ALEKO CPM12X23WH-HD User manual

Type
User manual
BUILDING DIMENSIONS
ITEM:CH3.66x7.5
Dimensions:W3.66x D7.5x H2.4 m
Storage Area:27.45m2 .
Overallsize:W3.72 x D 7.57 m
Recommended Floor:W3.82 x D7.67m
CAUTION:SOME PARTS HAVE SHARP
EDGES.CARE MUST BE TAKEN WHEN HANDING
THE VARIOUS PIECES TO AVOID A MISHAP.FOR
SAFETY SAKE,PLEASE READ SAFETY
INFORMATION PROVIDED IN THIS MANUAL
BEFORE BEGINNING CONSTRUCTION.WEAR
GLOVES WHEN HANDING METAL PARTS.
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY
ltem:CH3.66x7.5
1/13
Owner's Manual:
Before beginning construction,check local building codes regarding footings,location and other
requirements.Study and understand this owner's manual.Important information and helpful tips
will make your construction easier and more enjoyable.
Assembly Instructions:
Instructions are supplied in this manual and contain all appropriate information for your
building model.Review all instructions before you begin,and during assembly,follow the step
sequence carefully for correct results.
Parts and Parts List:
Check to be sure that you have all the necessary parts,you've your building.
.The first few steps show how to join related parts to make larger sub assemblieswhich
will be sused later.
.Familiarize yourself with the hardware and fasteners for easier use during construction.
These are packaged within the carton.Note that extra fasteners have been supplied for your
convenience.
Watch the Weather:
Be sure the day you select to install your building is dry and calm.
Do not attempt to assemble your building on a windy day.Be careful on wet or muddy ground.
Teamwork:
Whenever possible,two or more people should work together to assemble your building.
Oen person can position parts or panels while the other is able to handle the fasteners
and the tools.
Tools and Materials:
These are some basic tools and materials you will need for the construction of your building.
Decide which method of anchoring and the type of foundation you wish to use in order to form
a complete list of the materials you will need.
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY 2/13
Choose a right ground
Make sure the ground slopes slightly away from the building on all sides. This will keep water moving away
from the building and prevent moisture from remaining in contact with your metal building continuously.
Perform routine checks
Check your metal building at least twice a year to assess for any damage caused by harsh weather,
an accidental bump from a vehicle, or other causes. Also, check immediately following severe storms for
dents, small holes, missing screws and bolts,or other damage that could compromise steel panels
and frame.
Keep your building clean
It’s important to routinely clean your steel building (once a year or more often as needed) to prevent fungi
or other materials from building up on your structure. To clean your metal building, simply use a mix of
ammonia or a gentle household cleaning product with warm water to remove the grime,grease or mud.
You can do this by hand with a soft brush or use a power washer on a low pressure setting. For stubborn
mildew, add bleach to your cleaning solution.
Tackle minor repairs immediately
Small holes or scratches might not seem like a big deal, but when exposed to the elements, they can grow
into bigger problems. By promptly filling small holes and priming and painting scratched paint, you
can stop further damage in its tracks.
Finish:For long lasting finish,periodically clean and wax the exterior surface.Touch-up scratches
as soon as you notice them on your unit.Immediately clean the area with a wire brush,wash it and
apply touch-up paint per manufacturer's recommendation.
Roof:Keep roof clear of leaves and snow with long handled,soft-bristled broom.Heavy amounts of
snow on roof can damage building making it unsafe to enter.In snow country,Roof Strengthening
Kits are available for most TeachYard for added protection against heavy snow accumulation.
Doors:Always keep the door tracks clear of dirt and other debris that prevent them from sliding
easily.Lubricate door track annually with furniture polish or silicone spray.Keep doors closed and
locked to prevent wind damage.
Fasteners:Use all washers supplied to protect against weather infiltration and to protect the metal
from being scratched by screws.Regularly check your building for loose screws,bolts,nuts,etc.
Other Tips...
.Wash off inked part numbers on coated panels with soap and water.
.Silicone caulking may be used for watertight seals throughout the building.
Clean..... Cut..... Touch-up paint
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY 3/13
Selcting and Preparing Your Site:Before assembly,you will want to decide on a location for your
building.The best location is a level area with good drainage.
.Allow enough working space for ease of moving parts into position during assembly.Be sure there
will be enough space at entrance for doors to open fully and enough space around the building to
be able to fasten the panel screws from the outside.
.Before you begin the first steps in assembling your parts,a foundation should be constructed
should be ready to use.
Concrete Slab(not included)
The slab should be at least 3'' to 4''(8-10cm)thick.It must be level and flat to provide good support
for the frame.
The following are the recommended materials for your foundation.
.1 x 4's (2.5cm x 10cm)(willbe removed once the concrete cures)
.Concrete .Sheet of 6 mil plastic
. We recommend for a proper strength concrete to use a mix of:
1 part cement . 3 parts pea sized gravel . 2 1/2 parts clean sand
Of course,you can build on grassland,you don't have to do anything.
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY 4/13
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY
Plan for the builing
5/13
Part
No. Diagr
am
Parts List
Length(mm)
QTY(pcs)
A1
210 4
A2
1410 10
A3
350 8
B1/D
1590 12/12
B2
705 12
C
640 12
E
520 6
F1
1005 4
F3
1630 6
F2
1500 2
P
1680 30
X
1000 6
U
S0
1800
φ16x200
6
10
S1
φ5.5x25 540
S2
φ10x35 12
H
8
O
24
G
2
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY 6/13
A2
A3
A1
A1
A3
A1
S1
A3
Make sure the floor is level beforeassembly!
S1
Assemble the Foundation Kits
A2
A2
A2
A2
A3
S1
1
A2
A3
Straighten
B1 A2
Seamless
Spike
2.8m
2.4m
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY
Remark : It's not horizontal,if without screws.
A3 A2
7/13
A2
A2
A3
Assemble the First Upstanding
Assemble the remain 4 sets Upstanding and Dynabolt
E
S0
S1
S0
S1
S1
1
short end on top
AB
CD
Note:
Line C=Line D=8.345m
Line A=Line B=8.345m
A1
S1
12
S1
A3
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY
B1
C
1
2
D1
2
E
S1 S1
S1
S1
C
S1
2
S1
S1
S1
B2
B1
B2
S1
8/13
S1
S1
S0
1
1
S0 S0
S0 S0
X
X
X
X
X
1
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY 9/13
Note:
5xS0,or 10xS0 both are OK
Depends on your wind speed
S0
X
P
S1 P1
100mm
1
1
Starting from P, then P1,P2 so on
Remark:P,P1, all are the part 'P'.
D
P
F1
F3
F3
F2
F1 S1
S1
S1
1B2
F1
S2
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY
1
S2
S2
S2
S2
S2
P1
S1
P
S1
P
P
10/13
F3
S2
S1
First,assemble 6 pcs 1680mm sheets
Stick Silicone Sealant on the sheets
P
Step 1:Apply Silicone
G
Step 2:Join the 2 surfaces
P
P
P
P
Step 3:Drill Screws
S1
P
Overlap by 15cm
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY 11/13
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY
6pcs
H
U
U
U
S1 S1
S1
H
H
H
H
H
6pcs
6pcs
6pcs
12/13
6pcs
S1
S1
S1
S1
1
2
2
U
B
P
U
1
S1
B
P
1
H
O
Cut 'U' into
needed shape.
IMPORTANT:WEAR HAND GLOVES TO PREVENT INJUIRY 13/13
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13

ALEKO CPM12X23WH-HD User manual

Type
User manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI