• Insert the uncut end of the cross tee into the main beam through the rectangular
hole and rest the cut end of the tee on the wall molding
• Cut the second border cross tee to length and insert it.
• Temporarily fasten the cross tees to the wall molding with a clamp or tape so
they do not move.
Squaring the Gri
To achieve the best end results, it is important to make sure your grid is square
at this point in the installation. This will allow you to ad
ust if chan
es are required
• Install two 4' cross tees between the two main beams in line with the fi rst two
r
r t
C
.
illus. B
NOTE
When connecting two cross tees in the same rectangular hole o
a main
eam,
nsert t
e secon
tee
nto t
e s
ot
y pass
ng on t
e r
ght s
d
t
e a
rea
y
nsta
e
cross tee.
TIP: Installin
cross tees is easier if the tee is inserted into the rectan
ular slot
at a downward an
le from above the
rid plane. Listen for an audible clic
to ensure a goo
connect
on
• To check that your grid is square, measure across the diagonals o
the 2' x 4'
opening. The measurements will be the same if the grid is square. If the
measurements are not the same
trim one of the mains further until the
agona
s are equa
. (illus. B
Installing Remaining
rid & Leveling the
yste
• Complete the fi rst two rows of main beams by han
in
main beams from the hooks and joining their ends
together. Listen
or an audible click to ensure a good
nn
t
n. (illus.
At the far end of each of these fi rst two rows, you’ll need
o cut both main beams to rest on the wall moldin
: Use the le
t-over ends o
the cut mains to start
iti
n
l r
w
f m
in
m
.
•
t
iti
n
l
r
r
r
t
tw
n th
w
ll
n
r
t r
w
m
in
m
• If you have additional rows of main beams to install, stretch a second string
rom one side o
the room to the other aligning it with the
rst 4' cross tee
as shown (D) (
llus. B)
• This second strin
will be your
uide for cuttin
the remainin
rows of main
beams. Just measure
rom the end wall to the string to determine the distance
for the fi rst rectangular cross tee slot you will use.
N
TE: You must line up cross tee slots for the
rid to be square!
• Install all remaining main beams and 4' cross tees
• Measure and cut border cross tees alon
the last wall.
• Now that your grid is installed, it's time to do
nal leveling.
• Start by attaching a magnetic level to the bottom of a main beam located in a corner of the room. (Main beam should
be alon
a wall, restin
on wall moldin
.
Holdin
the main beam, squeeze the sprin
tabs on the QuickHan
bracket
to a
ow t
e
oo
to s
e up or
own.
ust t
e ma
n
eam to
e
eve
an
rest
ng on your wa
mo
ng.
or
ng
from the corner of
our room, check and level cross tees and main beams until the s
stem is level.
For additional guidance, see our video online at ceilings.com
installation
How to Install the QuickHang
™
Installation Kit
nsert cross
tee
er
Main beam
Existing
cross tee
Insert to the RIGHT
side of existing tee
Insert at a
downward angle
Full 4'
r
t
Second strin
measuremen
llus.
llus.
R
-
77
-41