Blue Hawk 55445 User manual

  • Hello! I am an AI chatbot trained to assist you with the Blue Hawk 55445 User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
ITEM/ARTÍCULO #0267963
MODEL/MODELO #55445
ADJUSTABLE STORAGE RAIL
RIEL AJUSTABLE PARA ALMACENAMIENTO
PACKAGE CONTENTS/
HARDWARE CONTENTS/
SAFETY INFORMATION/
Rail
Riel
x4
Screw
Tornillo
x16
End Cap
Tapa de
extremo
x4
S-hook
Gancho en S
x12
WARNING: Read and understand all instructions before beginning installation. Failure to follow all instructions may result in serious personal injury.
• Do not mount to hollow dry wall. Mount only to wall studs or concrete.
• Do not mount to ceiling.
• Wear safety glasses during assembly.
• Holds 15 lbs. per hook when the rail is securely mounted to wall studs or concrete. If only mounted to hollow dry wall with anchors, the holding weight
reduces to 8 lbs. per hook. The holding weight of each plastic peg is 6 lbs.
PREPARATION/
Before beginning installation of product, make sure all parts are present. Compare parts with package contents list and hardware contents list. If any part is
missing or damaged, do not attempt to assemble, install or operate the product.
A B C
Peg
Soporte
horizontal
x16
D
AB14521
Note: Hardware shown actual size.
Estimated Installation Time: 15minutes/
Tools Required for Assembly (not included): Power drill 7/32 in. bit, Phillips drill bit or Phillips screwdriver, pencil, stud finder, tape measure and a level.
AA
Anchor
Ancla de expansión
x16
BB
MOUNTING INSTRUCTIONS
MOUNTING S-HOOKS AND PEGS/
CARE AND MAINTENANCE/
From time to time, check all hardware to make certain it is still fully tightened.
1
2
3
4
5
MOUNTING RAILS SEPARATELY
1.Locate wall studs with a stud finder and mark the locations with a pencil.
To gain more space, alternate tool handles, one tool handle end up, one tool handle end down.
4.S-hooks: Slide hook (C) through hole in slot until hook protrudes from other end of slot.
5.Press peg (D) into keyhole slot. Be sure peg is in all the way. To remove, pull peg straight out.
2.Place the rail (A) at desired height aligning it with the studs. Place the side with 2 screw holes
to the left. Loosely mount the left end of the rail with one screw (AA). Level the rail (A), cover
the opposite end with end cap (B) and screw (AA) this end in fully. Go back and fully tighten
first screw (AA) and insert 2 remaining screws (AA), making sure all screws (AA) are fully
tightened. Use anchor with any screws (AA) that do not hit a stud.
3.Place the rail (A) at desired height, aligning it with the studs. Place the side with 2 screw holes to
the left. Loosely mount the left end of the rail with one screw (AA). Level the rail (A), cover the
opposite end with the left side of the next rail in the line and screw (AA) this end in fully. Repeat
this procedure until desired rail length is obtained. Cover end of last rail (A) with end cap (B) and
screw it in. Use anchor (BB) with any screws (AA) that do not hit a stud.
/