H1031420911

Mueller Company H1031420911 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Mueller Company H1031420911 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Installation Instructions
1. Connect service line to curb stop per manufactures
instructions.
2. Compact ground under area where curb stop is to
be placed.
3. Place curb stop on compacted ground, curb stop foot
piece or brick per city specications.
4. Install stationary rod if applicable.
5. Place curb box over the curb stop. If using Minneapolis
type curb box thread curb box to valve.
6. Pull up on curb box pipe to desired height.
Note: the bottom of the pipe is ared and must be pulled
up into the upper barrel. If the curb box is at the desired
height and the bottom of the pipe has not reached the
upper barrel install a shorter curb box or the pipe will spin
when the lid is removed.
7. Back ll. Compact evenly around the curb box, curb stop
and service line.
Curb Box
By deviating from the above listed instructions, you will void any product
warranty and release Mueller Co. and its aliated entities from any and all
liability associated with the installation or use of this product. For details on
the product’s warranty, terms, and conditions, please visit
www.muellercompany.com.
Phone: (800) 423-1323
© 2016 Mueller Co., LLC. All rights reserved.
Form 13277 10/16
/