H3C MSR 20 Installation guide

Type
Installation guide

This manual is also suitable for

H3C MSR 20 Routers
Installation Guide
Hangzhou H3C Technologies Co., Ltd.
http://www.h3c.com
Document version: T2-08047K-20101217-C-1.05
Copyright © 2006-2010, Hangzhou H3C Technologies Co., Ltd. and its licensors
All rights reserved
No part of this manual may be reproduced or transmitted in any form or by any means without prior
written consent of Hangzhou H3C Technologies Co., Ltd.
Trademarks
H3C,
, Aolynk, , H
3
Care,
, TOP G, , IRF, NetPilot, Neocean, NeoVTL,
SecPro, SecPoint, SecEngine, SecPath, Comware, Secware, Storware, NQA, VVG, V
2
G, V
n
G, PSPT,
XGbus, N-Bus, TiGem, InnoVision and HUASAN are trademarks of Hangzhou H3C Technologies Co.,
Ltd.
All other trademarks that may be mentioned in this manual are the property of their respective owners
Notice
The information in this document is subject to change without notice. Every effort has been made in the
preparation of this document to ensure accuracy of the contents, but all statements, information, and
recommendations in this document do not constitute the warranty of any kind, express or implied.
Environmental protection
This product has been designed to comply with the environmental protection requirements. The storage,
use, and disposal of this product must meet the applicable national laws and regulations.
Preface
The H3C MSR 20 Routers Installation Guide describes how to install the H3C MSR 20 Routers, maintain
software and hardware of the router, and solve problems you may encounter during the installation
process.
This preface includes:
Audience
Conventions
About the H3C MSR documentation set
Obtaining documentation
Technical support
Documentation feedback
Audience
This documentation is intended for:
Network planners
Field technical support and servicing engineers
Network administrators working with the MSR Series
Conventions
This section describes the conventions used in this documentation set.
Symbols
Convention Description
WARNING
An alert that calls attention to important information that if not understood or followed can
result in personal injury.
CAUTION
An alert that calls attention to important information that if not understood or followed can
result in data loss, data corruption, or damage to hardware or software.
IMPORTANT
An alert that calls attention to essential information.
NOTE
An alert that contains additional or supplementary information.
TIP
An alert that provides helpful information.
Network topology icons
Represents a generic network device, such as a router, switch, or firewall.
Represents a routing-capable device, such as a router or Layer 3 switch.
Represents a generic switch, such as a Layer 2 or Layer 3 switch, or a router that supports
Layer 2 forwarding and other Layer 2 features.
About the H3C MSR documentation set
The H3C MSR documentation set includes:
Category Documents Purposes
MSR 900 Routers Marketing
brochures
MSR 20-1X Routers Marketing
brochures
MSR 20-2X[40] Routers Marketing
brochures
MSR 30 Routers Marketing brochures
Product description and
specifications
MSR 50-40[60] Routers Marketing
brochures
Describe product specifications and
benefits.
MSR 900 Routers Installation guide
MSR 20-1X Routers Installation guide
MSR 20-2X[40] Routers Installation
guide
MSR 30 Routers Installation guide
MSR 50 Routers Installation guide
Hardware specifications
and installation
MSR Series Routers Interface Module
Manual
Provides a complete guide to hardware
installation and hardware
specifications.
MSR Series Routers Configuration
guides
Describe software features and
configuration procedures.
MSR Series Routers Command
references
Provide a quick reference to all
available commands.
Software configuration
MSR Series Routers Web
Configuration guides
Describe Web software features and
configuration procedures.
MSR Basic Series Routers Release
notes
Operations and
maintenance
MSR Standard Series Routers Release
notes
Provide information about the product
release, including the version history,
hardware and software compatibility
matrix, version upgrade information,
technical support information, and
software upgrading.
Obtaining documentation
You can access the most up-to-date H3C product documentation on the World Wide Web at
http://www.h3c.com.
Click the links on the top navigation bar to obtain different categories of product documentation:
[Technical Support & Documents > Technical Documents] – Provides hardware installation, software
upgrading, and software feature configuration and maintenance documentation.
[Products & Solutions] Provides information about products and technologies, as well as solutions.
[Technical Support & Documents > Software Download] – Provides the documentation released with the
software version.
Technical support
customer_service@h3c.com
http://www.h3c.com
Documentation feedback
You can e-mail your comments about product documentation to [email protected].
We appreciate your comments.
i
Contents
Overview ······································································································································································ 1
Introduction ········································································································································································1
Router Model and Structure ·············································································································································1
Hardware Specifications ·········································································································································1
MSR 20-20 Router····················································································································································2
MSR 20-21 Router····················································································································································4
MSR 20-40 Router····················································································································································6
Generic Modules·······························································································································································8
SIC and DSIC Interface Cards ································································································································8
ESM Module ·····························································································································································8
VPM and VCPM Module ·········································································································································9
Installation Preparations ············································································································································10
Requirements on Environment ······························································································································ 10
Requirements on Temperature/Humidity ············································································································ 10
Requirements on Cleanness·································································································································· 10
Requirements on Electrostatic Discharge Prevention·························································································· 11
Requirements on Electromagnetic Environments ································································································ 11
Requirements on Preventing Lightning················································································································· 11
Checking the Rack················································································································································· 12
Safety Precautions ················································································································································· 12
Installation Tools and Meters and Equipments ··································································································· 12
Installation···································································································································································14
Installation Process ························································································································································· 14
Installing the Cabinet ····················································································································································· 14
Installing the Router························································································································································ 14
Installing the Router on a Workbench················································································································· 15
Installing the Router in a Cabinet ························································································································ 15
Installing Generic Modules ··········································································································································· 17
Connecting the PGND Cable ······································································································································· 17
Connecting the Power Cord·········································································································································· 18
Power Input and PGND········································································································································ 18
Connecting the AC-input Power Cord················································································································· 18
Connecting the Console Terminal ································································································································ 19
Fixed Interfaces ······························································································································································ 20
Ethernet Interface··················································································································································· 20
Ethernet Switching Interface ································································································································· 21
Connecting AUX to a Modem······························································································································ 22
Interface Modules··························································································································································· 23
Installing and Removing Interface Modules················································································································· 23
Slide Rail ································································································································································ 24
Installing a DSIC Interface Card ·························································································································· 24
Removing a DSIC Interface Card ························································································································ 25
Verifying Installation ······················································································································································ 25
Startup and Configuration·········································································································································26
Startup ············································································································································································· 26
Setting up Configuration Environment ················································································································ 26
Powering on the Router········································································································································· 28
ii
Startup Process······················································································································································· 29
Configuration Fundamentals········································································································································· 30
Basic Configuration Procedures··························································································································· 30
Command Line Interface······································································································································· 30
Arranging Slots and Numbering Interfaces········································································································ 31
Software Maintenance···············································································································································33
Introduction ····································································································································································· 33
Files········································································································································································· 33
Software Maintenance Methods·························································································································· 34
Maintaining Application Program and Configuration Through Command Lines···················································· 35
Maintaining the Router Through TFTP Server ····································································································· 36
Maintaining the Router Through FTP Server ······································································································· 38
BootWare Menu····························································································································································· 41
Main BootWare Menu·········································································································································· 41
BootWare Submenus ············································································································································ 43
Upgrading an Application Program Through an Ethernet Interface········································································· 46
Configuring Ethernet Interface Parameters ········································································································· 46
Upgrading Procedure ··········································································································································· 47
Upgrading BootWare Through Ethernet Interface······································································································ 49
Upgrading BootWare Through Serial Interface·········································································································· 49
XModem Protocol Overview ································································································································ 49
Modifying Serial Interface Parameters················································································································ 50
Upgrading BootWare··········································································································································· 51
Upgrading an Application Program through a Serial Interface················································································ 53
Maintaining Application and Configuration Files ······································································································ 53
Dealing with Password Loss·········································································································································· 55
User Password Loss ··············································································································································· 55
BootWare Password Loss ····································································································································· 56
Super Password Loss············································································································································· 56
Backing Up and Restoring BootWare·························································································································· 57
Hardware Maintenance ············································································································································58
Preparing Tools ······························································································································································ 58
Opening/Closing Chassis Cover································································································································· 58
Internal Structure····························································································································································· 60
Installing/Removing CF Card ······································································································································· 61
Structure·································································································································································· 61
Installing CF Card ················································································································································· 61
Removing CF Card················································································································································ 62
Replacing Memory Bar·················································································································································· 62
Memory Bar Structure ··········································································································································· 63
Memory Bar Slot···················································································································································· 64
Installing/Removing Memory Bar························································································································ 64
Installing/Removing ESM/VCPM Card······················································································································· 65
Troubleshooting··························································································································································67
Troubleshooting the Power System······························································································································· 67
Troubleshooting the Configuration System·················································································································· 67
Troubleshooting Application Software Upgrade ········································································································ 68
Index ···········································································································································································70
1
Overview
Introduction
MSR 20 Routers were self-developed for use on enterprise-level networks. Depending on the network size,
MSR 20 Routers can be either core routers on small and medium enterprise networks, or access routers
for network branches on some large-sized enterprise networks. Therefore, MSR 20 Routers are suitable
for the application on the carrier-level networks, such as telecom management networks and billing
networks. MSR 20 Routers adopt modular design and provide a wide range of optional smart interface
cards (SICs). The MSR-20, MSR 20-21 and MSR 20-40 are available with AC-powered units.
Currently, the MSR 20 includes the following models:
MSR 20-20
MSR 20-21
MSR 20-40
Router Model and Structure
The MSR 20 Routers include MSR 20-20, MSR 20-21, and MSR 20-40. These three models are similar
in chassis structure and layout. All of them can be put on the tabletop and can be mounted in 19-inch
standard racks. The following subsections will give you more details about these three models.
Hardware Specifications
Table 1 Hardware specifications for the MSR 20 routers
Item MSR 20-20 MSR 20-21 MSR 20-40
Console 1 1 1
AUX 1 1 1
USB 1 1 1
FE Two FE interfaces Two FE interfaces Two FE interfaces
Fixed
interfaces
FE switching
interface
0 8 0
External
modules
SIC module 2 SICs 2 SICs
4 SICs (compatible
with 2 DSICs)
ESM module 1 1 2
VCPM module 0 0 1
Internal
modules
VPM strip 0 0 2
Processor PowerPC PowerPC PowerPC
Boot ROM 4 MB 4 MB 4 MB
2
Item MSR 20-20 MSR 20-21 MSR 20-40
Memory
SDRAM
Default: 128 MB
Maximum: 384 MB
SDRAM
Default: 128 MB
Maximum: 384 MB
SDRAM
Default: 128 MB
Maximum: 384 MB
CF flash
Default: 256 MB
Maximum: 1 GB
Default: 256 MB
Maximum: 1 GB
Default: 256 MB
Maximum: 1 GB
Dimensions (H × W × D)
(excluding feet and mounting
brackets)
44.2 × 360 × 287.1
mm (1.74 × 14.17 ×
11.3 in.)
44.2 × 360 × 287.1
mm (1.74 × 14.17 ×
11.3 in.)
44.2 × 442 × 407.1
mm (1.74 × 17.4 ×
16.02 in.)
Weight 3.4 kg (7.5 lb.) 3.4 kg (7.5 lb.) 5.4 kg (11.9 lb.)
AC input
Rated voltage: 100
VAC to 240 VAC;
50/60 Hz
Rated voltage: 100
VAC to 240 VAC;
50/60 Hz
Rated voltage: 100
VAC to 240 VAC;
50/60 Hz
Max power consumption 54 W 54 W 100 W
Operating temperature
0°C to 40°C (32°F to
104°F)
0°C to 40°C (32°F to
104°F)
0°C to 40°C (32°F to
104°F)
Relative humidity (non-condensing) 5% to 90% 5% to 90% 5% to 90%
NOTE:
The Boot ROM stores the Bootstrap for booting the router.
The memory is used to store the communication data between the system and the CPU when the system
is running.
The CF card is used to store the software system and configuration file. The CF card LED blinks when the
system is readin
g
/writin
g
data from/to the CF card. In this case, do not remove the CF card, otherwise
hardware and software damage may occur.
Do not unplug the USB device during USB data transmission; otherwise, data loss or even hardware
failures may occur.
The USB interface does not support hot-swapping of USB modems from Sierra Wireless.
MSR 20-20 Router
Appearance
1. Front view
3
Figure 1 Front view of an MSR 20-20 router
(1) Power LED (PWR) (2) System LED (SYS)
(3) ESM LED (ESM)
2. Rear view
Figure 2 Rear view of an MSR 20-20 router
(1) SIC slot2 (2) SIC slot1
(3) Grounding terminal (4) Power socket
(5) Power switch (6) Fixed Ethernet port0 (LAN0)
(7) Fixed Ethernet interface 1 (LAN1) (8) Console port (CON)
(9) Auxiliary port (AUX) (10) USB interface
(11) CF card
Panel LEDs
The following table gives the features of MSR 20-20 router LEDs:
Table 2 Front panel LEDs of an MSR 20-20 router
LED Description
PWR
Power LED:
ON means power is on.
OFF means power is off.
SYS
System operating LED:
Green and fast blinking means the system is booting.
Green and slow blinking means the system is operating normally.
Yellow and fast blinking means the system is malfunctioning.
Steady OFF means the system does not operate normally.
4
LED Description
ESM
ESM module LED:
Green and slow blinking means the system is booting.
Green means ESM card is operation normally.
Yellow means ESM card is malfunctioning.
Steady OFF means no ESM card is present.
Table 3 Rear panel LEDs of an MSR 20-20 router
LED Description
LINK
OFF means no link is present.
ON means a link is present.
ACT
OFF means no data is being transmitted or received.
Blinking means data is being transmitted or received.
CF
Steady green means a CF card is present.
Green and blinking means the CF card is reading/writing data. To prevent data
corruption, do not remove the running CF card.
Steady yellow means the present CF card is malfunctioning.
Steady OFF means no CF card is present or the present CF card cannot be identified by
the system.
MSR 20-21 Router
Appearance
1. Front view
Figure 3 Front view of an MSR 20-21
(1) Power LED (PWR) (2) System LED (SYS)
(3) ESM LED (ESM)
2. Rear view
5
Figure 4 Rear view of an MSR 20-21
(1) SIC slot2 (2) SIC slot1
(3) Grounding terminal (4) Power socket
(5) Power switch (6) Fixed Ethernet port0 (LAN0)
(7) Fixed Ethernet port1 (LAN1) (8) Console port (CON)
(9) Auxiliary port (AUX) (10) USB interface
(11) CF card (12) Fixed L2 switching port (LAN2 through LAN9)
Panel LEDs
The following table gives the features of MSR 20-21 router LEDs:
Table 4 Front panel LEDs description of an MSR 20-21 router
LED Description
PWR
Power LED:
ON means power is on.
OFF means power is off.
SYS
System operating LED:
Green and fast blinking means the system is booting.
Green and slow blinking means the system is operating normally.
Yellow and fast blinking means the system is malfunctioning.
Steady OFF means the system does not operate normally.
ESM
ESM module LED:
Green and slow blinking means the system is booting.
Steady green means ESM card is operation normally.
Steady yellow means ESM card is malfunctioning.
Steady OFF means no ESM card is present.
Table 5 The rear panel LEDs of an MSR 20-21 router
LED Description
LINK
OFF means no link is present.
ON means a link is present.
6
LED Description
ACT
OFF means no data is being transmitted or received.
Blinking means data is being transmitted or received.
CF
Steady green means a CF card is present.
Green and blinking means the CF card is reading/writing data. To prevent data
corruption, do not remove the running CF card.
Steady yellow means the present CF card is malfunctioning.
Steady OFF means no CF card is present or the present CF card cannot be identified by
the system.
MSR 20-40 Router
Appearance
1. Front view
Figure 5 Front view of an MSR 20-40
(1) Power LED (POWER) (2) System LED (SYSTEM)
(3) Console port (CONSOLE) (4) Auxiliary port (AUX)
(5) USB interface (6) CF card
(7) Power socket (8) Power switch
2. Rear view
7
Figure 6 Rear view of an MSR 20-40
(1) FE interface 0 (2) FE interface 1
(3) SIC slot1 (4) SIC slot2
(5) SIC slot3 (6) SIC slot4
(7) Grounding terminal (8) LEDs
Panel LEDs
Description of LEDs on an MSR 20-40 router is as follows:
Table 6 Front panel LEDs of an MSR 20-40 router
LED Description
PWR
Power LED:
ON means the circuit board supplies power normally.
OFF means the circuit board does not supply power.
SYS
Hardware system operation LED:
Blinking means the system is operating normally.
Steady ON or steady OFF means the system does not operate normally.
CF
CF card LED:
Steady green means the CF card is in place, and can be identified by the router.
Blinking green means the CF card is being accessed and cannot be removed.
Steady yellow means the CF card is in place, but cannot be identified by the router.
OFF means no CF card is inserted or the CF card cannot be identified.
Table 7 Rear panel LEDs of an MSR 20-40 router
LED Description
LINK
OFF means no link is present.
ON means a link is present.
ACT
OFF means no data is being transmitted or received.
Blinking means data is being transmitted or received.
ESM0 to 1
OFF means no ESM is in the ESMx slot.
Steady green means an ESM is in the ESMx slot and operates normally.
Steady yellow means an ESM is in the ESMx slot but does not operate normally.
8
LED Description
VCPM
OFF means no VCPM is in the slot.
Steady green means a VCPM is in the slot and operates normally.
Steady yellow means a VCPM is in the slot but does not operate normally.
VPM0 to 1
OFF means no VPM is in the VPMx slot.
Steady green means a VPM is in the VPMx slot and operates normally.
Steady yellow means a VPM is in the VPMx slot but does not operate normally.
Generic Modules
The MSR 20 is available with generic modules such as SIC interface card and ESM. For detailed
information about interface cards, refer to MSR Series Routers Interface Module Manual.
For the types of interface modules that each model of the MSR 20 routers can accommodate, refer to
Appendix A Interface Card and Interface Module Purchase Guide in the MSR Series Routers Interface
Module Manual.
SIC and DSIC Interface Cards
MSR series routers adopt modular design and support a wide range of optional SIC/DSIC interface
cards, providing various interfaces, such as synchronous/asynchronous serial interface, Ethernet
interface, E1/T1, ISDN BRI/PRI, ADSL, audio interface, and Layer 2 switching interface, and so on.
NOTE:
For an MSR 20-40 router, 4FSW/1FEA/1GEC/1ADSL/1ADSL-I can only be installed in Slot 2 or Slo
t
4.
Currently, MSR 20 routers do not support PoE and regard SIC-4FSW-POE and DSIC-9FSW-POE (if
used) as only ordinary Layer 2 switching modules.
ESM Module
High-performance network data encryption ESM module (ESM-ANDE)
Standard network data encryption ESM module (ESM-SNDE)
ESM module supports IPSec and by using hardware encryption expedites IP packet encryption. The use
of hardware encryption/decryption and hashing operation allows the router to encrypt packets with high
performance and reliability.
The encryption card is optional. On a router installed with an encryption card, the main control board
functions to route IP packets and implement encryption-enabled VPN, while the encryption card functions
to encrypt packets.
Table 8 Encryption card attributes
Attribute Description
Protocol IPsec
9
Attribute Description
Hardware encryption algorithm
Key algorithms: DES, 3DES, AES
Authentication algorithms: HMAC-MD5-96, HMAC-SHA-1-96
VPM and VCPM Module
VPM (Voice Processing Module) functions to implement the encryption/decryption, EC and CNG of
voices.
VCPM (Voice Co-Processing Module) processes the voice data in combination with VPM.
Voice co-processing module (RT-VCPM)
8-channel voice processing module (RT-VPM8)
16-channel voice processing module (RT-VPM16)
24-channel voice processing module (RT-VPM24)
32-channel voice processing module (RT-VPM32)
NOTE:
VPM/VCPM is only available on MSR 20-40.
10
Installation Preparations
Requirements on Environment
The MSR 20 routers are designed for indoor applications. To ensure the normal operation and prolong
their service life, the following requirements for installation site must be met.
Requirements on Temperature/Humidity
To ensure the normal operation and prolong their service life, certain requirements on temperature and
humidity in the equipment room shall be met. If the relative humidity is too high, the insulation materials
in it will deteriorate easily or even lead to electric leakage. Sometimes this will result in change to the
mechanical performance of the materials and rusting of the metal components. If the relative humidity is
too low, the fastening screw will become loosen due to shrinkage of the isolation spacer. In an
environment with dry climate, static electricity may be produced, putting the CMOS of the router to risk.
High temperature is of the greatest risk: for it will significantly degrade the router’s reliability, speed up
aging process of the insulating materials, and shorten the service life of the router.
The requirements on the temperature and humidity for MSR 20 are shown in the following table:
Table 9 Temperature/humidity requirements in the equipment room
Temperature Relative humidity
0°C to 40°C (32°F to 104°F) 5% to 90% (non-condensing)
Requirements on Cleanness
Dust is harmful to the safe operation of the Router. Dust on the chassis may result in static absorption, thus
causing poor contact of the metal connection components or points. Especially under the condition of
low indoor humidity, dust is easier to be absorbed.
The requirements on the dust concentration and diameter are shown in the following table:
Table 10 Limitation on dust content in equipment room
Diameter (μm) 0.5 1 3 5
Concentration
(particle/m³)
1.4 × 107
7 × 105
2.4 × 105
1.3 × 105
Besides the dust specifications, the equipment room of the Router should also meet the rigorous
requirements for the content of salt, acid and sulfide. These harmful gases could accelerate the metal
erosion and aging process of some parts. The specific limits of these harmful gases as SO
2
, H
2
S, NO
2
,
NH
3
and CI
2
are given in the following table.
Table 11 Harmful limits in equipment room
Gas Max (mg/m
3
)
SO2 0.2
11
Gas Max (mg/m
3
)
H2S 0.006
NH3 0.05
CI2 0.01
Requirements on Electrostatic Discharge Prevention
Although many antistatic considerations have been given to MSR 20, damage to the router’s circuit or
even the whole equipment may still happen when the static electricity exceeds the tolerance threshold.
In the communication network to which the routers are connected, static induction mainly comes from two
aspects: external electric fields such as outdoor high voltage power line or thunder and internal
environment like flooring materials or the whole equipment structure. Thus, the following should be
considered to safeguard the equipment against ESD.
Make sure that the equipment and the floor are well grounded.
The equipment room is dust-proof.
Maintain an appropriate humidity and temperature.
Wear an ESD-preventive wrist strap and uniform when contacting the circuit board.
Place the uninstalled circuit board on the antistatic workbench, with its face upward, or put it into
the static shielding bag.
When observing or removing the uninstalled circuit board, please touch the edge of the circuit
board, and avoid contacting the devices on it.
Requirements on Electromagnetic Environments
The interference sources, no matter where they come from, affect the routers with capacitance coupling,
inductance coupling, radiation of electromagnetic wave, common impedance (including the grounding
system) or conducting line (power line, signal line and transmission line etc.). So the following should be
considered:
Take effective measures to prevent the power system from being interfered with by the power grid
system.
Use an earthing system or lightning protection grounding different from that for the power supply
equipment and keep them as far as possible.
Keep the router far away from the radio launcher, radar launcher, and high-frequency devices
working in high current.
Use electromagnetic shielding when necessary.
Requirements on Preventing Lightning
Although many measures have been taken to protect MSR 20 from lightning, if the lightning intensity
exceeds a certain range, damage to the router may still happen. To protect the router from lightning
better, the following should be considered:
Ensure the PGND wire of the chassis is well grounded.
Ensure the ground point of the socket of AC power supply is well grounded.
12
To enhance the lightning protection capability of the power supply, a lightning arrester could be
installed at the input end of the power supply.
As for the signal line outdoors to which the interface modules of MSR 20 routers are connected,
such as ISDN line, telephone line, E1/T1 line, etc, a special lightning arrester should be installed
at the input end of the signal line to enhance the lightning protection capability.
Checking the Rack
When installing MSR 20 Routers, observe the following:
There is spacing reserved at the air inlet and outlet in the router so as to facilitate the radiation of
the router cabinet.
Make sure that the rack has a good ventilation system.
Make sure that the rack is sturdy enough to support the weight of the device and the installation
accessories.
Make sure that the rack is well-grounded.
Safety Precautions
Routers play a key role in data communications network. Please pay attention to the following:
WARNING: indicates that this operation is incorrect and may seriously damage the router or
endanger the operator. Please follow the correct operation procedures for sake of safety.
CAUTION: indicates that during the installation and usage of the router, the operation needs
attention. If this operation is performed incorrectly, it might affect the operation of the router.
When installing or working on the router, you are recommended to:
Keep the router far away from the heat sources and water/liquid.
Make sure that the router has been correctly grounded.
Wear an ESD-preventive wrist strap in installation and maintenance, making sure that the strap has
good skin contact.
Do not hot swap the interface modules and interface cards of the router.
Do not hot swap any cable.
Correctly connect the interface cable for the router. Do not connect the telephone cable (including
the ISDN cable) to the AUX port or the console port.
Use laser with caution. Do not directly stare into apertures or fiber-optic connectors that emit laser
radiation.
Adopt uninterrupted power supply (UPS).
Installation Tools and Meters and Equipments
Tools
Phillips screwdriver
Straight screwdriver
ESD-preventive twist strap
13
Cables
PGND wire and power cord
Console cable
Optional cables
Meters and equipment
Hub or LAN switch
Console terminal (it could be a PC)
Equipment related to the selected modules
Multimeter
CAUTION:
None of the above-mentioned installation tools, meters, and equipment are shipped with MSR 20 routers.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44
  • Page 45 45
  • Page 46 46
  • Page 47 47
  • Page 48 48
  • Page 49 49
  • Page 50 50
  • Page 51 51
  • Page 52 52
  • Page 53 53
  • Page 54 54
  • Page 55 55
  • Page 56 56
  • Page 57 57
  • Page 58 58
  • Page 59 59
  • Page 60 60
  • Page 61 61
  • Page 62 62
  • Page 63 63
  • Page 64 64
  • Page 65 65
  • Page 66 66
  • Page 67 67
  • Page 68 68
  • Page 69 69
  • Page 70 70
  • Page 71 71
  • Page 72 72
  • Page 73 73
  • Page 74 74
  • Page 75 75
  • Page 76 76
  • Page 77 77

H3C MSR 20 Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI