Allied Brass P1000-41-BB-24-ABR Installation guide

Type
Installation guide
18,24,30,36
2x 9/16" Glass Holes
Mounting Plate
1/8-27 NPS
1/8-27 Hex Nut
Backplate
Step 1:
Determine your desired location for installation and make 2 marks for the location for mounting.. Drill Ø9/16" hole at each of
the marks.
Drill Ø9/16" Holes into Glass Door
Mount Door Pull to Door as below.
Step 2:
Shower Door Towel Bar Mounting
Glass Door
Glass Door
Plastic Washer
Clear Vinyl Bushing
P1000-41BB
INSTALLATION INSTRUCTIONS
No portion of this document or any artwork contained herein should reproduced in any way without the written conset of ALLIED BRASS INC.
  • Page 1 1

Allied Brass P1000-41-BB-24-ABR Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI