Exteria 24PSFECCF Installation guide

Type
Installation guide

Exteria 24PSFECCF is a plastic composite exterior building panel designed for use in a vertical placement on walls. It is not designed or warranted for roofing or flooring applications. Mansard roofs with a 45/12 slope or greater are acceptable applications.

The panel is intended for use over a weather-resistant house barrier system, such as house wrap, and is not a watertight covering. It is designed to allow the material underneath it to breathe.

The panel is 39 1/2" wide and has a minimum of eight fasteners per panel. A closer spacing of fasteners is required for high velocity wind areas. The panel requires a minimum of 7/16" solid substrate, such as OSB board or plywood.

Exteria 24PSFECCF is a plastic composite exterior building panel designed for use in a vertical placement on walls. It is not designed or warranted for roofing or flooring applications. Mansard roofs with a 45/12 slope or greater are acceptable applications.

The panel is intended for use over a weather-resistant house barrier system, such as house wrap, and is not a watertight covering. It is designed to allow the material underneath it to breathe.

The panel is 39 1/2" wide and has a minimum of eight fasteners per panel. A closer spacing of fasteners is required for high velocity wind areas. The panel requires a minimum of 7/16" solid substrate, such as OSB board or plywood.

WIQPC1010REV‐  Page|1of7   STACKEDSTONE
Installation Guidelines
ExteriaBuildingProductsprovidestheseinstructionsasgeneralguidelinesonly.ExteriaBuilding
Productsneitherinstallssidingnorhasanycontroloveranyinstallation.Thecontractorand/orinstaller
shallberesponsibleforensuringthatallapplicablelocalbuildingcodesarefollowed,whichmayrequire
modificationofthesegeneralguidelines.Exteria
BuildingProductsassumesnoliabilityforpersonal
injuryorpropertydamageresultingfromimproperorcarelessapplicationofthedescribedtechniques.
FormoreinformationonExteriaBuildingProductsanditswidevarietyofstateof‐theartproducts,
pleasecallusat877EXTERIA(8773983742)orwrite:
1111NW165Street,Miami,FL331695819.
InstallationGuidelinescanbedownloadedfromourwebsite:www.exteriapb.com
.

WIQPC1010REV‐  Page|2of7   STACKEDSTONE
BASIC GUIDELINES
1. Alwaysworkfromlefttoright,completinginstallationononewallbeforebeginninganother.
Alwaysstartingatthelowestpointofthestructure.
2. Aswithanyplasticcompositeexteriorbuildingmaterials,ExteriaBuildingProductspanelswill
expandandcontractwithachangeintemperature.Therefore,duringinstallation it
isnecessary
topositionthepanelsproperlytocompensatefortemperatureeffects.Usecautionnottoforce
panelsdownontotheflangeofthelowerrow,asthiswilloverridetheexpansionjointsandmay
causebuckling.Storingpanelsin heate dareasmakethemmorepliable,allowingforeasier
installation
incoldertemperatures.
3. Storepanelsonedge,donotstackflat.
4. ExteriaBuildingProductspanelsareintendedforuseinaverticalplacementonly, andarenot
designedorwarrantedforroofingorflooringapplications.Mansardroofswitha45/12slopeor
greaterareacceptableapplications.
5. Itis
essentialthatyouworkoverasmooth,flat,nailablewallsurface,(i.e.Minimum7/16”OSB
boardorplywoodisrecommended).Refertotherespectivefurringstripinstallationguidelines
iffurringstripsareutilized.
6. Noncorrosivefastenersarerequiredtosecurethepanelsand theymustpenetratethesolid
substrate
byatleast7/16”.
7. Iffacenailingisemployed,predrillaholeinaninconspicuousarea,suchasamortarjoint.The
holemustbelargerthantheshankofthenailorscrew,butsmallerthanthehead,toallowfor
possibleexpansion.Theheadcanbecovered
withcaulk.
8. Fasteningthepanelsshouldnotrestrictpanelmovement.Fastenersshouldbedrivenstraight
intothecenterofanyelongated holemakinglightcontactwiththepanel,allowingthepanelto
behung.Itisbesttoworkwiththepanelsatwaistlevel,allowingtheinstallerto
inspectthe
backofthepanels,verifyingthatallfingersareproperlyengaged.
9. Overriding the expansion stops may restrict panel movement and cause buckling.The panel
requires a minimum of eight fasteners per panel.A closer spacing of fasteners is required for
high velocity wind areas; for details refer to
report ESR3070, which can be downloaded from
ourwebsitewww.exteriabp.com.
10. Sidinghasalwaysbeendesignedasanexteriorcladding.ExteriaBuilding Productssidingis
designedtoallowthematerialunderneath ittobreathe;therefore,itisnotawatertight
covering.Toachievedesignedperformance,ExteriaBuildingProductssiding
mustbeinstalled
overaweatherresistanthousebarriersystemsuchashousewrap.
WIQPC1010REV‐  Page|3of7   STACKEDSTONE
INSTALLATION STEPS
STEP ONEInstallthestarterstripatthelowestpointofthestructure.Thestructure’ssolidsubstrate
mustbenolessthan7/16”thick.Thestripshouldbepositioned31/2”fromthewallcornerallowingfor
thewidthofthecornerpieceormoldedcorner.Nailthestarterstripevery12”.Makesurethestarter
stripremainslevel.
Figure1
STEP TWOIf usingvinylcornerposts,installthepostpriortoinstallinganypanels.Whenusingthe
StackedStonemoldedcorner,installastarterclip,openendUP(figure2)andinlinewiththestarter
strip(figure1).StackedStonemoldedcornerswillbeinstalledafterpanelsfromadjacentwallshave
beenset.(See“StackedStoneMoldedCornerInstallation”sectionbelow).
Figure2
STEP THREE:Itisrecommendedtodeterminethenumberofpanelsneededforthewallby
measuringthetotallengthofthewallininches,subtractingthewidthofthecor nerpiecesusedand
dividingby39½”(thewidthofonepanelexposedtotheweather).Asyouwillneedtocuttherightend
panel,ensurethatitremainsatleast12”widebyreducing
thesizeofthestartingpanel.Besurenotto
overlapthemortarjointsofthepanelbelow toensureapleasingandauthenticstonelook.Donotcut
morethanoneendpieceatthistimesinceadjustmentswillberequiredforsucceedingrows.
STEP FOUR:Workingfromleftto
right,slidethefirstpanelleft,buttingitflushtothevinylcorneror
forusewithmoldedcorners,leavea2½”to3”gapfromthecornerofthewalltotheedgeofthe
installedpanel(figure3).Setthefirstpanelgentlyontothestarterstripmakingsuretoproperlyengage
allinstallationfingers.Donotoverridethefunctioni ng,positivestop
poststhatareinlinewiththe
installationfingersonthebackofthepanel.
WIQPC1010REV‐  Page|4of7   STACKEDSTONE
Figure3
STEP FIVEDriveafastenerstraightthroughthesubstratewhileensuringthattheheadonlymakes
lightcontactwiththepanel.Thisallowsthepaneltomovewithvaryingtemperatures.Thepanel
requiresaminimumofeight(8)fastenersperpanel(figure4).Forhighvelocitywindareas,afasteneris
requiredineachnailingslot.
Figure4
Hookthenextpanelintothestarterstripandslideitintothefirstpanelassuringthetwo(2)sidelocks
engagewiththeslotsfromthepreceding(installed)panel(figures5and6).
Figure5 Figure6
STEP SIXInstalltheremainingcourses,repeatingsteps1,3,4,and5.Thefastenermustbeflushwith
thepanel,soasnottointerferewiththesucceedingrowofpanels.Inordertoachievearealistic
StackedStonelook,staggereachsubsequentcourseinincrementsof8”(figure7).Neverforcepanels
downontopofeachotherorintoeachother,lefttoright,orelserisk
breakingthestoppostsonthe
backofthepanel.Setthemintoplacegently,ensuringthatallfingersand/orsidelocksareengaged,
WIQPC1010REV‐  Page|5of7   STACKEDSTONE
andallowthepanelstoseatthemselves.Thestoppostsaredesignedtopreventbucklingdueto
changingtemperatures.
Reminder:Besurealllockingfingersareproperlyengaged.
Figure7
STEP SEVENAswithanyplasticexteriorbuildingmaterial,theStackedStonepanelwillexpandand
contractwithachangeintemperature.Therefore,duringinstallationitisnecessarytoposition the
panelsproperlytocompe nsatefortemperatureeffects.Wheninstallingatpaneltemperaturesfrom30
to100degreesFahrenheit,positionthenextpanelsothattheupperleftcornerofthepanel’snailing
hemisbuttedagainst
thepreceding(i nstalled)panel(Figure#8).
Forinstallationsattemperaturesbelow30degreesF,positionthenextpanelslightlyrightofthe
precedingpanel’sedge(e.g.1/16”).Fortemperaturesabove100degreesF,positionslightlyleftsothe
paneloverlapstheprecedingpanel.Oncethepanelhasbeenproperlyspaced,
insertafastenerintothe
centerholeofthepanel.
Figure8
STEP EIGHTFittingpanelpiecesbetweenwindowsoraround openings requiresacutbackspacing
of1/8''whenpanelsareinstalledincoldtemperatures.Similarspacingmayalsobenecessarywhen
fittingpanelsintogableends,overroofangles,aroundlightblocksoranyotherplacewhereadequate
panelmovementisprevented.
WIQPC1010REV‐  Page|6of7   STACKEDSTONE
STEP NINEExteriaJchannelsmaybeusedforinsidecornertreatments.Panelsmaybescribedand
cuttofitintothecorner(Figures#9&10).Itisrecommendedtosleevethecornerwithvinylor
aluminumcoilpriortoinstallationofpanels.Caulkcornerafterinstallation.
Figure9 Figure10
STEP TENWhencompletingawall,facenailingmaybenecessary.Iffacenailingisemployed,predrill
aholeinaninconspicuousarea,suchasamortarjoint.Theholemustbelargerthantheshankofthe
nailorscrew,butsmallerthanthehead,toallowforpossibleexpansion.Theheadcanbecoveredwith
matchingpaint.
STACKED STONE INDIVIDUAL MOLDED CORNER INSTALLATION
ThesidingmustbeinstalledonadjacentwallsPRIORtoinstallingcorners.
STEP ONEBesurethestarterclipisaffixedatthebottomofthewall’scorner.SlideyourfirstStacked
Stonemoldedcorneroverthesidingandengageitintothestarterclip.Thecornerofferstwo(2)pairsof
fasteningpositionstochoosefrom.Forfasteners,galvanizedscrewsarerecommended.Oncepositioned
properly,insertone(1)fasteneroneachside(Figure#11).
Figure11
STEP TWOTakethenextcornerandengageitintothecornerbelow.Someadjustmentmayneedto
bemadeattheverticaloverlapoftwo(2)corners(astheyareinstalled)inordertomaintainthecorner/
panelhorizontalalignment.Thereisapproximatelya1/2”verticaladjustmentavailable.Gentlytugthe
bottomofthecornertoensureitisproperlyengaged.Repeatthisstepuntilthecornerinstallation
is
WIQPC1010REV‐  Page|7of7   STACKEDSTONE
complete.Note:Thelastmoldedcornertobeinstalled inacolumnmayneedtobecuttofitthe
remainingspaceinthatcolumn.
INSTALLING STONE LEDGE TRIM
Stoneledgetriminstallsoverthetopcourseofpanels
BENDING LEDGE TRIM
Stoneledgetrimcanbeinstalledaroundacorner.Becauseofthedifferent
shapeoftheledgetrim,av
notchmustfirstbecutatthepointwhereyouplanonbendingit(Figure#12).Oncethevnotchhas
beencut,thetrimmaybeheatbentandinstalled.Wealsoprovidepremanufacturedcornerstomake
installationeasier(Figure13).
Figure12 Figure13
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
_
SPECIAL SITUATIONS AND SUGGESTIONS
SITUATION
1. Panelswon’tlocktogethersidebyside.
2. Thebottomlockingfingerswon’tlockinto
thepreviousrow.
3. Panelsarebucklingonthewall
4. Panelsarenotlayingdownflat
ITEMS TO CHECK
Thewallmaynotbelevelandflat.Checkprevious
panelstoensurethatallpanelsandinstallation
fingersareproperlyseated.(SeBasicGuidelines)
Makesurethenailsarenotrestrictingpanel
movement.Checkforproperspacingatside
interlocks.Makesureallfingersareengagedinto
previouspanel

ATTACHING OBJECTS TO PANELS
Neverattachfixturesdirectlytosiding.Whenattachingfixtures,useablockandfollowthefixture
manufacturer’sinstallationinstructions.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7

Exteria 24PSFECCF Installation guide

Type
Installation guide

Exteria 24PSFECCF is a plastic composite exterior building panel designed for use in a vertical placement on walls. It is not designed or warranted for roofing or flooring applications. Mansard roofs with a 45/12 slope or greater are acceptable applications.

The panel is intended for use over a weather-resistant house barrier system, such as house wrap, and is not a watertight covering. It is designed to allow the material underneath it to breathe.

The panel is 39 1/2" wide and has a minimum of eight fasteners per panel. A closer spacing of fasteners is required for high velocity wind areas. The panel requires a minimum of 7/16" solid substrate, such as OSB board or plywood.