Cal-Royal CAL-ROYAL VT49 Vinyl Thresholds Installation guide

Type
Installation guide

This manual is also suitable for

6605 Flotilla Street, City of Commerce, CA 90040 U.S.A.
Website: www.cal-royal.com | Email: [email protected]
Phone: (323) 888-6601 ; (800) 876-9258 | Fax: (323) 888-6699 ; (800) 222-3316
1. Measure door opening at the sill by measuring the
width of both rabbets.
2. Transfer measurement to threshold.
3. Cut the threshold to length. Notch ends of the
the threshold to fit around the stop on the door
frame as necessary.
4. Trail fit the threshold to verify proper fit. Cut down
if necessary.
Note: If using the threshold with carpet, insert carpet
first into the threshold opening before fitting it into
place at the sill.
5. Apply glue to concrete or plywood sub floors
before setting the vinyl threshold in place.
Installation Guidelines:
VT49 Vinyl Thresholds
VT49
Vinyl Thresholds
Top (plan) view of door opening (out-swing type)
interior
exterior
door
building
wall
door
rabbet
door
stop
door opening width
from rabbet to rabbet
interior
exterior
building
wall
threshold
trim ends of threshold to fit
around door jambs & stops
- Marker
- Measuring tape
- Caulking gun
- Cutting tools ( Miter saw,
circular saw, hacksaw)
Tools Required:
- transition where 3/8” carpet
meets 3/8” tile
Applications:
(71.20)
(19.05)
2”
(50.80)
4 1
  • Page 1 1

Cal-Royal CAL-ROYAL VT49 Vinyl Thresholds Installation guide

Type
Installation guide
This manual is also suitable for

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI