Paradyne Hotwire 7975 Installation guide

Type
Installation guide
TM
1
7975-A2-GZ40-00
July 1998
Ferrite Choke
Installation Instructions
Document Number 7975-A2-GZ40-00
July 1998
Overview
This document describes the procedure for installing a ferrite choke onto the DTE
cable of the Hotwire Model 7975 M/SDSL standalone termination unit.
CAUTION:
All ferrite chokes that are supplied must be installed following these
instructions to ensure compliance with FCC Part 15, VCCI, and
CISPR22 rules.
Installation
Procedure
To install the ferrite choke onto the DTE cable:
1. Open the ferrite choke and place it around the cable as close to the cable
connector as possible.
2. Close the two halves around the cable and snap the choke shut, pressing
down on the plastic latch to secure it in place.
3. Add a tie wrap (not included) as shown to prevent the ferrite choke from
slipping down the cable.
97-14820-02
Ferrite Choke
Plastic
Latch
Connector
End
Tie
Wrap
Copyright 1998 Paradyne Corporation
  • Page 1 1

Paradyne Hotwire 7975 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI