Page 4
INSTALLER GUIDE
© Baxi Heating U.K. Limited 2007.
CONTENTS
Section Heading Page
1. SAFETY 5
2. APPLIANCE DATA 6
3. LIST OF AVAILABLE KITS 7
4. APPLIANCE AND RECESS DIMENSIONS 8
5. GENERAL INSTALLATION REQUIREMENTS 9
6. UNPACKING AND PRELIMINARY CHECKS 15
7. GAS SUPPLY CONNECTION 17
8. WALL PREPARATION 17
8.1 Select appliance position. 17
8.2 Constructing a recessed opening. 17
8.3 Combustible wall materials. 19
8.4 Cutting the flue hole for brick, stone etc. building. 19
8.5 Cutting the flue hole in timber frame buildings. 20
8.6 Prepare appliance fixing holes. 21
9. FLUE AND TERMINAL INSTALLATION 22
9.1 Cutting flue to size. 22
9.2 Fitting to wall. 23
9.3 Fitting the terminal guard. 24
10. GAS CONNECTION 24
11. CERAMIC COALS INSTALLATION 25
12. CERAMIC PEBBLES INSTALLATION 27
13. WINDOW FITTING 29
14. FULL OPERATING CHECKS 29
14.1 Check for leaks. 29
14.2 Check control operation. 29
14.3 Checking inlet pressure. 30
15. FASCIA FITTING 31
16. FINAL REVIEW 32
17. SERVICING & PARTS REPLACEMENT 33
17.1 To remove fascia. 33
17.2 To remove window unit. 34
17.3 To remove the ceramic fuel effect and rear wall. 34
17.4 To remove the complete burner module. 34
17.5 To remove the burner from the burner module. 35
17.6 To remove the injector. 35
17.7 To remove the pilot unit. 35
17.8 To remove the gas valve. 36