Raingler NETS GRIPS N210 Installation guide

Type
Installation guide
2003 - 2009 Toyota 4Runner 4th Gen (N210)
Ceiling Attic Net Installation
NOTE: Many newer models have B-pillar handles and even overhead on the ceiling that can be used for some of the top
mounting locations. Check to see if you prefer to use these factory locations as the nets typically have enough adjustment
to allow for this option. If your vehicle does not have handles in desired locations or you prefer to install mounting points for
better fitment, please follow the below steps.
IMPORTANT: READ INSTRUCTIONS FULLY BEFORE STARTING
Time:
approximately 60 minutes
Paw Level:
Tools:
1. Ratchet or Wrench
2. 10MM socket/wrench
3. 14MM socket/wrench
4. Small flat blade and/or panel removal tool for removing access covers and releasing plastic snap divots.
866-905-7625 | Tech@RAINGLER.com | Raingler.com
*EZ install Ceiling Nets will not need any tools to
install and typically take about 10 minutes simply
installing on OEM handles or the C102 mounts
explained in Step 2 below.
* Your particular model may very slightly from these shown and may include additional
hardware that you dont need. Please contact us for assistance if questions before
proceeding.
*Instructions show process for 2 and 3 row equipped models.
Step 1
D pillar mounting.
3rd row equipped models remove the plastic
upper seat belt bolt to access the 14mm black
bolt and remove.
2nd row equipped models may have mirrors on
the trim panels that can easily pop out.
866-905-7625 | Tech@RAINGLER.com | Raingler.com
Loosely pop back just the top of the upper D pillar trim
piece just enough to slide the C100XL behind the trim
and align the mounting hole to the seat belt bolt.
2nd row version 3rd row version
Reinstall with the D ring tether protruding over the top of the D pillar trim and reassemble.
3rd row version shown here.
866-905-7625 | Tech@RAINGLER.com | Raingler.com
Step 2
Above the ¼ window mounting
and optional B pillar forward
mounting.
Your model may have handles
here, plastic hooks, or nothing at
all.
If you have plastic hooks or
handles, remove the side pop out
cap and remove the Phillips or
10mm bolts and reassemble with
the C102 hardware as shown.
If you have nothing here, you will need to install the C100M
hardware set
See video here for details. https://vimeo.com/316655122
Line up this location last, once the net has been put into
location for the most exact alignment.
Step 3
Line up the ceiling net to the factory handles and
previously installed D rings. Adjust and center to tension
buckles and mounting straps in desired location.
866-905-7625 | Tech@RAINGLER.com | Raingler.com
Step 4
Tie up the loose ends. You can do this by feeding the end of the strap through the opening of
the buckle to create a loop. Feed the strap through the loop, and the strap behind, continue
until no strap is hanging.
See video here for details:
https://vimeo.com/316588617
Thank you for purchasing Raingler Nets.
If you have any questions please contact us,
we are here to help!
See all our install videos on Vimeo!
https://vimeo.com/raingler
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5

Raingler NETS GRIPS N210 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI