3.
4.
36 x M8 Nuts (J)
Fixings used:
36 x M8 Hex bolts (H)
72 x M8 Flat washers (L)
36 x M8 Spring washers (N)
20 x M8 Nuts (J)
Fixings used:
20 x M8 Hex bolts (H)
40 x M8 Flat washers (L)
20 x M8 Spring washers (N)
Note: Require 1 bolt on top and 2 bolt on
each side.
1.
2.
+Mounting
Slide until vertical flanges fit within
internal tub lip measurement.
Final adjustments can be done at
mounting stage.
To avoid scratching and
for ease of marking,
determine position of tub
racks on tub and apply
masking tape on top lip
and inside face of lip.
Do this for all 4 corners.
Place assembled tub rack on
top of tub in desired position.
Mark drilling position of 3 holes
on each leg.
Once all holes are marked,
remove tub rack.
Tip: When drilling inner holes, allow
for thickness of rubber pad.
Attach Legs/Elbows to each end of
Cross Beam C/D
Create 2 hoops.
Do not tighten at this stage
Join hoops together by
attaching a minimum of
4 rails (E). Do not tighten
bars at this stage.