Dell IAP-134 Installation guide

Type
Installation guide

This manual is also suitable for

AP-130-MNT-C2
Installation Guide
0511077-02 | August 2013 1
The AP-130-MNT-C2 ceiling rail adapter provides additional ceiling mounting options for the 130 Series
wireless access point (AP). The ceiling mounting kit includes the following items:
Adapter for Open (Silhouette) ceiling tile rails. The wider of the two adapters.
Adapter for Flanged (Interlude) ceiling tile rails. The narrower of the two adapters.
For complete information about selecting the location and setting up the AP, see the 130 Series Access
Point Installation Guide.
Installation
To attach either ceiling rail adapter to the AP:
1. Place the adapter against the back of the AP with the adapter at an angle of approximately 30 degrees to
the tabs (see Figure 1).
2. Twist the adapter clockwise until it snaps into place in the tabs (see Figure 1).
Figure 1 Adapter Installation
After the adapter is attached to the AP, mount the AP on a ceiling tile rail as follows:
1. Align the AP with a ceiling tile rail, placing the AP so that the mounting tabs on the adapter are at an
angle of approximately 30 degrees to the ceiling tile rail (see Figure 2 or Figure 3).
Make sure that slack in connected cables is above the ceiling tiles.
2. Pushing toward the ceiling tile, rotate the AP clockwise until it clicks into place on the ceiling tile rail
(see Figure 2 or Figure 3).
AP-130_011
2 AP-130-MNT-C2 | Installation Guide
Figure 2 Open Rail Installation
Figure 3 Flanged Rail Installation
AP-130_012
AP-130_013
  • Page 1 1
  • Page 2 2

Dell IAP-134 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI