  • Hello! I've reviewed the provided installation guide for the PREMIERMOUNTS PSD-DPAB Mounting Base. This document details the steps required to securely mount the base, including marking locations, drilling holes, and using lag bolts and washers. I am ready to answer your questions about the installation process and the required tools and hardware as described in the guide.
  • What size drill bit should be used for the pilot holes?
    What size Allen Key is required for tightening the screws?
    What type of bolts are used to secure the base?
    How many mounting holes should be marked?
Installation Guide
PSD-DPAB
5/32 Allen KeyFinned Anchor5/16Washers 5/16 x 3
Lag bolts
Base
x1x4x4 x4x1
1 2
34
Find your desired mounting location. Use a pencil and mark 4
mounting holes locations through the slots.
Lightly hammer the finned anchors into the holes. Place the base over the finned anchors and use one
5/16 x 3 lag bolt and 5/16washer per hole.
Use a drill gun and a 3/8 concrete drill bit on mark locations.
Finned Anchor
5/16x 3
Lag bolts
5/16Washer
premiermounts.com | p. 800.368.9700 | e. [email protected]
5 6
Installation Guide
PSD-DPAB
9500106_0
M8 x 10mm
Socket Set
Use 5/32 Allen Key to tighten the pre-installed M8 x 10mm
Socket Set screws.
5/32 Allen Key