LNC M6REBAHD1150PU7 Operating instructions

Type
Operating instructions
Page: - 1 - / 4
Item Number: M6REBAHD1150PU7
WARNING (To reduce the risk of fire, electric shock, or ƉĞƌƐŽŶĂůinjury):
ϭ͘ We suggest installation by a licensed electrician.
Ϯ͘ Please read the instruction carefully and save it as you may need it at later time.
ϯ͘ Before you start, NEVER attempt any work without shutting off the electricity until the work is done.
Ϳ Go to the main fuse, or circuit breaker, box in your home. Place the main power switch in the OFF” position.
Ϳ Place the wall switch in the OFF” position.
ϰ͘ Mounting surface should be clean, dry, flat, strong enough and 1/4” larger than the canopy on all side. Any gaps
between the mounting surface and canopy exceeding 3/16” should be corrected as required.
ϱ͘ Make sure that the ceiling or wall can stand the weight of the lamp before ŝŶƐƚĂůůĂƚŝŽŶ.
ϲ͘ Make sure the voltage you are using is 120V. The maximum wattage is dLJƉĞ͕DĂdžϰϬt per bulb.
ϳ͘ Keep the lamp away from acidic and ĂůŬĂůŝŶĞƐƵďƐƚĂŶĐĞƐ in case of damaging the surface of the lamp.
ϴ͘ When replacing bulb, you should turn off or unplug the lamp and you must wait until it is cool as bulbs get hot quickly.
ϵ͘ The safety instructions appearing in this manual are not meant to cover all possible conditions that may occur. It
must be understood that common sense, caution and care must be used with any electrical products.
IMAGE FOR FINISHED PRODUCT˖
˖
support@ihomeangel.com
Page: - 2 - / 4
TOOLS REQUIRED (NOT INCLUDED):
Before ƐƚĂƌƚŝŶŐ assembly and installation please prepare the needed tools as below picture
PARTS TYPE & QTY INCLUDING:
ϭ͘ Carefully remove the fixture from the carton and check that all parts and accessories are included as shown in the
above illustration.
Ϯ͘ DĂŬĞƉƌĞͲŝŶƐƚĂůůĂƚŝŽŶ
& 6LQJOHEDU
' Green ground screw (1)
( &DQRS\
) &ROODUULQJ
* &ROODUORRS
+ 4XLFNOLQN
, &KDLQ
- /RRS
. /LG
/ 6FUHZ
0 *ODVVVKDGH
^^KZ/^ Θ Ydz E>K^͗
$ :LUH FRQQHFWRU 
% 0RXQWLQJVFUHZ
ASSEMBLY & INSTALLATION INSTRUCTIONS:
Page: - 3 - / 4
^ƚĞƉϭ͗LJŵĞĂƐƵƌŝŶŐ͕ĚĞƚĞƌŵŝŶĞƚŚĞĐŽƌƌĞĐƚŶƵŵďĞƌŽĨůŝŶŬƐŶĞĞĚĞĚĨŽƌƉƌŽƉĞƌŚĂŶŐŝŶŐŚĞŝŐŚƚ͘hƐŝŶŐƚŚĞĐŚĂŝŶƉůŝĞƌƐ͕
ĚŝƐĐŽŶŶĞĐƚĂŶĚĚŝƐĐĂƌĚƚŚĞƵŶǁĂŶƚĞĚƉĂƌƚ͘
^ƚĞƉϮ͗^ĐƌĞǁƚŚĞůŽŽƉ;:ͿŽŶƚŽƚŚĞůŝĚ;<Ϳ͘
ƚƚĂĐŚƚŚĞƋƵŝĐŬůŝŶŬ;,ͿƚŽĐŽŶŶĞĐƚƚŚĞĐŚĂŝŶ;/ͿĂŶĚƚŚĞůŽŽƉ;:ͿŽŶƚŚĞƚŽƉŽĨ ůŝĚ;<Ϳ͘
^ƚĞƉϯ͗ĂƌĞĨƵůůLJǁĞĂǀĞƚŚĞǁŝƌĞƐƚŚƌŽƵŐŚƚŚĞĐŚĂŝŶ;/ͿŝŶĂŶĚŽƵƚŽĨĞǀĞƌLJŽƚŚĞƌůŝŶŬĂŶĚƐƚŽƉũƵƐƚǁŚĞŶLJŽƵ
ƌĞĂĐŚƚŚĞƚŽƉŽĨĐŚĂŝŶ;/Ϳ͘'ĞŶƚůLJƉƵůůƚŚĞǁŝƌĞƐƚŽĞŶƐƵƌĞƚŚĞǁŝƌĞƐĂƌĞŶŽƚƐƚƌĞƐƐĞĚ͘
ϯ͘ dƵƌŶŽĨĨƉŽǁĞƌ
ĞĨŽƌĞLJŽƵƐƚĂƌƚƚŚĞŝŶƐƚĂůůĂƚŝŽŶ͕EsZĂƚƚĞŵƉƚĂŶLJǁŽƌŬǁŝƚŚŽƵƚƐŚƵƚƚŝŶŐŽĨĨƚŚĞĞůĞĐƚƌŝĐŝƚLJƵŶƚŝůƚŚĞǁŽƌŬŝƐ
ĚŽŶĞ͘
Ϳ 'ŽƚŽƚŚĞŵĂŝŶĨƵƐĞ͕ŽƌĐŝƌĐƵŝƚďƌĞĂŬĞƌ͕ďŽdžŝŶLJŽƵƌŚŽŵĞ͘WůĂĐĞƚŚĞŵĂŝŶƉŽǁĞƌƐǁŝƚĐŚŝŶƚŚĞ͞K&&͟ƉŽƐŝƚŝŽŶ͘
Ϳ WůĂĐĞƚŚĞǁĂůůƐǁŝƚĐŚŝŶƚŚĞ͞K&&͟ƉŽƐŝƚŝŽŶ͘
ϰ͘ DĂŬĞŝŶƐƚĂůůĂƚŝŽŶ
Step 1: Remove the ĐŽůůĂƌ ring (&) from collar loop('). Attach the single bar () to outlet box with mounting screws (B).
EŽƚĞ͗ďĞƐƵƌĞƚŚĂƚƚh
he side of single bar marked "GND" must face out
͘
Step 2: Pass canopy () over the mounted collar loop (') then secure with ĐŽůůĂƌ ring (&) to ĐŚĞĐŬƚŚĞƉƌŽƉĞƌƉŽƐŝƚŝŽŶ.
dŚĞŶƵnscrew ĐŽůůĂƌƌŝŶŐ;&ͿĨƌŽŵĐŽůůĂƌůŽŽƉ;'ͿĂŶĚƌĞŵŽǀĞƚŚĞĐĂŶŽƉLJ;Ϳ͘ZĞĨĞƌƚŽƚŚĞĨŽůůŽǁŝŶŐŶŽƚĞ͕LJŽƵ
ǁŽƵůĚŬŶŽǁƚŚĞƉƌŽƉĞƌƉŽƐŝƚŝŽŶǁŚĞƌĞĐŽůůĂƌůŽŽƉ;'ͿƐŚŽƵůĚďĞůŽĐĂƚĞĚ͘
Note: The canopy () should be snug against the ceiling and the collar loop (') should be screwed enough
threads (no less than 6 threads)ŽŶƚŽ the ƉƌĞͲĂƐƐĞŵďůĞĚthreaded nipple for more secure hanging.If not,
adjust the ƉƌĞͲĂƐƐĞŵďůĞĚƚŚƌĞĂĚĞĚŶŝƉƉůĞ and collar loop (') until the ƐĞĐƵƌĞ height is reached.
dŚĞŶƌemove the ĐŽůůĂƌ ring (&) and canopy()͕ĂŶĚƐĞƚĂsideĨŽƌƚŚĞĨŽůůŽǁŝŶŐƐƚĞƉƐ.
Step 3: Slip the ĐŽůůĂƌ ring(&) over the chain(/),then do the same with the canopy().
Step 4: Open the quick link(,)attach the quick link (,) to connect the loop ('). Close the quick link(,)͘Pass the
wires ĨƌŽŵƚŚĞĐŚĂŝŶ;/ͿƚŽƚŚĞ collar loop(') ĂŶĚthe top of ƉƌĞͲĂƐƐĞŵďůĞĚƚŚƌĞĂĚĞĚŶŝƉƉůĞand gently pull
ƚŚĞǁŝƌĞƐƚŽĞŶƐƵƌĞƚŚĞǁŝƌĞƐĂƌĞŶŽƚƐƚƌĞƐƐĞĚ.
Step5: If needed, ƐŚŽƌƚĞŶ thelength of fixtureǁŝƌĞƐ.At this point, the remaining wire length measured ĂďŽǀĞƚŚĞ
ƐŝŶŐůĞďĂƌ;ͿŝƐĂƚůĞĂƐƚϲΗ͘
Page: - 4 - / 4
Twist ZLUHV WRJHWKHU ZLWK plastic wire connector untiltightly joined, DQG wrap each connector with
approved electrical tape.Be sure that no wire strands are exposed and then carefully tuck all wires into the
outlet box.
Step 7: Raise canopy () to ceiling and secure canopy () in place by tightening ĐŽůůĂƌ ring (&) onto collar loop (').
Step 8: /ŶƐƚĂůůƚŚĞďƵůď;ŶŽƚŝŶĐůƵĚĞĚͿ;WůĞĂƐĞĚŽŶŽƚĞdžĐĞĞĚƚŚĞŵĂdžŝŵƵŵǁĂƚƚĂŐĞƌĞĐŽŵŵĞŶĚĞĚŽŶƚŚĞƐŽĐŬĞƚ͘Ϳ
&ŝdžƚŚĞŐůĂƐƐƐŚĂĚĞ;DͿŽŶƚŽƚŚĞůŝĚ;<ͿǁŝƚŚƐĐƌĞǁ;>Ϳ͘
EŽƚĞ͗ƵŶƐĐƌĞǁĂŶĚƌĞŵŽǀĞƚŚĞƐĐƌĞǁ;>ͿĨƌŽŵƚŚĞůŝĚ;<ͿďĞĨŽƌĞƉŽƐŝƚŝŽŶŝŶŐƚŚĞŐůĂƐƐƐŚĂĚĞ;DͿ͘
ϱ͘ ŚĞĐŬĞǀĞƌLJƚŚŝŶŐŝƐĂůƌĞĂĚLJŝŶƐƚĂůůĞĚƉƌŽƉĞƌůLJ͕ƚŚĞŶLJŽƵĐŽƵůĚƚƵƌŶŽŶƚŚĞůŝŐŚƚ͘ŶũŽLJ͊
CLEANING.
To clean, wipe ƚŚĞ fixture with a soft cloth. Do not use abrasive materials such as scouring pads or powders, steel
wool or abrasive paper.
ORDERING PARTS.
Keep this sheet for future reference in case you needto order replacementparts. All parts for this fixture can be
ordered from ƚŚĞ place of purchase. Be sure to use exact wording from illustration when ordering parts.
Step 6: Make wire connections
Connect wires as below wires connecting shown. W>^ NOTE d,d'ZKhEt/Z/^ZKWWZt/Z,NEVER
CONNECT Kd,Zt/Z^dK'ZKhEt/Z^͘
Connect ground wireƐ according to ƚŚĞbelow chart Connect wires according to ƚŚĞbelow chart
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4

LNC M6REBAHD1150PU7 Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI