1. Carefully remove all parts from the box. Place on a clean, soft surface.
2. Remove mounting plate (B) from canopy (F) by removing collar
ring (G).
3. Install mounting plate (B) to junction box and secure with mounting
screws (C).
4. Feed electrical wires through bottom rod (J) and connect to fixture
body (K). Repeat for middle rod (I), connecting to bottom rod (J).
5. Feed electrical wires through top rod (H) and remove swivel ball (Q)
from top rod (H).
6. Let collar ring (G) and canopy (F) pass though top rod (H), then
secure swivel ball (Q) to top rod (H) and connect top rod (H) to
middle rod (I).
7. Hang fixture swivel ball (Q) to the center of mounting plate (B) and
secure with set screw (D) with provided wrench (E).
NOTE: Slide components down slowly to avoid damages.
8. Cut excess wires, being sure to leave enough to reach the junction
box. Separate wires, and strip insulation on each 5/8".
9. Wrap fixture ground wire (bare copper) around the green grounding
screw (see diagram 1). Tighten. Continue fixture ground wire and
connect to supply ground wire (usually green or bare copper) using
wire nut (A).
NOTE: It is imperative that the fixture is grounded.
Piaf Grande Two-Tier Chandelier
Item # TOB 5453
ASSEMBLY INSTRUCTIONS
This light fixture should be installed in accordance with all applicable,
local installation codes, and by a person familiar with the construction
and operation of it, as well as the hazards involved. Inspect item and
contents carefully. If any damage or defect is found, do not install.
Retain all packaging material until installation is complete and approved.
TOOLS REQUIRED (NOT INCLUDED):
Phillips Screwdriver Slotted Screwdriver Wire Cutters
Wire Strippers
NOTICE:
A
CB
G
Diagram 1
Bulbs not included
ED
Q
F
I
J
K
L
H
US
M
L
I
D
S
E
T