Dural WPDS-SCRW-120 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Dural WPDS-SCRW-120 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Durabase XPS Foam Backer Board Installation Guide
Dural Durabase XPS Foam Backer Board can be installed over wood and metal studded walls
horizontally or vertically by using the Dural Durabase Galvanized Screws & Washers. All vertical
joints must be supported by suitable, loadbearing framing. Maximum spacing of studs is 16 inches
on center.
Step 1
Place screws & washers 12 inches apart
vertically and 16 inches apart horizontally. It
is best when applying the screws to create a
slight depression in the board to reduce any
buildup at the screw. Vertical seams must
be staggered.
[email protected]800-278-1956
Step 2
Seam Waterproong - Method 1
(WP Seam Tape)
Cover all seams and screw/washer dents with thin-set
and Durabase WP seam tape. Make sure all seams and
screws/washers are fully covered with a minimum 2 inch
overlap (approximately a 4.5” patch to cover washers).
Use a grout oat to remove any excess thin-set and air
pockets.
Seam Waterproong - Method 2
(Urethane Adhesive)
Cover all seams and screw/washer dents with urethane
adhesive. Flatten the excess adhesive with a spackle
knife. Make sure all seams are fully covered for a
watertight seal.
/