Gronomics RGBT 34-95 Assembly Instructions

  • Hello! I am your chat assistant and I have reviewed the assembly instructions for the GRONOMICS Raised Garden Bed models RGBT 34-95 and RGBT 34-95S. This document provides details on how to assemble the three-tier raised garden bed, including instructions on part identification, side rail and center support assembly, and final steps. I am ready to answer your questions about assembling your garden bed.
  • What should I do if there are missing or replacement parts?
    Is ground preparation required before assembling the garden bed?
    What is the recommended oil finish for the cedar?
www.gronomics.com East Bethel, MN USA 763-753-7374
Continued
ITEM QTY.
Parts List
1 4 1901R
2 2 1902R
3 10 4500T
4 2 4500TL
5 7 3100T
DESCRIPTION
Corner Post, 2 Dovetailed Sides, 4” x 4” x 19”
Center Post, 3 Dovetailed Sides, 4” x 4” x 19”
Side Rail, 45” x 5-1/2” x 7/8
Side Rail w/Logo, 45” x 5-1/2” x 7/8
Side Rail, 31” x 5-1/2” x 7/8
Raised Garden Bed (3 Tier 34” x 95”)
Assembly Instruction T & G
1
Parts Identi cation
Stack matching pieces in piles. Using the parts
list, locate and count the individual pieces and
verify that you have received the correct number
of pieces.
If any pieces are missing or replacement parts
are required, contact Gronomics at
1-855-299-6727.
NOTE: Ground preparation is optional,
however we recommend leveling area under
frame of product, or place product directly on
a flat level surface before filling with soil.
1
2
3
4
5
Item #: RGBT 34-95
Item #: RGBT 34-95S
Packaged & Inspected by: Date:
PART #
Product Care & Maintenance - Western Red Cedar will turn a weathered grey if left unfinished. Although no finish is required for
cedar products when used outdoors, a natural oil finish applied regularly will help maintain the beauty and minimize cracking and
drying. It is recommended to use Gronomics Garden Bed Oil (Item # GBO-1Q), a non-toxic, food safe finish that is very easy to
apply. Apply Oil when air and wind temperatures are between 50-90degrees. Avoid applying in direct sunlight.
www.gronomics.com East Bethel, MN USA 763-753-7374
3
End Rail And Center Support Rail Assembly
2
Side Rail Assembly
NOTE: Garden bed will be assembled upside down and ipped over
when completed.
Stand two 4” x 4” x 19” corner posts (Item 1) and one 4” x 4” x 19” center
post (Item 2) between the corner posts with slots facing each post and
slots facing away from you.
Install two 45” x 5-1/2” side rails w/Logo (Item 4), (position side rails w/
Logo upside down) into the slots and slide to the bottom of the slots.
Repeat procedure for the remaining two 4” x 4” x 19” corner posts and
the 4” x 4” x 19” center post, using 45” x 5-1/2” side rails (Item 3).
Install the three 31” x 5-1/2” side rails (Item 5) into the slots and slide to
the bottom of the slots.
1
Position Logo Upside Down
2
4
1
4
5
5
5
5
Garden Bed Completed
4
Final Side Rail Assembly
Install the eight remaining 45” x 5-1/2” side rails (Item 3) into the slots
and slide down.
Install the four remaining 31” x 5-1/2” side rails (Item 5) into the slots and
slide down.
Flip the garden bed right side up. (See step 5).
Garden bed shown in nished position.
When lling with soil, raise the center support rail (Item 5)
to the middle of the slots (as shown).
NOTE: Ground preparation is optional. It is recommended to level an
area under the frame of the garden bed before placing garden bed and
lling with soil.
Soil Capacity: 28.1 Cubic Feet
5
533
Logo
Logo
6
/