Perma-Patch
Large Drywall Patch
DESCRIPTION
Measures 8” x 8”, .024” thick
Manufactured from a patented PVC fiber composite material
Will not fuzz-up during sanding
Imprinted with standard design patterns for easy use
Designed for door knob damage, electrical receptacles, ceiling can lights and drywall mis-cuts
ADVANTAGES
Makes receptacle, ceiling and can light relocation easy
Second coat of compound can be applied immediately – very light skim coat to finish
Easily installs using standard drywall compounds
Very fast, extremely strong
Waterproof, rustproof
LIMITATIONS
Not for use with solvents or solvent-based paints that could degrade the adhesive.
Maintain 55°F (13°C) minimum temperature within the building during and after installation.
PACKAGING
Available in 50 cards of 2 (PP-2PK), 10 bags of 10 (PP-100) and 50 bags of 10 (PP-500)
DIRECTIONS
To apply, lightly sand area to be repaired. Apply drywall compound 1/8” to 1/4" thick directly to back of patch. Place patch over center of repair and wipe down flat to
wall using joint knife. Immediately skim-coat patch and let dry. Compound that remains on backside of Outlet-Patch makes patch very rigid in the damaged area. Apply
second coat, let dry, and sand.
REPAIRS OVER PAINTED SURFACES. Strait-Flex recommends the use of Strait-Flex Super-Bond or latex paint, mixed with all purpose joint compound, for enhanced
bonding strength.
WARRANTY
Strait-Flex tapes are backed by a three year warranty. When applied to a sound structure, built on a permanent foundation using recommended application techniques,
we warrant that these products will not edge-crack for a period of three years from the date of purchase. Strait-Flex International, Inc will match any manufacturer’s
warranty on a similar product. Contact Strait-Flex International, Inc for complete details.
STORAGE
Store in a dry place protected from moisture
STRAIT-FLEX INTERNATIONAL, INC
O’FALLON, MO
PHONE: 888.747.0220
FAX: 636.300.0414
STRAITFLEX.COM
SUBMITTAL APPROVALS
Job Name: _____________________________________________________________________
Contractor: _________________________________________________ Date: ______________