Reznor TR Operating instructions

Type
Operating instructions

This manual is also suitable for

Reznor BE, a powerful unit heater, offers efficient and reliable heating solutions for various commercial and industrial applications. Engineered for durability, it features a heavy-duty steel construction, ensuring longevity in demanding environments. The unit heater's advanced design allows for precise temperature control, optimizing energy usage while maintaining a comfortable atmosphere. With its versatility, Reznor BE is ideal for heating warehouses, factories, workshops, and other large spaces, providing a warm and productive work environment.

Reznor BE, a powerful unit heater, offers efficient and reliable heating solutions for various commercial and industrial applications. Engineered for durability, it features a heavy-duty steel construction, ensuring longevity in demanding environments. The unit heater's advanced design allows for precise temperature control, optimizing energy usage while maintaining a comfortable atmosphere. With its versatility, Reznor BE is ideal for heating warehouses, factories, workshops, and other large spaces, providing a warm and productive work environment.

Form CP-FE/BE/TR-PSK (11-17), D303204, Page 1
Replacement Pressure Switch Kits
for all Model TR Tubular Infrared Heaters and
Model FE and BE Unit Heaters manufactured prior to 1/1994
Kits and
Components
Form CP-FE/BE/TR-PSK (11-17)
Obsoletes Form CP-FE/BE/TR-PSK (4-16)
DANGER:
This replacement pressure switch kit is to be installed by a qualied agency in accordance
with these instructions and in compliance with all codes and requirements of authorities
having jurisdiction. Failure to follow instructions could result in death, serious injury, and/
or property damage. The qualied agency performing this work assumes responsibility for
this installation.
Installation Instructions
Each kit includes a new switch and a new piece of tubing.
Replacement Kit P/N 196653
Qty P/N Description
1 195316 Pressure Switch, #IS20202-4005
1 196656 Silicone Tubing, 5-1/4” long
Replacement Kit P/N 196654
Qty P/N Description
1 195317 Pressure Switch, #IS20202-4004
1 196656 Silicone Tubing, 5-1/4” long
Applications
Use the pressure switch kits as replacements in the following applications:
Applies to all TR units by Size & Elevation 50 75 100 125 150 175 200
0-2000ft / 0-610M Standard Unit 196653
2001-4000ft / 611-1219M
with High Elevation
Option AB2 or AB3
196653 196654
4001-6000ft / 1220-1829M
with High Elevation
Option AB4 or AB5
196653 196654
6001-8000ft / 1830-2438M
with High Elevation
Option AB6 or AB7
196654 196653 196654 N/A
Applies to all Sizes of FE & BE units manufactured
before 1/1994 (Serial No. Code ATA) by Elevation
0-4000ft / 0-1220M Standard Unit & with High Elevation Option AB2 or AB3 196653
Over 4000ft / 1220M with High Elevation Option AB4, AB5, AB6, AB7, or AB8 196654
1. Turn off the gas and disconnect the electrical supply to
the heater.
2. Open the access panel door.
3. Change the Pressure Switch
Locate the pressure switch. Mark and disconnect the
wires. Carefully slide both pieces of tubing from the
switch. Remove the pressure switch.
Using the same screws, attach the new pressure
switch in the same location.
4. Attach the Tubing.
Models FE and BE - Re-use both pieces of
disconnected tubing. Attach the tubing from the
venter housing to the “-” (low) pressure port toward
the bottom of the switch. Attach the tubing from the
barb on the burner/control box wall to the “+” (high)
pressure port toward the top of the switch. Push the
tubing on so that it is attached securely.
NOTE: The piece of tubing in the kit will not be used.
Model TR - Re-use the longer piece of disconnected
tubing. Attach it to the “-” (low) pressure port toward
the bottom of the switch. Push the tubing on so that it
is attached securely.
Replace the shorter piece of tubing with the new piece
in the kit. Attach one end securely to the barb on the
burner/control box wall and the other to the “+” (high)
pressure port toward the top of the switch.
5. Reconnect the wiring.
6. Close the access panel.
Turn on the electric and the gas.
Operate the unit and check for proper operation.
Pressure
Switch
Specications & illustrations subject to change without notice of incurring obligations.
© Nortek Global HVAC, LLC 2017. All rights reserved.
All marks are the property of their respective organizations.
O’Fallon, MO I Printed in U.S.A. (2017)
Form CP-FE/BE/TR-PSK (11-17) D303204 (NEW)
  • Page 1 1

Reznor TR Operating instructions

Type
Operating instructions
This manual is also suitable for

Reznor BE, a powerful unit heater, offers efficient and reliable heating solutions for various commercial and industrial applications. Engineered for durability, it features a heavy-duty steel construction, ensuring longevity in demanding environments. The unit heater's advanced design allows for precise temperature control, optimizing energy usage while maintaining a comfortable atmosphere. With its versatility, Reznor BE is ideal for heating warehouses, factories, workshops, and other large spaces, providing a warm and productive work environment.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI