For more information, please scan the barcode or visit beamcommunications.com/cellular
030182 R01
1. Antenna Installation
• DASH APPLICATION: Apply the Double Adhesive Pad to the BOTTOM side of the antenna
• WINDSCREEN APPLICATION: Apply the Double Adhesive Pad to the TOP side of the antenna
• Clean the mounting surface with the supplied Alcohol Wipe
• Apply the Antenna with Double Adhesive to the mounting surface and apply pressure for 30 seconds to ensure good adhesion
2. Cable Installation
• Keep away from heat and turning parts
• Use cable ties to anchor the cables
3. Selecting a location to install the MG200 LTE Gateway
• Locate a cool, dry, well-ventilated area away from any heat sources
• Check the LED light and connectors on the LTE Gateway are visible and accessible
• Ensure adequate clearance for the cabling
4. To install the MG200 LTE Gateway, refer to the MG200 LTE Gateway Quick Start Guide section 1-4. For power
connection, make use of the fused DC power cable supplied in the Beam MG200 LTE Gateway Kit.
5. Connecting Antenna cables to the MG200 LTE Gateway;
• Connect the RED CABLES to the CELL MAIN and CELL AUX ports.
• Connect the BLUE CABLE to the GPS port.
• Connect the WHITE CABLES to the Wi-Fi ports.
6. To complete the installation and conguration refer to the MG200 LTE Gateway Quick Start Guide section 5 and onwards.
BOTTOM
TOP