Classic Exhibits VK-1366 Setup Instructions

  • Hello! I am an AI chatbot trained to assist you with the Classic Exhibits VK-1366 Setup Instructions. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
© 2023
Order #XXXXX
Locked layer contains
placeholder marks.
Plan View
10’
10’
VK-1366 10’ x 10’ Exhibit
If you would like to tell us about your experience with your setup instructions please email us at [email protected]
SETUP INSTRUCTIONS
© 2023
Order #XXXXX
Locked layer contains
placeholder marks.
= 1 sq foot
Plan View
© 2023
Order #XXXXX
DO NOT USE POWER TOOLS
ALL CONNECTIONS MUST
BE TIGHTLY SECURED
Part Identification - Numbering
Spline Connection Base Plate & Extrusion Connection
General Setup Instructions
- Read entire setup instruction manual prior to
unpacking parts and pieces.
- The setup instructions are created specifically
for this configuration.
- Setup instructions are laid out sequentially in
steps, including exploded views with detailed
explanation for assembly.
WARNING
Cleaning & Packing
- For Cleaning Metal, Plex, & Laminate Parts:
Use a MILD NON-ABRASIVE cleanser and
soft cloth/paper towel to clean all surfaces.
- Keep exhibit components away from heat
and prolonged sun exposure.
Heat and UV exposure will warp and
fade components.
- Retain all provided Packing Materials.
All provided packing materials are for
ease of repacking & component protection.
Disassembly
- For loss prevention, tighten all set screws
and locks during disassembly.
7A
Hex Tool - Essential for Assembly
Extrusion & Lock Connection Engaged Lock
LADDERS OR LIFTS
MAY BE REQUIRED
General Information
© 2023
Order #XXXXX
Straight Connection
All knobs must be tightened securely to ensure a proper connection.
All knobs must be tightened securely to ensure a proper connection.
Adjust connectors if necessary to
prevent gaps in connection.
Upper Horizontal Extrusion
Lower Horizontal Extrusion
Straight Connector
Straight Connector
Corner
Connectors Corner
Connectors
Corner
Connectors Corner
Connectors
COMPLETED ASSEMBLY
3) Tighten all knobs to secure connection.
Slide verticals over
lower connectors.
Then slide upper
connectors into
groove of verticals.
Tighten all knobs.
When assembling frame, first attach all straight
connectors, then attach corner connectors.
1) Place extrusions end-to-end.
2) Loosen all knobs, then slide straight
connectors across the seam of extrusions.
Disassembly
1) Loosen all knobs.
2) Slide connectors off of one extrusion.
3) Tighten knobs to prevent loss during
packing & shipping.
CEI110 Profile
Slide both connectors across seam of extrusions.
Tighten all knobs.
Corner Connection
3) Tighten all knobs to secure connection.
Disassembly
1) Loosen knobs on vertical extrusions.
2) Slide the vertical extrusions off of
corner connectors on lower and upper
horizontal extrusions.
1) Loosen knobs, then slide vertical extrusions onto
corner connectors of lower horizontal extrusion.
2) Slide corner connectors of upper horizontal
extrusion into grooves of vertical extrusions.
Keep straight connectors in groove of
extrusion. Do not remove connectors
during disassembly.
CEI110 Frame Assembly
© 2023
Order #XXXXX
Graphic Removal
To remove the graphic
the frame, locate the fabric
pull tab. Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
It is important to first insert
graphic into each alternate
corner then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
from
SEG Installation
© 2023
Crate 1 of 1
Order #XXXXX
Locked layer contains
placeholder marks.
CRATE PACKING
Crate Packing
© 2023
Step 1 of 8
Order #XXXXX
Locked layer contains
placeholder marks.
When assembled
1
2
3
4
Item
1
2
3
4
Qty.
1
1
1
1
Description
90.5”h CEI110 Vertical Extrusion
90.5”h CEI110 Vertical Extrusion
51”w CEI110 Horizontal Extrusion
51”w CEI110 Horizontal Extrusion
Steps:
Refer to the CEI110 Frame Assembly general information page.
1) Assemble verticals [1,2] between horizontals [3,4].
2) Connect power cords to Supernova lights as shown.
FRONT VIEW
ELEVATION VIEW
*
*
*
*
Transformers
Assemble frame flat on ground.
CEI-110 Corner Connection
*1. Slide extrusion onto
corner connectors.
2. Tighten all knobs to
secure connection.
Power
Break
Power
Break
+
-
Power
Female
Transformer
144W / 6 Amp / 24V
++
--
Lights Male
Light to Light Attachment
Maximum of 7 lights per chain / 12 lights per Transformer
Light to Transformer Attachment
Recessed Wall Lightbox Assembly
© 2023
Step 2 of 8
Order #XXXXX
Locked layer contains
placeholder marks.
Item
A
B
C
D
Qty.
1
1
1
1
Description
2.5”w x 95.5”h x 20”d Side Panel
2.5”w x 95.5”h x 20”d Side Panel
51”w x 2.5”h x 20”d Bottom Panel
51”w x 2.5”h x 20”d Top Panel
Steps:
1) Connect bottom panel [C] to side panels [A,B] using roto cam locks.
See Roto Cam Lock Connection detail.
2) Attach top panel [D] to side panels [A,B] using Roto Cam Locks.
3) Connect lightbox assembly [1/2/3/4] to panels [A/B/C/D] using Bolt to T-Nut Connection.
4) Attach SEG graphic & blocker to lightbox. Refer to the SEG Installation
general information page.
C
1
2
3
4
A
B
D
FRONT VIEW
Roto Cam Lock Connection
*
Place hex tool in hole on side of panel. Rotate
to activate lock & secure panels together.
Hole
Lock
Hex Key Tool
Step 1
Hex Key Tool
Lock
Step 2
*Bolt to T-Nut
Connection
T-nut
bolt
When assembled
S
E
G
Gr
ap
h
ic
SE
G
Blo
c
k
e
r
Recessed Wall Assembly
© 2023
Step 3 of 8
Order #XXXXX
Locked layer contains
placeholder marks.
When assembled
5
6
7
8
Item
5
6
7
8
Qty.
1
1
1
1
Description
93.689”h CEI110 Vertical Extrusion
93.689”h CEI110 Vertical Extrusion
50.417”w CEI110 Horizontal Extrusion
50.417”w CEI110 Horizontal Extrusion
Steps:
Refer to the CEI110 Frame Assembly general information page.
1) Assemble verticals [5,6] between horizontals [7,8].
2) Connect power cords to Supernova lights as shown.
FRONT VIEW
ELEVATION VIEW
*
*
*
*
Transformers
Assemble frame flat on ground.
CEI-110 Corner Connection
*1. Slide extrusion onto
corner connectors.
2. Tighten all knobs to
secure connection.
Power
Break
Power
Break
+
-
Power
Female
Transformer
144W / 6 Amp / 24V
++
--
Lights Male
Light to Light Attachment
Maximum of 7 lights per chain / 12 lights per Transformer
Light to Transformer Attachment
Backwall Lightbox Assembly
© 2023
Step 4 of 8
Order #XXXXX
Locked layer contains
placeholder marks.
Steps:
1) Connect vertical [5] of frame assembly to Panel [B],
using Bolt to T-Nut Connection.
2) Apply SEG graphic to front of assembled lightbox.
Refer to the SEG Installation general information page.
*Bolt to T-Nut
Connection
T-nut
bolt
B
*
*
*
When assembled
5
S
E
G Graphic
Backwall Lightbox Attachment
© 2023
Step 5 of 8
Order #XXXXX
Locked layer contains
placeholder marks.
*
*
*
*
Item
9
10
E
Qty.
1
1
1
Description
91.878”h Q918 Vertical Extrusion
91.878”h Q918 Vertical Extrusion
44.835”w x 18”d x 109”h Storage Cabinet
Steps:
1) Attach vertical [9] to lightbox vertical [6] using bolts & V4 connectors.
See Lightbox Attachment detail.
2) Apply SEG blocker to back of lightbox. Refer to the SEG Installation
general information page.
3) Connect Storage Cabinet [E] to verticals [9,10] using bolts &
V4 connectors. See Counter Attachment detail.
9
10
6
E
*
*
*
*
*
*
*
S
EG
Blo
cker
V4
Connector
set
screw
bolt Q918
CEI-110
Lightbox Attachment
*
Slide V4 connector into groove of Q918
extrusion as shown; secure with set screw.
Attach CEI-110 extrusion to Q918 by
securing bolt to hole of V4 connector.
V4
Connectors
set
screws
bolts
Q918
Counter
Counter Attachment
*
Slide V4 connectors into groove of Q918
extrusion as shown; secure with set screws.
Attach Counter to Q918 by securing bolts
to hole of V4 connectors.
Product Display Wall Assembly
© 2023
Step 6 of 8
Order #XXXXX
Locked layer contains
placeholder marks.
Item
11
12,13
F
Qty.
1
2,2
2
Description
52”w S91 Horizontal Extrusion
44.835”w Z41 Horizontal Extrusion
44.874”w x 18”d Shelf
Steps:
1) Attach horizontals [12,13] on underside of Shelves [F]
to verticals [9,10] as shown.
2) Connect horizontal [11] to top of verticals [9,10].
When assembled
11
9
10
12
13
12
13
F
F
Horizontals [12,13] stay
permanently attached
to Shelves [F].
UNDERSIDE VIEW
13
12
locks
locks
Shelf
Product Display Wall Attachment
© 2023
Step 7 of 8
Order #XXXXX
Locked layer contains
placeholder marks.
Item
14
15
16
17
--
Qty.
1
1
1
1
1
Description
30”w S91 Horizontal Extrusion
47”w S91 Horizontal Extrusion
64”w S91 Horizontal Extrusion
71.797”w S91 Horizontal Extrusion
Custom Bracket
Completed Assembly
Steps:
1) Attach extrusions [14,15,16] to top of horizontals [8] & [11]
using bolts & V4 connectors. See Canopy Attachment detail.
2) Connect extrusion [17] to top of horizontal [11], and attach
to top of wall panel [B] using custom bracket.
See Bracket Attachment detail.
Canopy Attachment
*
Slide V4 connector into groove extrusion
& secure with set screw.
Attach canopy extrusion
to V4 connector
using bolt.
V4
Connector
set
screw
bolt
Canopy
Bracket Attachment
*
Attach Bracket to canopy extrusion using
V4 connector.
Attach Bracket
to top of Wall Panel
using bolt to T-nut
connection.
T-nuts
bolts
Custom
Bracket
V4
Connectors
*****
***
8
B11
14
15
16
17
Custom
Bracket
Canopy Assembly
© 2023
Step 8 of 8
Order #XXXXX
Locked layer contains
placeholder marks.
BACK VIEW
FRONT VIEW
Transformer
When assembled
SEG
G
r
ap
h
i
c
+
-
Power
Female
Transformer
96W / 4 Amp / 24V
++
--
Lights Male
Light to Light Attachment
Maximum of 7 lights per chain / 7 lights per Transformer
Light to Transformer Attachment
Steps:
1) Connect power cords to Supernova lights as shown.
2) Apply SEG graphic to front of lightbox. Refer to the SEG Installation
general information page.
MOD-1726 Counter
/