phase, 800A,
480V, integrated breaker, with accessories in a painted steel enclosure,
(3QCNCAA30800NBXM):
1Neutral is unnecessary and not provided for output panels.
280% Rated Breakers standard 150A to 2000A. 100% Rated Breakers Standard 2500A to 4000A
3QC NC N A 3 1600 N B X M
Series Connection Ground Neutral1 Poles Amperes Voltage Breaker2 Accessories Enclosure
300
Series
Quick
Connect
NC –
Input Male
Cam-Lok
(Generator)
UC –
Output
Female
Cam-Lok
(Load Bank)
A –
100 %
Rated
N –
25% Rated
0 –
None
A –
100%
2
3
0150
0200
0250
0400
0800
1000
1200
1600
2000
2500
3000
4000
F<
=240V
N-
277V -
480V
R-
500-
600V
B 0 = None
X = With
Accessories
M = Type 3R
Secure
S = Type 3RX
Secure –
Stainless
Steel
(316)
SERIES 300 Quick Connect Power Panel with Integrated Breaker Installation Manual
8 381333-504
Public
Installation
ASCO SERIES 300 Quick Connect Power Panels (QCP) are factory assembled
and tested. It is designed for exterior operation ONLY. Installation requires
mounting, connecting power conductors and auxiliary control circuits (if required.).
Supporting Foundation
The supporting foundation for the enclosure must be level, straight and capable of
supporting the weight of the cabinet as well as the cable attached to it.. Refer to the
applicable enclosure outline drawing included with the power panel for all mounting
details including door opening space.
Refer to the enclosure outline drawing for specified area and location. Proper
clearance in the front of the Quick Connect Power Panels must be 36 inches in
order to open access door and attach externally connected cables. When a
concrete floor is poured, use interlocking conduit spacer caps or a wood or metal
template to maintain proper conduit alignment.
Mounting
Refer to the outline drawing furnished with this switch and mount the ASCO
SERIES 300 Quick Connect Power Panels (QCP) according to details and
instructions shown.
NOTE: To prevent carbon monoxide poisoning from improperly ventilated generator
emissions, the Power Panel must ONLY be mounted outdoors away from any
building openings or HVAC inlets.
Mount the ASCO SERIES 300 Quick Connect Power Panels (QCP) to a rigid
supporting structure. Level all mounting points by using flat washers behind the
mounting hole locations to avoid distortion of the switch.
Line Connections
Refer to the wiring diagram provided with quick connect panel. All wiring must be
made in accordance with the National Electrical Code and local codes.
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
De–energize the conductors before making any line or auxiliary circuitry
connections.
Be sure that Source 1 and Source 2 line connections are in proper phase
rotation.
Place engine generator starting control in the OFF position.
Make sure engine generator is not in operation.
Failure to follow these instructions will result in death or
serious injury
Testing Power Conductors
Do not connect the power conductors to the power panel until they are tested.
Installing power cables in conduit, cable troughs and ceiling-suspended hangers
often requires considerable force. The pulling of cables can damage insulation and
stretch or break the conductor’s strands. For this reason, after the cables are pulled
into position, and before they are connected, they should be tested to verify that
they are not defective or have been damaged during installation.
Installation Manual SERIES 300 Quick Connect Power Panel with Breaker
381333-504 9
Public
Connecting Power Conductors
After the power conductors have been tested, connect them to the appropriate
terminals on the power panel as shown on the outline provided. Make sure the
conductors being installed are suitable for use with the terminals provided on the
breaker and in the power panel . Standard terminals are solderless, screw type
and will accept the wire sizes and types listed on the drawings provided with the
power panel . Be careful when stripping insulation from the cables; avoid nicking
or ringing the conductor. Remove surface oxides from conductors by cleaning with
a wire brush. When aluminum conductors are used, apply joint compound to
them. Tighten terminals to the torque specified on the rating label.
Quick Connect Input Power Panels (3QCN) are equipped with recessed male 16
series single pole connectors (inlets) only for connection to a temporary or portable
generator.
Quick Connect Output Power Panels (3QCU) are equipped with female single pole
connectors (outlets) only for connection to a portable load bank.
Quick Connect Input Panel (Generator)
Phase Rotation Monitor Wiring
1. Determine the Utility Phase Rotation. (ABC or CBA) and record on label.
2. Wire the Phase Rotation Monitor to match the Utility’s Phase Rotation. See
Figure 1.
Utility’s Phase Rotation ABC: A-Phase to L1. C-Phase to L3.
Utility’s Phase Rotation CBA:C-Phase to L1. A-Phase to L3.
NOTE: Factory Default setting is ABC.
Figure 1. Phase Rotation Configurations
Generator Start
A terminal block for the Engine Start pass through connections is provided.
See Figure 2.
NOTE: Refer to wiring diagram for contact ratings
Figure 2. Generator Start Terminal Block
SERIES 300 Quick Connect Power Panel with Integrated Breaker Installation Manual
10 381333-504
Public
Cam-Lok Cable Connections & Disconnection
Connecting Cam-Lok Cabling to Quick Connect Panel
1. Install Cam-Lok cables as per manufacturer’s instructions beginning with
ground conductors.
2. Determine the Utility Phase Rotation
a) Utility’s Phase Rotation ABC (Figure 3):
Gen A-Phase to QCP A-Phase
Gen B-Phase to QCP B-Phase
Gen C-Phase to QCP C-Phase
Figure 3. Phase Rotation ABC
b) Utility’s Phase Rotation CBA (Figure 4):
Gen A-Phase to QCP C-Phase
Gen B-Phase to QCP B-Phase
Gen C-Phase to QCP A-Phase
RISK OF ELECTRIC SHOCK.
Terminals energized when cables connected.
Do not connect or remove connectors until cables are de-energized.
Connections to be made by qualified personnel only.
RISK OF ELECTRIC SHOCK.
Plug connection must be made in the following order:
1. Equipment-grounding conductor connection(s)
2. Grounded circuit conductor connection(s)
3. Ungrounded conductor connection(s)
Plug disconnection to be in reverse order.
Connections to be made by qualified personnel only.
Installation Manual SERIES 300 Quick Connect Power Panel with Breaker
381333-504 11
Public
Figure 4. Phase Rotation CBA
3. Start Generator.
4. Check Phase Rotation Indicator on the line side of the Quick Connect Box.
The LED will energize if the phase sequence matches Utility rotation
(ABC, CBA).
If the LED does not Illuminate it indicates Phase Loss or Phase Reversal
5. Close (on) the Breaker.
Disconnecting Cam-Lok Cabling from Quick Connect Panel
1. Shut down the generator.
2. Open Breaker before removing Cam-Lok cables.
3. Disconnection of the Cam-Lok Cabling is done in the reverse order of
connecting with the ground disconnected last.
4. Plug disconnection must be made in the following order:
1) Ungrounded conductor connection(s)
2) Grounded circuit conductor connection(s)
3) Equipment-grounding conductor connection(s)
Provisions for Kirk Lock
Refer to Outline drawing for specific Kirk Lock requirements.
SERIES 300 Quick Connect Power Panel with Integrated Breaker Installation Manual
12 381333-504
Public
Quick Connect Output Panel (Load Bank)
Load Dump
A terminal block for the provision for the customer load dump circuitry connections
is provided. See Figure 5.
NOTE: Refer to wiring diagram for contact ratings
Figure 5. Load Dump Terminal Block
Cam Lok Cable Connections & Disconnection
Connecting Cam Lok Cabling to Quick Connect Panel
1. Open Breaker before installing Cam-Lok cables
2. Install Cam-Lok cables as per manufacturer’s instructions. * Begin with ground
conductors.
3. Close the Breaker
RISK OF ELECTRIC SHOCK.
Terminals energized when cables connected.
Do not connect or remove connectors until cables are de-energized.
Connections to be made by qualified personnel only.
RISK OF ELECTRIC SHOCK.
Plug connection must be made in the following order:
1. Equipment-grounding conductor connection(s)
2. Grounded circuit conductor connection(s)
3. Ungrounded conductor connection(s)
Plug disconnection to be in reverse order.
Connections to be made by qualified personnel only.
Installation Manual SERIES 300 Quick Connect Power Panel with Breaker
381333-504 13
Public
Disconnecting Cam-Lok Cabling from Quick Connect Panel
1. Open Breaker before removing Cam-Lok cables.
2. Disconnection of the Cam-Lok Cabling is done in the reverse order of
connecting with the ground disconnected last.
3. Plug disconnection must be made in the following order:
1) Ungrounded conductor connection(s)
2) Grounded circuit conductor connection(s)
3) Equipment-grounding conductor connection(s)
Provisions for Kirk Lock
Refer to Outline drawing for specific Kirk Lock requirements
SERIES 300 Quick Connect Power Panel with Integrated Breaker Installation Manual
14 381333-504
Public
Testing & Service
Transfer Test
Operate the power panel monthly to ensure proper operation.
Preventive Maintenance
Reasonable care in preventive maintenance will ensure high reliability and long life
for the ASCO SERIES 300 Quick Connect Power Panels (QCP)
An annual preventive maintenance program is recommended.
ASCO Power Services, Inc. is ASCO Power Technologies
service organization for the United States and Canada.
Call 1-800-800-2726 (ASCO) to request a service call and
information on preventive maintenance agreements.
Annual Inspection Checklist
\
Clean the enclosure. Brush and vacuum away any excessive dust
accumulation. Remove moisture with a clean cloth.
Perform breaker maintenance per manufacturers recommendation.
Check all cable connections by either thermal measuring or monitoring, or
mechanical check. If any connections are loose & retighten them.
HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
Apply appropriate personal protective equipment (PPE) and follow safe
electrical work practices. See NFPA70E.
This equipment must only be installed and serviced by qualified electrical
personnel.
Turn off all power supplying this equipment before working on or
inside equipment.
Always use a properly rated voltage sensing device to confirm power
is off.
Replace all devices, doors and covers before turning on power to
this equipment.
Failure to follow these instructions will result in death or serious injury.
Installation Manual SERIES 300 Quick Connect Power Panel with Breaker
381333-504 15
Public
Index
A
annual inspection, 14
ASCO Power Services Inc. 14
1-800–800–ASCO (2726)
powerwarranty@ascopower.com
B
breaker, 9, 11, 12, 13, 14
C
catalog number identification, 7
cam-lok, 11, 12, 13
conduit, 8
connections, 8, 9, 10, 12, 14
D
disconnection, 11, 12, 13
G
generator, 7, 8, 9, 11
I
inspection, 6, 14
L
limited warranty, 6
line connections, 8
load bank, 9 12
load dump terminal block, 12
M
maintenance 6, 14
mounting, 8
P
phase rotation, 8, 9. 10, 11
monitor, 9
power conductors, 8, 9
preventative maintenance, 14
S
support foundation, 8
T
technical support, 6
terminals, 9, 10, 12
testing, 8
testing & service, 14
transfer test, 14
W
wiring 9, 12
Printed in U.S.A
ASCO Power Technologies
160 Park Avenue
Florham Park, NJ 07932-1591 USA
Phone: 1 800 800-2726 (ASCO) for sales or service
www.ascopower.com
©2021 ASCO Power Technologies. All Rights Reserved
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16

Asco 300 Series Power Panels Installation guide

Type
Installation guide

Asco 300 Series Power Panels are designed for exterior use and feature integrated disconnect breakers for safe and easy power management. They come in various configurations for input (generator) and output (load bank) applications, with options for ground and neutral connections, voltage ratings, and amperage. These panels provide quick and reliable connections for power distribution and are ideal for industrial and commercial settings requiring backup power or load testing.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI