Primex RFoG Mounting System Installation guide

Type
Installation guide
Fit everything. Together.
PRIMEX
Installation Instructions
PRODUCT
MODEL CODE RFoG Mounting System
Limit RFoG access within an enclosure
FOR MORE INFORMATION CONTACT:
T
1.604.881.7875 F 1.604.881.7835
www.primex.com
The Primex Verge RFoG (ONU) Mounting System is a compact,
secure solution for protecting the RFoG component within a
Primex enclosure.
Designed to fit industry-standard RFoG’s, the snap lid and
screws safely limit access to fiber and coax connections while
storing fiber splices and slack.
125-1413: RFoG (ONU) Mounting System, white ABS
125-1475: RFoG (ONU) Mounting System, grey PC
STEP 1
STEP 4 STEP 5 STEP 6
STEP 2 STEP 3
Mounting system placement
Connect cabling Close lid Secure RFoG mounting system
452-XXXX
Be sure to route fiber through the top to
avoid pinching.
Attach fiber and coax. Use screws provided to secure lid and
reduce access.
Ensure lid freely opens and secure to MDE
with screws provided.
Can store up to 3ft of 2 or 3mm fiber outside
or 3ft of 0.125 or 0.900mm fiber inside.
Compatible with Commscope, Aurora and
Arris RFoG platforms.
Thread fiber around the tray Install RFoG unit
  • Page 1 1

Primex RFoG Mounting System Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI