aoyue Int720 User manual

Category
Soldering irons
Type
User manual

Aoyue Int720 is a focused infrared welding system that combines soldering/desoldering features and infrared (IR) technology in one sophisticated package. Designed for reworking on double-sided and diverse technology printed circuit boards (PCB), the system utilizes infrared heat wave technology, eliminating the need for conventional hot air. It features an integrated hands-free IR solder light gun for ease of use and a unique mechanical design for precise soldering, preventing the displacement of surrounding components.

Aoyue Int720 is a focused infrared welding system that combines soldering/desoldering features and infrared (IR) technology in one sophisticated package. Designed for reworking on double-sided and diverse technology printed circuit boards (PCB), the system utilizes infrared heat wave technology, eliminating the need for conventional hot air. It features an integrated hands-free IR solder light gun for ease of use and a unique mechanical design for precise soldering, preventing the displacement of surrounding components.

24
Manufacturer:
AOYUETONGYIELECTRONICEQUIPMENTFACTORY
JishuiIndustrialZone,Nantou,ZhongshanCity,
GuangdongProvince,P.R.China
http://www.aoyue.com
FocusedInfraredWeldingSyste m
Int720
INSTRUCTIONMANUAL
ThankyouforpurchasingAoyue720FocusedInfraredWeldingSystem.
Itisimportanttoreadthemanualbeforeusingtheequipment.
Pleasekeepmanualinaccessibleplaceforfuturereference.
This manual is designed to familiarize the technician with
the proper operation and maintenance of the equipment.
The “Care and Safety Precautions” section explains the
hazards of using any type of soldering or reworking device.
Please read carefully and observe the guidelines in order to
maximize usage and minimize the risk of injury or accidents .
2 23
1.)WhatIRsolderlightguntempera tureshouldIuse?
Between 180380°C. Only increasetheIRsolderlightgun tempera
ture after you have increased the preheater to the required tem
perature.AlwayspreheatthePCB(betwee n30and90seconds)to
allowheattoconductthroughthecomponentbeforeapplyingtheIR
solderlightgun.
2.) Wh at is the working distance of the IR solderlight gun
andhowdoImoveitforrework?
Approximately 510mm when reworking and move  up to 30mm
when removing component. Use the gears attached to the device,
particularlytotheIRsolderlightlightgun,toadjustthedistance.
3.)Whatbackheatse ttingshouldIuse?
Generally180°200°Csetonthepreheaterisagoodstartingpoint.
Thesystemisalreadyconfiguredtopre heatat200°C.Withthecor
rectpreheatersetting,thetopofthePCBwillreachapprox imately
120140°Cinabout60120seconds.
4.)WhydoIneedtheweldinggoggles?
Thegoggleshastwoimportantfunctions:oneistoletyouviewthe
focusedinfraredlightforprecisionsoldering.Theotheristop rotect
youreyesfromharmfuleffectsbroughtbyIRexposure.
FREQUENTLYASKEDQUESTIONS(FAQ)
22
BASICTROUBLESHOOTINGGUIDE
PROBLEM6:SOLDERINGTEMPERATUREPANELDISPLAYS
UNKNOWNCHARACTERS
DESCRIPTION:Afterswitchingthesolderingironbutton,C10,the
solderingtemperaturedisplaypanelshows“350C”shortlythenpro
ducesthreeshortbeepsorthreeconsecutivehighpitchsounds.
Thepanelwillthendisplayunknowncharactersasillustratedbelow.
SOLUTIONS:
1. Checktheconnectionofthesolderingtip.Tightenifitisloosely
connected.OR,
2. T hesolderingtipmayhavebeendamagedandneedstobere
placed.
PROBLEM7:DISPLAYANDOTHERDEVICEOPERATION
ISSUES
SOLUTION: Trytopressthe“RESET”buttononthedevice.Note
thatresettingthedevicewillalsoreset all previouslydefinedcon
figurations.
OTHERPROBLEMSNOTMENTIONED:
Contactthevendor.
3
TABLEOFCONTENTS
PRODUCT ILLUSTRATION …………………………………… 4
PRODUCT DESCRIPTION …………………………………… 5
FUNCTIONS & FEATURES …………………………………… 6
PACKAGE INCLUSION …………………………………….. 7
SPECIFICATIONS ……………………………………………. 8
OPERATING PROCEDURES ……………………………. 915
TECHNICAL DESCRIPTIONS ………………………………. 16
CARE & SAFETY PRECAUTIONS ………………………….. 17
MAINTENANCE ………………………………………… 1819
REWORKING TIPS ………………………………………….. 20
BASIC TROUBLESHOOTING GUIDE …………………. 2122
FREQUENTLY ASKED QUESTIONS ………………………... 23
4
PRODUCTILLUSTRATION
21
BASICTROUBLESHOOTINGGUIDE
PROBLEM1:THEUNITHASNOPOWER
1. CheckiftheunitisswitchedON.
2. Checkthe fuse. Replacewith the sametype if fuse is blown
(seeMAINTENANCEsection).
3. Checkthepowercordandensuretherearenodisconnections.
4. Verifythattheunitisproperlyconnectedtothepowersource.
PROBLEM2:BULBERROR
T his may be caused by either a blown fuse,ol d or burnt lamp,
corrodedlamppinsoradefectivelampsocket.Checkthedefec
tivecomponentandreplacewhennecessary.
PROBLEM3:INFRAREDLAMPISNOTWORKING
T heIRlampha s alife expectancyof30,000cycles or50 hours
atfullpow er.Replacewithanewlampifitalreadylooksburnt.
PROBLEM4:POORINFRAREDLIGHTOUTPUT
Check the lamp pins and socket for cor rosion. Residue on the
lamp pins may prevent  proper contact betwee n the lamp pins
andthelampsocket.Removethelampa ndcleanthepi nslightly
wit habrasivepaper.
PROBLEM5:PREHEATERMALFUNCTI ONS
T hismay becaus ed by eithera blown mainsoraproblemwith
thec onnections.Checkifthepre heaterisproperlyconnectedto
the(m ainunit) controller.
20
U sefluxgel.Th egelwillturnintofluid/liquidtoindicatethat
the PCB is already preheated. The heat from  the IR solder
light gun may the n be applied. Using f lux gel also helps in
protectingandsecuringproperplacementofcomponents.
T helongerth ecomponentorthePCBispreheated,theless
topheatisrequiredtodotherework.
When the solde r is fully molten, tap the PCB  and watch the
surfac etensionofthesolderdrawthecomponentintoperfect
alignment.
REMOVINGORREP LACINGACOM PONENT
Applyfluxtosolderjoints.
Preheat:Wait 30to90secondsforthefluxtoturnintoliquid.
Reflow:UsetheIRsolderlightgun(therewillbetwoburstsof
smoke(fluxflumes),andonthesecondone,youshouldhave
reachedreflow).
Remove component with the IR solderlight gun raised about
30mmabovethecomponent.Usetweezersorvacuumpento
pickupthecomponent.
REWORKINGTIPS
REMINDER:AlwayswearweldinggogglesORsecuretheprotective
lenswhenreworking.
5
TheAoyue720FocusedInfraredWeldingSystemisareworking
equipmentthatcombinessoldering/desolderingfeatureandinfrared
(IR)technologyinonesophisticatedpackage. Iti s designed forre
workin g on doublesided and diverse technology printed circuit
boards(PCB).
T hesystemadaptedtheconceptofheatenergyreflowfro m
topandbottomheatsources.Thetopheat isderivedfroma200
WattshortwaveIRl ampwhilethebottomheatsourcedeliversa
maximumof650Watts mediumwaveIR.Undernormaloperating
condition , approximately 25% of the energy is provided by the
topheaterand75%oftheenergyisprovidedbythepreheater.
Finally,theunique,innovativedesignwithdigitalcontrolpanel
offersprecision,safety,andeaseofusetomeetallreworking
requirements.
PRODUCTDESCRIPTION
6
MicroprocessorcontrolledESDsafeunit.
Utilizesinfraredheatwavetechnology.Noconventionalhotair
required.
IntegratedhandsfreeIRsolderlightgun,providingeaseofuse.
Unique, innovativemechanicaldesign formore precisesolder
ing; eliminates the displacement of surrounding components
brought by unnecessary or accidental movements during re
working.
Widely used for reworking BGAs, micro BGAs, QFPs, PLCCs,
SOICs,smallSMD,andothercircuitboardcomponents.
Embeddedpreheatingstationforwarmingbothsurfaceofthe
PCBandeliminatethepossibilityofshortcircuit.
EasytoadjustIRandpreheattemperatureswithdigitaldisplay.
Builtintemperaturesensorforstable(temperature)measurements.
Timer functionality for automating reworking tasks under pre
definedtemperaturevalues.
FUNCTIONSandFEATURES
19
CHANGINGTHEFUSE
Make sure the equi pmentisalready cooled down and isolated
fromthemainpower sourcebeforechangingthefuse.
T he f use ofthemainunitis locatedat the backof theequip
ment, righ t below the power plug connector. Change the fuse
bywithdrawingthefuseholderthenreplacethefuseitse lf.
Replaceonlywiththesametype,sizeandrating.Pleaserefer
tothetable belowforfuseratings.
CHANGINGTHEIRLAMP
SwitchOFFtheunitandu nplugthedevicefromthemainpower
source.
Withdrawthelampfromthehousing.
Fitreplacement.
Becarefultohandleonlytheoutsideedgesofthegla ssreflector.
CAUTION:Avoid touchingthebulbinsidethelamp.Thelampmay
failpremat urelyifthebulbinsidethela mpistouched.
MAINTENANCE
Location Rating Size
RearPanel
5A,220V
5x20mm
8A,110V
18
MAINTENANCE
CLEANING
Attheendofeachwor kingday,wipeanyexcessfluxand/or
solderpastefromtheequipme ntwithacleancloth.
Cleantheexposedsurfacesoftheequipment
usi ngsoftclothandantistaticfoamcleaner,periodically.
CleanthelensassemblyusingIsopropylalcohol.
Make sure that lens cloth is clean. Any solid object on the
clo th couldscratc htheglass surface andaffect functionality
ofthede vice.
CAUTION:Donotuse solventsforcleaninganypartofthe
equipmentastheymaydamagethefinish.
WARNING: All cleaning and/or maintenance
should be performed when the equipment is
sw itched off and disconnected from the main
powersource.Allowthesyste mtoc ooldownat
roomtemperaturetoavoidburnsorotherdam
agesfromhot partsofthemachine..
7
PACKAGEINCLUSION
QUANTITY PARTDESCRIPTION
1unit Aoyue720MainStation
1unit Metalpole
1unit Coolingstand
1unit Footswitch
1unit PCBholder
1unit Infrareddevice
1pc Infraredlamp
1pc Protectivelens/shield
1pc Weldinggoggles
1pc Aoyue2900solderingpen
1pc LF2Bsolderingtip
1pc LFKsolderingtip
1pc Heatresistantpad
1pc 939suctionpen
1pc ICextractor
1pc Fluxgel
1pc Powercord
1pc Aoyue720Manual
8
SPECIFICATIONS
MAINCONTROL
PowerInput: Availablein110V/220V
Frequency: 50Hz
TotalCurrent: 4.6A
MainControl: 390(l)x270(w)x92(h)mm
INFRAREDSOLDERLIGHTGUN
PowerConsumption: 200W
TemperatureRange: 100°C450°C
HeatingElement: HalogenLightSource
PREHEATER
PowerConsumption: 650W
TemperatureRange: 100°C500°C
HeatingElement: QuartzInfrared
SOLDERINGIRON
PowerConsumption: 70W
TemperatureRange: 200°C480°C
HeatingElement: CeramicHeater
OutputVoltage: 24V
17
CAREandSAFETYPRECAUTIONS
CAUTION:Improperusagecancauseinjuryandphysicaldamage.
Foryourownsafety,pleaseobservethefollowingprecautions.
Temperaturemayreachashighas500°CwhenturnedON.
Donottouchthewhiteceramicheatingelementi nsidethe
preheater.
Donotexposenakedeyetotheinfraredlight.This
cancauseseriousdam ageoftheeye.
Donotexposeskintoinfraredli ghtf oralongperiod.
Exposureforalongdurationmaydamagetheskintissue.
Securefootswitchandensurethatnothingcanrestorfallonit.
Handlewithcare
Neverdroporsharplyjolttheunit.
 Contains delicateparts such as IR lamps that may break if
theunitisdropped
Donotspillanyliquidtothesystem.
Donottampertheelectricalcontrolunitoranywiringinside
thedevice.Thismaycausesevereelectricshock.
Disconnectplugfrommainpowersourceifthedevicewillnotbe
usedforalongperiod.
 Turnoffpowerduringbreaks,ifpossible.
Allowampletimefortheequipmenttocooldownbeforecom
mencingmaintenance.
Useonlygenuinereplacementparts.Turnoffpowerandletthe
unitcooldownbeforereplacinganycomponent.
16
TECHNICALDESCRIPTION
SYSTEMHEATINGPROCESS
Theheating processoftheFocused InfraredWeldingsystem isa
combination oftheIRsolderlightgunandthepreheater.Thepre
heatercan deliver200°upto480°CtothePCB,pads,andleadsof
thecomponent.TheIRsolderlightgunfurtherincreasesthetem
peratureuntilreflowisreached.
INFRAREDLAMP
The200WattInfrared(IR)lampislocatedinsidethelamphousing
andclampedonametalrod,whichissecuredontopofthemain
unit.ThelampemitsshortwaveIRradiationatapproximately1.0
microninwavelength.
TOPHEAT
ThetopheatisproducedbytheIRsolderlightgun.Thisincreases
whilefocusingtheheatonthedesire dcomponentbeingreworked.
This also brings the solder joint temperature higher in order for
heattoreflow.
PREHEATER
The preheater provides and maintains distributed  heat (or Back
Heat) across the PCB and components prior to a ctual reworking.
ThisprotectsthePCBfromdelaminatingandthecomponentsfrom
thermal shock — brought by sudden exposure to high tempera
ture.About approximately 75%of heat energyis suppliedby the
preheaterandtheremaining25%bytheinfraredsolderlightgun.
9
OPERATINGPROCEDURES
PREPARINGTHEEQUIPMENT
1. Place the equipment on a fl at stable surface of at least one
squaremeterandaheights uitabletotheuser.
2. Attachtheprotectivelenstothefront oftheIRsolderlightgun.
3. Connectthesolderingironandfootswitchasindicatedfromthe
productillustration.
4. Connect one end of the power cord to the socket found at the
backofthemainunit.
5. Therecommendedlightingconditionshouldnotbesobri ghtsuch
thattheIRspotisstill viewablebytheuser..
6. Theelectricitysupplymustbefreefrominterferenceofotherde
vices.
SMDREWORKINGPROCEDURE
1. Assoonasallthenecessarycomponents(e.g.,IRsolderlightgun,
solderingiron,footswitch,protectivelens)havebeenattachedto
themainunit,youarereadytos tartthereworking process.
2. Plugtheequipmenttothemainpowersource.
3. TurnONtheunitusingpowerswitch (‘A’fromthe controlpanel)
locatedattherighthandsideofthefrontpa nel.
10
4. WithbuttonsC1,C4,C7,andC10disabled(OFF),thedisplaypan
elswillshowthefollowing.
5. ThePCB/componenttoberepairedshouldbeplacedontopofthe
preheatingcomponent.UsethebeamstoholdthePCBandadjust
the screws to secure the placement. Make sure that the affected
component is placed at an appropriate distance, perpendicular to
theIR solderlight gun.Thiswill keeptheIR light focusedonly to
thecomponentconcerned.Move the temperaturesensor tip near
thecomponentfortemperaturereading.
OPERATINGPROCEDURES
15
USINGTHESOLDERINGIRON
1. WiththeunitswitchedONandthesolderingplugconnectedto the
equipmentviaterminalEfromthecontrolpanel,activatesoldering
bypushingbuttonC10.
2. AdjustthesolderingirontemperatureusingbuttonsC11andC12.
3. Wai tforafewsecondswhilethesystem isadjustingtheso ldering
irontemperaturetothedesiredvalue.Youwillheara“beep”ora
highpitchsoundwhenthetemperatureisreached.
4. Whenworkisfinished,deactivatesolderingswitch.
5. T urnOFFtheunit.
6. U nplugthedevicefromthemainpowersource.
NOTE: The soldering iron temperature is configurable from 200̊ to
480̊̊̊̊C,with350̊̊̊̊Casthedefault.
USINGTHEFOOTSWITCH
1. Before reworking, make sure the unit is switched ON, the foot
switchconnectedtothedeviceviafootswitch plug,Ffromthecon
trolpanel,the PCBisproperlyplacedontopoftheequipment,and
thepreheattemperatureisreached.
2. Set the temperature by temporarily activating IR welding switch,
C1, and increase or decrease the desired reworking temperature
usingbuttonsC2andC3.
3. Oncetemperaturei sset,deactivateC1.
4. Steponthefootswitchtostartreworking.
5. Whenfinished,turnoffthedevice.
6. Unplugtheunitfromthemainpowersource.
OPERATINGPROCEDURES
14
OPERATINGPROCEDURES
B.AutomatedweldingusingtheFOOTSWITCH
1. Before reworking, make sure the unit is ON, the footswitch con
nected to the device via footswitch plug, F, the PCB is properly
placedon topof the equipment, andthe preheattemperatureis
reached.
2. Set the temperature by temporarily activating IR welding switch,
C1, and increase or decrease the desired reworking temperature
usingbuttonsC2andC3.
3. Oncetemperaturei sset,deactivateC1.
4. Set thereworking timeby selectingbuttons C5andC6 fromthe
controlpanel.Notethatthetimeisinsecondsunit.
5. Activateautomateswitch,C4.
6. T he countdown willstart when you stepon the foot switch. Re
leasingthefootswitch,ontheotherhand,willholdthecount.This
willresumewhenyousteponthefootswitchagain.
NOTE: Timeisconfigurablefrom20to9999secondswitha20second
increment.
USINGTHERESETBUTTON
IMPORTANT: BecarefulinusingtheRESETbuttonasthiswillremove
all previouslydefinedconfigurations.Thiswill alsorestorethesystem
defaultvaluesasfollows:
IRsolderlightguntemperature: 90̊C
Automatetime: 300sec.
Preheattemperature: 200̊C
Solderingirontemperature: 350̊C
11
6. StartthepreheaterbyenablingorturningONbuttonC7fromthe
panel. The preheater will gradually increase the temperature to
200̊C,whichisthedefaulttemperaturevalue.Youmayfurtherin
creaseordecreasethetemperaturebypushingbuttonsC8andC9.
NOTE: If the preheating temperature display panel, D3, shows
“OFFC”duringthecourseofpreheating,pushtheRESETbutton,
B,toshowagaintheactualpreheattemperaturevalue.
7. Oncethedesiredpreheattemperatureisreached,youmaystart
theIR solderlight gun.Push buttonC1from the control panel to
activate this. The infraredtemperature display, D1, should show
somethinglikethefigurebelow.
The upper halfofthedis
playindicatesthedefaultoutputvalueoftheIRsolderlightgun,
whichis90̊C.Thelowerhalfindicatestheactualtemperaturede
livered to the component. You will notice that this val ue will
change frequently and will fluctuate a little above or below the
definedtemperaturelevel.UsebuttonsC2andC3toincreaseor
OPERATINGPROCEDURES
12
After the temperature has been set, the IR solderlight gun will
strikealightbeamonthecomponentforabout3secondsand will
fadeafterwards.Thiswillrecurperpetuallyevery15secondsuntil
any of the foll owing conditions is met: (1) the infrared welding
switch is turned OFF by the user, OR (2) once the predefined
automateweldingtimehaselapsed(see“USINGTHEAUTOMATED
WELDINGFUNCTION”),OR(3)whenthefootswitchhasbeende
activated(see“USI NGTHEFOOTSWITCH”).
8. LeavetheIRsolderlightgunworkinguntilthecomponentiscom
pletelydesolderedorwhenreworkingisdone.
9. Deactivate the infrared welding switch, C1, when rework is com
pleted.Notethatthesystemwillwaitforthetemperaturetodrop
to90̊CbeforeitcompletelyturnsOFF.Youwillalsonoticeaslight
change on the display panel like below while the temperature is
graduallydecreasing(i.e.,“Exxx”insteadof“bxxx”).
10. Deactivate the preheating button, C7, to cool down the pre
heatingelement.Thepanelwillthenshowtheinitialdisplayasin
itemnumber4onceeverythingissettled.
11. SwitchOFFtheequipmentusingbuttonAfromthecontrolpanel.
12. Unplugtheequipmentfromthemainpowersource.
OPERATINGPROCEDURES
13
REMINDERS:
Always place the PCB on board supports or beams, with
thecomponentpositionedatthecenterofthepreheater.
Alwaysapplyfluxtojointsbeforereflow.
Before r eplacing a component, ch eck if there is enough solder
onthe padstosol dernewcomponent.
When replacing a component, make sure the new component
doesnothaveanybentleads.
USINGTHEAUTOMATEDWELDINGFUNCTION
IMPORTANT: Theautomatedweldingfunctionwill ONLYworkifthe
infraredweldingswitchisONORwhenthefootswitchisactivated.
A. AutomatedweldingusingINFRAREDWELDINGswitch
1. Beforereworking,makesuretheunitisON,thePCBis properly
placedontopoftheequipment,andthepreheattemperatureis
reached.
2. SetthereworkingtimebyselectingbuttonsC5andC6fromthe
controlpanel.Notethatthetimeisinsecondsunit.
3. ActivatetheIRweldingtemperatureusingbutton,C1,andadjust
thetemperaturebyselectingbuttonsC2andC3.
4. Activateautomateswitch,C4.
5. TheIRsolderlightgunwillworkuntilthetimehaselapsed.
NOTE:
Timeis configurablefrom 20 to9999seconds witha 20second
increment.
ThecountdownwillpauseifC1buttonisdisabledwhileC4isON.
ItwillresumeonceC1isenabledagain.
OPERATINGPROCEDURES
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12

aoyue Int720 User manual

Category
Soldering irons
Type
User manual

Aoyue Int720 is a focused infrared welding system that combines soldering/desoldering features and infrared (IR) technology in one sophisticated package. Designed for reworking on double-sided and diverse technology printed circuit boards (PCB), the system utilizes infrared heat wave technology, eliminating the need for conventional hot air. It features an integrated hands-free IR solder light gun for ease of use and a unique mechanical design for precise soldering, preventing the displacement of surrounding components.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI