Ultra-tec Industrial Pretensioner Operating instructions

Type
Operating instructions
PRETENSIONER01 INST | 4.1.20
800.851.2961 | 775.885.1443 | ultra-tec.com
Industrial Pretensioner Instructions
1. Open the clamp of the pre-tensioner. Place around cable
so the cable sits in the V-groove and extends through
the slot. The hex driver that extends beyond the housing
should be facing the end post, with the larger side of the
pre-tensioner butted up against the last intermediate
post in the rail (not the end post itself).
2. Adjust the brass-tip bolt to securely hold the cable.
Lock the clamp.
3. Using an impact driver with ½” socket, tighten the
cable to the desired tension — for best results, lightly
apply lubricant to the threads. The indications in the
load window are for reference only; a tension gauge is
required for accuracy.
4. Connect the cable at the end post, without having to
pull tension through the entire cable length, only from
the pre-tensioner to the end post. After installing the
cable at the end post, release the clamp and remove the
pre-tensioner. Reset using the impact driver, and move
on to the next cable, repeating the process.
  • Page 1 1

Ultra-tec Industrial Pretensioner Operating instructions

Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI