Beam MG200-FB20, MG200-FB10 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Beam MG200-FB20 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Installation Guide for Beam LTE Fixed Installation Bundle (MG200-FB10 / MG200-FB20)
Beam LTE932 10m Cable
(MG200-FB10 only)
Lightning
Arrestor
(not included)
Beam LTE933 20m Cable
(MG200-FB20 only)
OR
Installation Guide for Beam LTE Fixed
Installation Bundle (MG200-FB10 / MG200-FB20)
Applications
FARM BUILDING
For more information please visit: beamcommunications.com/cellular
Optimal Antenna Installation Location
Antenna front panel to face the service provider tower
Antenna must be installed with a separation distance
of at least 20cm away from all persons
Install under the cover of the lightning rod
Keep away from heat or fumes
Keep away from other antennas
N-Type
SMA
Beam MG200 LTE Gateway
Beam LTE720
Panel Antenna
2 x Beam LTE933 20m Cable
(MG200-FB20 only)
1 x Installation Guide1 x Beam MG200 LTE Gateway Kit
1 x Beam LTE720 Panel Antenna
2 x Beam LTE932 10m Cable
(MG200-FB10 only)
Package Contents
MINING INDUSTRIAL
10m 10m
20m 20m
OR
For more information, please scan the barcode or visit beamcommunications.com/cellular
030179 R01
1. To complete installation, refer to the Beam LTE720 Panel Antenna Installation Guide.
2. Connect and tighten the N-Type connector of the cable to the bottom of the antenna. When installing each antenna cable:
Tighten N-Type connector to each antenna cable with a xed or shifting spanner (18-20mm)
Route and restrain the cable to prevent it from vibrating or moving under normal conditions, this could result in
damage to the cable or its connectors
Protect the cable from chang or abrasions if the cable is in contact with a structure
If a cable needs to be bent, avoid kinking it and ensure that each bend radius follows the bend radius limit of 25.4mm
Use coaxial sealant, shrink-wrap tubing, electrical tape, or another suitable product to seal all cable connections
appropriately to prevent moisture and corrosion damage from weather exposure
Use insulation material to prevent rain or moisture from going into the building along with the LTE cable
3. Selecting a location to install the MG200 LTE Gateway
Locate a cool, dry, well-ventilated area away from any heat sources
Check the LED lights and connectors on the LTE Gateway are accessible to users
Ensure adequate clearance for cabling and Wi-Fi antennas
4. To install the MG200 LTE Gateway, refer to the MG200 LTE Gateway Quick Start Guide section 1-4.
WARNING!
The MG200 DC Power Source GND (and the grounding point) SHALL have the same voltage potential as the antenna. During
operation, the PWR should be always DC 9-36V higher than the GND.
5. Connect the SMA connector of LTE cable to the CELL MAIN and CELL AUX ports of the MG200 LTE Gateway.
WARNING!
Recommended: A Lightning Arrestor is tted on MG200 side.
6. To complete the installation and conguration refer to the MG200 LTE Gateway Quick Start Guide section 5 and onwards.
/