  • Hello! I am an AI chatbot trained to assist you with the TrafficMASTER 360731-22430 User manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Tools & Materials
Laminate installation kit (including spacers, tapping
block, and pull bar)
• Premiumgradelaminateooringunderlayment(for
 ooringwithoutanattachedpad).
• Hammer
• Tableorhandsaw
• Carbide-tippedcircularsawblades
• Vacuum
Tape measure
Duct tape
• WoodGlue(wheremodifyingtheproleisnecessary)
Sandpaper
Level
• Age-resistant,non-permeablepolyethylenevaporbarrier
 (0.006inch)-forinstallationsoverconcrete
Moisture Meter
Felt Furniture Pads
Gloves
• Safetyglasses
Dust Mask or Respirator
Caution: usesafetyglasses,gloves,andadustmaskor
respiratorwhencuttingthisproduct.Duringthecuttingprocess,
laminatemaycreatewooddust;installinawell-ventilatedarea.
General Requirements for all Subooring
Substratesshouldbestructurallysoundandimmobile.Before
installingooring,ensurethesuboorisleveledwithin3/16inchin
10feet.Irregularitiesinthesuboorshouldbesmoothedusinga
levelingcompound.
Wood
• Suspendedwoodsuboorsshouldhaveaminimumof18
 inchesofwell-ventilatedairspaceabovetheground.
• Themoisturecontentofthewoodsuboorshouldnot
 exceed12%.
Concrete
• Newconcretesubooringshouldbecuredforatleast90days
 priortoinstallation.
• Amoisturetestshouldbeperformedonthesuboor.Using
acalciumchloridetest,valuesformoisturevaporshallbe<5 
lbs./1,000sq.ft./24hoursperASTM1869.
• Youmustinstalla0.006inchage-resistant,non-permeable
 polyethylenevaporbarrierovertheconcretesuboor.
 Tapeseamswithanadhesivetape.Thevaporbarriershould
 beinstalledupthewallby1inch.
Carpeting
• Removeallcarpetingandpaddingpriortoinstallation.
Vinyl / Sheet Vinyl
• Ifexistingooringhasunderlaymentitmustberemoved.
• Vinylmustbewellsecured,level,andingoodcondition.
• Ifsuboorunderthevinylisconcreteyoumustinstalla0.006
 inchage-resistant,non-permeablepolyethylenevaporbarrier
 overtheoor.Tapeseamswithanadhesivetape.Thevapor
 barriershouldbeinstalledupthewallby1inch.
Radiant Heating Systems
• Laminateooringcanbeinstalledonunder-oorradiant
 heatingsystemsiftheheatingelementisinstalledintowood
 orconcretesuboors.
• Lowerheatingsystemto60ºFfor1weekbeforeinstallation.
• Afterinstallation,slowlyincreasethetemperaturein
 incrementsof10ºFperday.
• Surfacetemperaturemustnotexceed85ºF.
• Followinstallationinstructionsforwoodorconcreteas
 outlinedabove.
Room & Material Preparation
• Removeallexistingmoulding.
• Allowlaminateooringtoacclimatetoroomtemperature
 (between60ºF-80ºF)byplacingthepackagedooringatin
 theroomforaminimumof48hourspriortoinstallation.Do
 notremovetheplasticwrapping. [1]
• Flooringshouldbeinstalledandmaintainedinaclimate
controlledenvironmentwithambienttemperaturebetween 
 60ºF-80ºFandarelativehumidityof35%-70%.
• Checkdoorclearancesandmakenecessaryadjustments
 beforelayingtheooring.Doormouldings(jambs)shouldbe
 undercuttoaccommodatethethicknessoftheooringaswell
 astheunderlayment(whetherpre-attachedorinstalled
 separately). [2]
• Forproductwithoutunderlayment;installpremiumgrade
 laminateooringunderlaymentperthemanufacturer’s
 instructions.DONOTinstallmorethanonelayerof
 underlayment.Doingsowillvoidthewarranty.
Important Information Before Starting
• Ifroomhaselectricbaseboardheaters,leaveaminimumof
 1/2inchbetweenthesurfaceoftheooringandthebottom
 oftheheaters,allowingheattocirculate.
• UseT-mouldingsforroomswiderorlongerthan40feetand
 openingslessthan4feet.
• Determinewhichdirectiontolaytheplanks.Ifinstallingin 
 narrowhallwaysorsmallrooms,theareawillappearlargerif
 ooringislaidparalleltothelongestwall.
• Inspecteachplankfordefectspriortoinstallation.Donot
 installdefectiveplanks;installationofdefectiveplanksimplies
acceptanceofmaterial.Workoutofseveralcartonsatthe 
 sametimetoensureamixtureofcolorandshade.
• A3/8”spacermustbeusedalonganyverticalsurface.When
 theprojectiscompletedthesespacerswillberemoved
 leavinga3/8”expansiongap.Thisgapisnecessarybecause
 laminateexpandsandcontractswithtemperatureand
 humiditychanges.Thegapprovidedwillpreventyourooring
 frombeingdamagedduringthosechanges.
• Toprovideaushedge,anyplankedgethatwouldcontacta
 spacercanhaveitsprolecutoff.
• Theminimumlengthofaplanktoeitherbeginorendarowis
 8”.Theminimumjointoffsetbetweenrowsis12”. [3]
• Whenassemblingtheplanks,especiallyintherstrow,you
 mustmakesurethatthepiecesarelockedinsquareandush.
 Thiswillmakesubsequentrowassemblyeasier.
1
Laminate Flooring Installation Guide
Installation Procedure
1. Measurethewidthandlengthoftheroom.Determinethe
 widthofyourstartingrowsothattherstandlastrowsinthe
 roomarethesameuponcompletion.
2. Flooringshouldbelaidfromlefttorightwiththelongside
 groovefacingyou.
3. Usingthepredeterminedmeasurementsfromstep1,cutthe
 rstplank [4] andplaceitagainstthespacersalongthewall.
[5]Intheeventofanunevenwall,tracethecontourontothe
 plankandcut.
4. Prepareasecondplankandplaceit’sshortsidetongueon
 theoornear(2-3mm)theshortsidegrooveofplankone.Tap
 theshortsidegrooveofplanktwowiththetappingblockand
 hammerinthedirectionofplankonetoassemblethejoint.[6]
 Continuethisprocessuntiltheendoftherow.
5. Attheendoftherowuseapullbarinplaceofatapping 
blocktoclosethegapbetweenthetwoplankstocomplete 
 therow[7]whileleavingtheproperexpansiongap.[8]
6. Begininstallingthesecondrow,fromlefttoright,byangling
theplanktoallowthetongueonthelongsidetoslideinto 
 thegrooveoftheplankinrowone.Maintaininwardpressure
 (towardthepreviousrow)whilegentlymovingtheplankup
anddownasyouslowlypushtheplanktotheoor.Donot 
 forcetheplanktotheoorifthetongueisonlypartially
 insertedintothegroove.[9, 10, 11]
7. Installthenextplankbyplacingitnear(2-3mm)theprevious
 plankintherowandagainanglethelongsidetonguetoslide
 intothegrooveofthepreviousrow.[12]Slowlypushthe 
 piecetotheoor.
8. Oncetheplankislyingatgentlytaptheplanksshortside 
 groovetowardsthepreviousplank,toassemblethejointand
thentaptowardsthepreviousrowtoensurejointislocked. 
[13]
9. Continuelayingtheoorfromlefttorightcompletingrows.
[14]
10.Trimtheplankstobeusedinthenalrowtothedesired
widthwhiletakingintoconsiderationthenecessarygapof 
 3/8”neededbetweentheplanksandthewall. [15]Installthe
 nalrowasdescribedintheprevioussteps.
11. Removeallspacersandinstallappropriatetrimand/or 
 moulding.
Installing Around Moldings and Door Jambs
Inchallengingareassuchasdoormoldingswhereplankscan’t
beinstalledatanangleitmaybenecessarytomodifythejoint.
Beginbyremovingaportionofthegroovefromtheplanksbeing
ttedtointhepreviousrowbyeitherplaningorsanding.Oncethe
materialisremovedapplyasmallamountofwoodgluetothetop
ofthesubsequentplankstongueandinstallitbyslidingitonthe
oorintoplace.Wipeupexcesslaminategluewithadampcloth
andwarmwater.
Care and Maintenance Do & Do Nots
Do Do Not
Dovacuumusingasoft
bristleattachment
Donotusevacuumwith
beater bar
Douseahumidier,dehumidier,
orairconditionertohelpmaintain
temperatureandhumiditylevels
Donotletyourambienttemperatureinthe
roomfalloutsidetherangeof60°F-80°F
andarelativehumidityof35%-70%
Dousecleaningsolutionsspecially
formulatedforlaminateooring
Donotuseoilsoaps,waxbased
cleaningsolutions,orotherchemicals
thathaveabrasiveproperties
Douseaslightlydampclothorpaper
toweltocleanupspillsimmediately
Donotwetmoporusea
steam mop
Docleanupspillsimmediately Donotleavestandingliquidsofany
kind
Doapplycleaningsolutiondirectlyto
clothormop
Donotsprayliquidsdirectly
onoor
Douseprotectivematsunderchairs
withcastors.Placefeltoorprotectors
underfurniturelegs
Donottrytoslideheavyobjects
acrossoor
Douseentrymats Donottrysealingyouroorwithany
aftermarketoorsealer
Minor Repair Instructions
Intheeventthataccidentaldamageoccurs,minorscratchesor
dentscanberepairedusingaFlooringTouchuporColor-llKit.
Laminate Board Replacement Repairs
Laminatemaybeassembledanddisassembledseveraltimes.
Intheeventaplankisdamagedenoughthatitmustbereplaced
youcandisabletheooringbackthepointofthedamaged
plank.Simplyreplacethedamagedplankwiththenewoneand
reassembleyouroor.
2
60-80° F
16-27° C 24
5
3/8”
3/8”
3
>12”
>8”
678
910 11 12
13
14
Minimumstarting/endinglengthis8”
15
Groove
/Rainure
/
Ranura
(Short side / Côté court / Deslizador corto)
Tongue
(Long side)
Languette
(Côté long)
Lengüeta
(Deslizador largo)
Groove
(Long side)
Rainure
(Côté long)
Ranura
(Deslizador largo)
(Short side / Côté court / Deslizador corto)
Tongue / Languette / Lengüeta
Figure A
3
/