ADDITIONAL INSTALLATION STEP ADDED
SCALE: NTS
R1 10/09/21
2.0 UNLESS OTHERWISE STATED
LIGHTING - 4K - IP40
2xDALI CONTROL CIRCUITS
1/1.2 & 1.5
FOR UP & DOWNWARD
DATE:
DETAILS DRG
THORN LIGHTING
GLOSS WHITE
INSTALLATION & WIRING
M/STEEL-0.4 MIRO5
TITLE/PROJECT
CLIENT/CUSTOMER:
DRAWING PROTECTED BY COPYRIGHT
C
DATE:
DRWG NO.
DRAWN:
SC
21/06/21
15-8712-02INST SHT2 -R1
MATERIAL: FINISH:
REVISIONS:NO.
BEDHEAD FTG
GENERAL TOLERANCES: LINEAR= 1.0 ANGULAR=
A1
I
I
WALL BRACKET MAIN BODY
FIXING SLOTS
SECTION J-J
SCALE 1 : 4
K
FIT BOTH SAFETY CORD DOG CLIPS TO WALL
MOUNTED ON THE WALL FIXED BRKT.
FIXED BRKT IN POSITIONS SHOWN ABOVE
THEN CONNECT THE 5 WAY PLUG, C/W
FLYING LEADS TO THE 5 WAY SOCKET
ONCE MAIN BODY IS ALIGNED WITH THE WALL
FIXED BRKT ASSEMBLY, FIT AND TIGHTEN M4
SCREWS C/W WASHERS THEN FINISH BY FITTING
THE SCREW DUST CAPS.
FITTING IS NOW FULLY INSTALLED.
PLATE.
MOUNTED ON THE WALL FIXING
CABLES TO THE TERMINAL BLOCK
WIRE THE MAINS IN AND DALI
THE TOP.
SURE THE SLOT FIXINGS ARE AT
ASSEMBLY TO THE WALL MAKING
FIXING PLATE AND GEAR TRAY
SCREW FIX WALL MOUNT
STEP 2;
STEP 3;
ONCE WALL FIXING BRKT IS FIXED AND
STEP 4;
STEP 6;
MEETS THE WALL,
MAIN BODY DOWNWARD UNTIL IT
WITH THE FIXING SLOTS, ROTATE THE
ONCE FIXING TAGS ARE ALIGNED
STEP 5;
UP THE MAIN BODY ASSEMBLY.
WIRED INTO MAINS / DALI THEN OFFER
THE WALL FIXED BRKT SLOTS
UNTIL THE MAIN BODY TAGS SLIP INTO
AND SLIDE OVER WALL FIXED BRKT
ANGLE THE MAIN BODY AS SHOWN &
DOG CLIP SAFETY CORDS ARE FITTED,
ONCE TERMNIAL BLOCKS ARE MATED &
STEP 1;
REMOVE SCREW CAP COVERS AND
REMOVE BOTTOM FIXING SCREWS.
HINGE THE WALL MOUNT FIXING PLATE OUTWARD,
FROM THE SCREW SIDE OF MAIN BODY,
THEN SLIDE THE WALL PLATE AWAY FROM THE TAG
FIXINGS TO REMOVE THE WALL PLATE.
DISCONNECT THE PLUG AND SOCKET TERMINAL
BLOCK CONNECTIONS TO RELEASE WALL PLATE
FROM MAIN BODY FULLY.
J
J
FIT SAFETY CORD DOG CLIPS TO
WALL MOUNTED BRKT ASSY
CONNECT 5 WAY PLUG TERMNIAL
BLOCK TO CORRESPONDING
5 WAY SOCKET MOUNTED ON
WALL FIXED BRKT ASSY
DETAIL K
SCALE 1 : 1.1
SHOWING MAIN BODY
TAGS FITTING INTO THE
WALL FIXED BRKT SLOTS
SECTION L-L
END VIEW
SCALE 1 : 4
M4 FIXING SCREWS AND
CAPS READY TO BE FITTED
SIDE VIEW
L
L
PLAN VIEW
LOOKING FROM
BELOW
THE FITTING
THE BESA PIERCINGS
USING DIMPLED FIXINGS
OR ALTERNATIVELY USING
BODY ASSY, FIXING POSITION
CORD, SECURED TO MAIN
HEAVY DUTY DOG CLIP SAFETY
BODY ASSY, FIXING POSITION
CORD, SECURED TO MAIN
HEAVY DUTY DOG CLIP SAFETY
5 WAY SOCKET TERMINAL BLOCK
SCREW FIXED TO WALL
TO MAINS IN TERMINAL BLOCK.
LABELLED INCLUDING EARTH LINK
BRKT ASSEMBLY - TO BE WIRED AS
MOUNTED TO GEAR TRAY / WALL
THE CABLE RESTRAINT
TERMINAL BLOCK AND SECURE CABLE USING
GROMMETED HOLE
MAINS IN 20mm
WIRE MAINS IN AND DALI CABLES TO THIS
5 WAY MAINS AND DALI TERMINAL BLOCK.
TERMINAL BLOCK WIRING I.E UPLIGHT TO UPLIGHT ETC
5 WAY 'PLUG' TERMINAL BLOCK
IS PART OF THE MAIN BODY ASSEMBLY
AND COMES WITH FLYING CABLES FOR
UPLIGHT / DOWNLIGHT & EARTH CONNECTIONS.
WIRING MUST CORRESPOND WITH THE SOCKET
FRONT VIEW SHOWING
WHEN MOUNTED
TO THE WALL
H
N
=600=
6
THE FITTING WHEN MOUNTED TO
THE WALL
TAB SLOTS TO BE AT THE TOP OF
THE WALL FIXED BRKT ASSY
MAIN BODY ASSEMBLY FIXING
M4 CLENCH NUT FIXINGS
ARE AT THE BOTTOM OF
SLOTS TO TOP
D
END VIEW
SCALE 2 : 3
DETAIL H
5 WAY MAINS AND DALI TERMINAL
BLOCK. WIRE MAINS IN AND DALI
CABLES TO THIS TERMINAL BLOCK
AND SECURE CABLE USING THE
CABLE RESTRAINT
PLAN VIEW SHOWING
TOP OF WALL BRKT WHEN
MOUNTED TO THE WALL
=923=
=800= DIMPLE FIXING CTS
DETAIL N
SCALE 2 : 3
DETAIL D
SCALE 2 : 3
SLOTS TO TOP
SIDE VIEW
M
M
PLAN VIEW
LOOKING FROM
BELOW
THE FITTING
SCALE 1 : 3
SECTIONED
END VIEWS
FIXING SCREWS
SECTION M-M
END VIEW
SCALE 1 : 4
PLUG AND SOCKET TERMINAL
BLOCK AND FLYING LEADS
WALL MOUNT
FIXING PLATE