Zip Hydroboil HS105 Operating instructions

Category
Water heaters & boilers
Type
Operating instructions
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 1 of 12
Installation and Operating Instructions
Zip Hydroboil
Instant boiling water
HS001 Zip Hydroboil 1.5 Litre White 01552
HS003 Zip Hydroboil 3.0 Litre White 03552
HS005 Zip Hydroboil 5.0 Litre White 05552
HS105 Zip Hydroboil 5.0 Litre Stainless Steel 05551
HS007 Zip Hydroboil 7.5 Litre White 07552
HS107 Zip Hydroboil 7.5 Litre Stainless Steel 07551
®
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 2 of 12
Installation Checklist
Before Installation:
A. Read the instructions.
B. Note:Allttingsaresuppliedwiththeappliancekitexceptisolation
valveandpressurereductionvalve,whicharenotsupplied.
C. Checkthewaterqualitytodetermineifextraltrationwillbe
required.Apotablemainswatersupplymustbeused.
Tocombatthebuildupoflimescale,ahighperformanceinline
lter(notsuppliedasstandardequipment)maybeorderedfrom
yourZipserviceprovider.(SeeProductAccessoriespage4)
D. Checktheapplianceratingplateandensurecorrectpoweris
available for the appliance.
E. Checkthewallsupportingtheapplianceisadequateforthetotal
weightoftheappliance,whenfullofwater.
Before Commissioning:
1. Checktheunithasbeeninstalledcorrectly.
2. Checkallplumbingttingshavebeentightened.
3. Ensure the vent pipe is positioned to drain correctly.
4. Checkallelectricalconnectionsarecorrectandtherearenoloose
wires.
Commission:
7. Flush the supply line before connecting.
8. Turnonthewater,allowtollandcheckforleaks.
9. Turnonthepower.
WallmountedOver-sinkapplianceforinstantboilingwater.
Features:
Designedtooperatewithin1°Cofboilingpoint.
Temperaturecontrolsautomaticallycutoffthepowerintheeventof
temperaturecontrolfailure,boildrycutoutorablockedventpipe.
Incorporatingapulldowntapforprecisionfillingofcups,italsolocks
‘ON’ for filling pots.
Separatesthecoldwatersupplyfromtheboilingchamberandthe
internalcondensingsystemretainssteamwithintheheater.
Astainlesssteelcrevicefree,boilingchamberwithserviceaccess
portstopandbottom.
Hightemperaturethermalinsulationwithprovisionforserviceaccess
totheboilingchamber.
Concealedplumbingandelectricalconnections.
Choiceofstainlesssteelorwhiteenamelledsteelcase.
Description
Page 3 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Contents
Product Specifications / Accessories ...........................................................................................................................4
Read These Warnings First ..................................................................................................................................... 4 - 5
Installation Requirements ............................................................................................................................................. 5
Installation Procedures ........................................................................................................................................... 6 - 8
Step 1 – Positioning ................................................................................................................................. 6
Step 2 – Fastening ...................................................................................................................................6
Step 3 – Connecting ................................................................................................................................7
a)Plumbing ................................................................................................................................7
b)Venting...................................................................................................................................7
c)Electrical ................................................................................................................................7
Step4–Assembling ................................................................................................................................ 8
Tap Fitting ..................................................................................................................................8
Step5–Commissioning ......................................................................................................................... 8
Operating Procedures ..................................................................................................................................................8
Wall Mounting Template Dimensions ..........................................................................................................................9
Earth Continuity Verification / Wiring Diagram. ................................................................................................ 10 - 11
Problem Solving...........................................................................................................................................................11
Maintenance ................................................................................................................................................................11
Spare Parts ..................................................................................................................................................................11
End of life disposal ...................................................................................................................................................... 12
Warranty / Contact Details ..........................................................................................................................................12
NOTE:
Read all instructions and precautions before proceeding. If in doubt, or need further guidance, please call Zip on 0845 6 005 005.
Pleaseleavetheseinstructionswiththeenduserafterinstallation.
Thisunitmustbeinstalledinaccordancewithwatersupplybyelaws,currentIEEregulationsandrelevantlocalauthority
byelaws.
TheseproductsareapprovedtotheLVDandEMCdirectivesandCEendorsed.
ZipHydroboilhasbeenexamined,testedandfoundwhencorrectlyttedtocomplywiththerequirementsoftheUnited
KingdomWaterRegulations/Byelaws(Scotland).TheproductsarelistedundertheWRAS(WaterRegulationsAdvisory
Scheme)WaterFittingsandMaterialsDirectory.
ZipHeaters(UK)Ltdcannotbeheldliableforanydamagescausedbyfailuretoobservetheseinstructions.
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 4 of 12
Accessories:
Inline Filter
FL064 6”(Fortasteandodourremovalwithscalereduction)
Drip Tray
ZD001 StainlessSteel(withdrain)
ZD002 StainlessSteel(nodrain)
Cup Dispenser
ZE001 Stainless Steel
ZE002 White Plastic
ZE010 MugRack
Counter Stand
ZE004 For HS001
ZE006 Fot HS003
ZE007 For HS005, HS105
ZE008 For HS007, HS107
Tundish
ZD100 WallMountedChromeTundish
ZD101 SinkMountedChromeTundish
Water Block
HE45004Recommended;ttedintothesupplylinetominimisepotentialdamageintheeventofleakage.
Pressure Reducer
AQ3 Combinedpressurereducer(setat3.5bar)andlinestrainer.
Read These Warnings First
Product Specifications
Model Finish
Capacity
Litres
Delivery
Cups @ any
onetime
Recovery
Cups per
hour
Rating
kW@
230V
Width
mm
Depth
mm
Height
mm
Weight
Empty
Kg
Weight
Filled
Kg
HS001 White 1.5 9 100 1.5 289 180 335 7.0 10.0
HS003 White 3.0 18 100 1.5 289 180 431 8.0 12.5
HS005 White 5.0 30 140 2.4 318 198 465 9.5 16.5
HS105 s/steel 5.0 30 140 2.4 318 198 465 9.5 16.5
HS007 White 7.5 45 180 2.4 318 198 578 11.0 20.5
HS107 s/steel 7.5 45 180 2.4 318 198 578 11.0 20.5
Water Inlet Pressure: 0.07MPa(0.7bar)minimum/0.7MPa(7bar)maximum. Protection class IP23
WARNING: Situations that could cause injury to yourself or others.
CAUTION: Situationsthatcouldcausedamagetoyourapplianceorotherequipment.
NOTE: Notes,usagetipsoradditionalinformation.
IMPORTANT:
PLEASE READ THESE INSTRUCTIONS CAREFULLY.
NOTE THE SAFE OPERATIONAL REQUIREMENTS, WARNINGS AND CAUTIONS. USE THIS PRODUCT
CORRECTLY AND WITH CARE FOR THE PURPOSE FOR WHICH IT IS INTENDED. FAILURE TO DO
SO MAY CAUSE DAMAGE AND/OR PERSONAL INJURY, AND WILL INVALIDATE THE WARRANTY.
RETAIN THESE INSTRUCTIONS FOR FUTURE USE.
Page 5 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Installation Requirements
Beforeinstalling,ensurethatthefollowingareavailable:
a. Sufficientspacetopositiontheheatersothereisatleast150mmclearanceabovetheheaterforserviceaccess,
65mmtoitsleftand20mmtoitsrightthetapoutletusuallyshouldbepositionedatleast200mmaboveadraining
board or drip tray.
Read These Warnings First Continued
Safety
Thisapplianceisnotintendedforusebypersons(includingchildren)withreducedphysicalsensoryor
mentalcapabilities,orlackofexperienceandknowledgeunlesstheyhavebeengivensupervisionor
instruction concerning use of the appliance by a person responsible for their safety. Children should be
supervisedtoensurethattheydonotplaywiththeappliance.
Pleasereadallinstallationrequirements,installationproceduresandprecautionsbeforeinstallingany
ZipHydroboilinstantboilingwaterheater.
NeverattempttoinstallanyZipHydroboilinstantboilingwaterheaterwithoutreadingalloftheapplicableinstructions.
Careshouldbetakentoavoidtouchingthemetalbodyofthetapwhichcanbecomeveryhot.
InsomehardwaterareaswheremineralscaleaccumulationintheboilingchamberoftheZipHydroboilmaybecome
aproblem,considerationshouldbegiventothemaintenancerequired.Asuitableformofwatertreatmentmaybe
necessary.
Astheinstaller,itisyourresponsibilitytosupply(ifnecessary)andinstallallvalvesasrequiredbylocalregulationsand
relevant standards.
TheplumbinginstallationmustbedoneinaccordancewithlocalWaterAuthorityregulationsandtheseInstallation
Instructions.
This appliance must be earthed.
Ifthepowercableisdamageditmustberepairedonlybyaqualifiedtechnician.Toavoidhazards,allinstallation
proceduresmustbecarriedoutbyasuitablyqualifiedtradesperson.Thepowercableandpoweroutletmustbeinasafe
visible position for connection.
Thepowercablemustbeadequatelysecured.
Donotremovethecoveroftheheaterunderanycircumstanceswithoutfirstisolatingtheheaterfromthepowersupply.
Theappliance,itswiringandpipingmustnotbemodiedinanyway.
Theappliancemustbecompletelylledwithwaterbeforebeingswitchedon.
Incaseofmalfunctionisolatethepowersupplyimmediately.Incaseofleaksalsoisolatethewatersupply.Repairsmust
onlybecarriedoutbyZipHeaters(UK)LtdoranauthorisedZipserviceengineer.
Lifting
TakecarewhenliftingtheZipHydroboilunit.Someunitsmayexceedsafeliftinglimits.Ifyoufeelthisisbeyondyour
personalcapabilities,pleaseseekassistancewiththelift.Seespecificationsonpage4forweights.
Operating Conditions:
Theambienttemperaturesthisunitshouldoperatewithinis5ºC-50ºC.
Frostprotection:Ifthisheaterislocatedwhereambientairtemperaturecouldfallbelow5ºC;whentheheaterisnotin
use,donotturnofftheapplianceelectrically.Thissafeguardwillprotecttheunitfromfrostdamagebutdoesnotoffer
thesameprotectiontotheconnectingpipeworkandfittings.
Thisheaterisintendedonlyforindooruseandshouldneverbeinstalledoutdoorsorbeexposedtotheelementsofnature.
Thisunitmustnotbepositionedinanareathatmaybecleanedbyawaterjet.Thisunitmustnotbecleanedbyawaterjet.
Cleaning:
Hydroboil should only be wiped clean with a damp cloth. Never use abrasive cleaning agents or solvents on any
part of the Hydroboil, particularly the tap.
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 6 of 12
Before You Begin
Locatethepapermounting-holetemplatepackedwiththeheater.
Readtheinstallationandoperatinginstructionscompletely.
Decidewhethertoinstallwithconcealedorexposedplumbingand/orelectrical
connections. Concealed connections are preferred for superior appearance.
Step 1 – Positioning
Positiontheheatersothetapwilldrainontoadrainingboardordriptray.
Positionthebaseofthetaptobenotlessthan200mmabovethedraining
board(heightshouldbeincreasedonlyifessentialforfillinglargervessels).
Provideclearanceforserviceaccessofnotlessthan150mmtop,65mmleft,
20mmright.
Markcornerpositionsfortheheateronthewallsoastopositionthepaper
mounting-holetemplate.
Step 2 – Fastening
Positionmounting-holetemplateonwallanddrillholeswhereshown.
Drillholesforwaterinlet,ventoutletandwiringifrearaccessisintended.
Removecoverfasteningscrews(asshownbelow)fromheaterandliftwhole
cover off heater.
Installplumbingandwiringandpreparepipeendsandwiringendsasshown.
Screwheaterchassistothewallusingthesuppliedfixings,ensurethefixings
aresuitableforthesubstrate.Ifnotsupplyyourownsuitablefixings.
Ensurethemountingsurfaceiscapableofsupportingtheweightofthefilled
unit,fixingsmustbecapableofsupportingtheheaterweightwhenfilled.See
Productspecificationsforfilledweights.
Installation Procedures
COLD
INLET
VENT
OUTLET
INLET
POSITION
VENT
POSITION
MinimumClearanceinmm
b. Electrical supply.
Astandard13ampdoublepolefusedspuronthewallwithin1500mmof
the heater.
Isolationswitchesmusthaveacontactseparationofatleast3mminallpoles.
The circuit should be protected by a suitably rated RCD.
TheelectricalinstallationshouldcomplywithcurrentIEEregulationsand
anyLocalAuthorityrequirements.
c. Apotablecoldwatersupplywithaminimumworkingpressureof0.07
MPa(0.7bar)andamaximumworkingpressureof0.7MPa(7bar)
connected via an isolation valve.
d. Outletdrainagetoasinkdrainingboardortoadriptray.
e. Accesstodrainagefromaventsituatedatthebaseoftheheater.
f. Ifthewaterpressureislikelytoexceed0.7MPa(7bar),a0.35MPa
(3.5bar)pressurereducingvalvemustbeinstalledinthecoldwater
supply line.
g. Inallinstallationinstancesthewallsoftheheatermustbeverticalandthe
basehorizontal,therecanbenoexceptionstothisrule.
Installation Requirements Continued
Size Kw Amps
1.5 Ltr 1.5kW 13 A
3.0 Ltr 2.4kW 13 A
5.0 Ltr 2.4kW 13 A
7.5 Ltr 2.4kW 13 A
Concealed
Services
Exposed
Services
Front View
Page 7 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Installation Procedures Continued
Step 3 – Connecting
a) Plumbing
Forexposedplumbingconnection,connectthecoldwaterinletpipefromthe
baseoftheheaterdirectlytothe15mm(”)compressionfittingswiththenuts
and olives provided.
Forconcealedplumbingconnections,connectthecoldwaterpipethroughthe
rearofthechassisusinga15mm(”)capillaryelbow.
Coldwaterpipesmustbeflushedbeforeconnectiontotheinlet.Anyclogging
duetosedimentorfineswilladverselyaffecttheoperationoftheheater.
Theheatermustbeinstalledwithanisolatingvalvewhichallowsittobeisolated
fromthemainssupplyforservicing.
Water pressure requirements:
Minimum-0.07MPa(0.7bar)Maximum-0.7MPa(7bar).
Caution:Ifpressureislikelytoexceed0.7MPa(7bar),apressurelimitingvalve
mustbeinstalledinthecoldwatersupplyline.Ziprecommendsavalveratedat
3.5bar(0.35MPa)forthisapplication(ZippartNo.AQ3).
b) Venting
Aventatthebaseoftheheatermustbeplumbedtoasafevisiblelocationas,
undercertainconditions,itmaydischargecoldorboilingwaterand/orsteam.
Forexposedventplumbing,connectventoutletfromthebaseofheatertoa
15mmorhalfinchODpipewhichhasacontinuousfall,isnomorethan3
metreslong,hasnomorethan3rightanglebends,anddischargestoawaste
waterdrain.
Forconcealedventplumbing(Fig.a),connectplumbingtotheventoutletfrom
theheaterrearusingacapillaryelbowprotruding45mmfromthewall.The
plumbingmustthenbedirectedtoatundishthatmustbeinavisiblelocation
beforebeingplumbedawaytowaste.
Alternativelyattachthetundishtothewall(Fig.b)andplumbawaytowaste.
c) Electrical
Forconcealedelectricalconnection,runthepowercablethroughtherear
accessopeningoftheheatertotheterminalblockwithintheheater.
Forsurfacemountinstallationrunthepowercablethroughthecableentry
glandatthebottomoftheunittotheterminalblockwithintheheater.Ensure
thecableisfirmlysecured.
Isolationswitchesmusthaveacontactseparationofatleast3mminallpoles.
Do not turn the power ONuntilwaterflowsfromthetap.
250mm
Wiring
Fig. a
Concealed
Vent
Concealed
Inlet
45mm
Fig. b
VisibleTundishVentline
Surfacemount
cable entry
TerminalBlock
Concealed
cable entry
Approximate Weights When
Filled
1.5Litremodels 10kg
3.0Litremodels 12.5kg
5.0Litremodels 16.5kg
7.5Litremodels 20.5kg
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 8 of 12
Installation Procedures Continued
Step 4 – Assembling
Positionthecasingbackontotheheaterandsecurewiththetwotopandtwo
bottomTorxscrews.
Tap Fitting
Caution! To ensure correct fitment of the tap assembly, follow the
instruction a to c below carefully.
Removetheblackplasticcapfromthehotoutlettube.PTFEtapehasbeen
pre-appliedtothehotoutlettube(checkitisingoodconditionbefore
proceeding).
IfnotremovethedamagedPTFEtapeandcarefullyapplytwotothreecomplete
turnsofnewPTFEtapeontothethreadsinaclockwisedirectionasshown
alongside.
a. Screwthetapassemblyclockwiseontothetapoutlettube.
b. Continueturningclockwiseuntilthetapassemblyjusttouchesthefascia
withoutpressure.
c. Continuetoturnthetapuptoonefullturnmaximumuntilthetapleveris
intheuprightposition.(Donotforcethetapupright;ifyoucannotgetthe
taptotheuprightpositionwithoutapplyingundueforce,removethetap,
startthethreadinanewpositionorapplyafewmoreturnsofPTFEand
repeat the procedure.
Step 5 – Commissioning
Checkprevioussteps.TurnwatersupplyON.Waterisnowflowingintothe
heater,checkallconnectionsforleaks.Waitapproximately5minutesand
checkoutlettapforwater.Thisisachievedbypullingthetaphandleforward.
Do Not turnonthepoweratthisstage.
Ensurethetaphandleiscorrectlyadjustedtoitsoptimumposition.
Screwtheredknurledcapclockwiseuntilhandtightwithoutusing
excessiveforceoratoolofanykind.
Slowlyunscrewtheknurledcapanti-clockwiseuntilthetapstartstodrip.
Tightentheknurledcapahalfaturnclockwise.Thedrippingwillstopand
thetapwillbesetattheoptimumposition.
Whenthetaphasbeenadjustedandtheunitisfullofwaterturnthepoweron.
Thelightinthetapfasciawilllighttoshowpowerison.
Afterashortperiod,boilingwaterwillbeavailableandwillbemaintainedclose
toboilingpointthereafter.Initialheatingperiodsareshowninthetableontheleft.
Tap Operation
ZipHydroboilisfittedwithatwo-waytapforinstantboilingwater.
Care should be taken not to touch the metal body of the tap which can
become very hot.
Forinstantboilingwater,gentlypullthetapleverforward.Boilingwaterwill
flowuntilthetaphandleisreleased.
Thisoperationgivesfingertipflowcontrolforsafefillingofcupsandmugs.
To fill larger vessels such as teapots and saucepans, rotate the lever 180
degreesanddepressituntilitlocksintoahorizontalposition.
Boilingwaterwillflowuntiltheleverisreturnedtoitsnormalverticalposition.
Thisoperationallowsthevesseltobefilledwithoutholdingyourhandwhereit
maybeaffectedbysteam.
Operating Procedures
Inletwater
temperature
15°C 10°C
1.5Litremodels 10min 11min
3.0Litremodels 16min 17min
5.0Litremodels 16min 17min
7.5Litremodels 23min 24min
o-ring
Page 9 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Template Dimensions
38mm
1.5-3.0L
53mm
5.0-7.5L
65mm
Clearance
56mm
POSITIONING PIN
ELECTRICAL WIRING POSITION
COLD INLET POSITION
CONCEALEDVENTPOSITION
72mm
15
25
35mm 42mm
COLD
INLET
VENT
BENCH TOP
38mm
1.5-3.OL
53mm
5.0-7.5L
19mm
20mmClearance
200mmClearance
150mm
Clearance
274mm(1.5&3.0L)
304mm(5.0&7.5L)
318mm1.5L
416mm3.0L
448mm5.0L
561mm7.5L
Warning:Thisappliancemustbeearthed.
Followingremedialservicetheearthingcontinuityoftheheatermustbecheckedby
aqualifiedtechnicianusinganappliancetester,orcontinuitytesterofaccuracyClass
5 or better. Class 5 denotes an accuracy of 5% full scale deflection.
1. Isolatepowersupply.
2. Setmeterto0ohmwithleadsconnectedtogether.
3. Connect one test lead to the earth pin on the three pin plug.
4. Connect the other test lead to a bare patch of metal (preferably on the
edge) of the top of the cover, then to the front cover of the unit, and
then to the tap top under the plastic paddle. This can be achieved by
inserting the probe up from behind the paddle without losing water.
Warning:Thewatermaybeboiling-showextracare.
5. Testthatineveryinstancetheelectricalresistancedoesnotexceed1ohm.
Earthing Continuity Verification & Electrical Diagram
If required, an earth continuity test
canbeperformedbytestingbetween
the earth pin on the products lead and
aexposedpieceofmetalonthecase
and the tap body.
Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01 Page 10 of 12
Problem Solving
Maintenance / Cleaning
SINGLE ELEMENT UPTO 3kW
WITH 1 POLE THERMAL O/LOAD
THERMOSTAT CONTROLLED
RESET
T.O.L.
T. STAT.
ELEMENT
ASSY.
LIGHT
FASCIA
T.O.L.
85741
BLACK
WHITE
BROWN
BLACK
N
WHITE
BLUEBLUE
Neutral wire
must be connected
at Terminal block
as shown.
10-5-07: 2.4kW was originally 3.6kW.
Change was as per B.C.'s mark-up.
L
N
SINGLE ELEMENT UPTO 3kW
WITH 1 POLE THERMAL O/LOAD
THERMOSTAT CONTROLLED
RESET
T.O.L.
T. STAT.
ELEMENT
ASSY.
LIGHT
FASCIA
T.O.L.
85741
BLACK
WHITE
BROWN
BLACK
N
WHITE
BLUE BLUE
Wiring Diagram
SingleElementupto3kWwith1Pole.
T.O/L:ThermalOverLoad.
ThermostatControlled
Symptom Possible Cause Solution
Failstodispensewater.
Water isolating valve turned off. Checkisolationvalveisturnedon.
Blockedfilterormetertube.
Contact Zip authorised agent.
Blockedstrainer.
Jammedballvalveassembly.
Airlockintransfertube.
Water not boiling.
Nopower. Checkpowersupply.
Faultythermostat,elementorcutout. Contact Zip authorised agent.
Runsoutofboilingwaterandfailstorefill.
Internaladjustment. Contact Zip authorised agent.
Outlet tap drips.
Overflowfromvent.
Excessivesteamfromvent.
Power“on”butnoheat.
Overloadrepeatedlytrippingwithexcessivesteam.
Overloadrepeatedlytrippingwithoutexcessive
steam
Formaintenanceandsixmonthlysafetychecks,pleaserefertothePreventativeMaintenancesheetNo.85695included
withtheHydroboil.
Maintenance should be carried out by a Zip authorised technician.
Cleaning Case: Do not use strong, corrosive, spray or abrasive cleaners.
Cleanthecasewithasoftclothorbrushandmildsoapandwater.
T.O/L
T.O/L
Page 11 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Spare Parts
Key Part No Description
1 SP90487 Cisternlidclampkit
2 SP90488 Cisternlidgasketkit
3 SP90490 Gasketkit
4 SP90083 Floatvalvekit,withfloat
5 SP90069 Jumpervalvekit,withseals
6 SP90102 Cistern float
7 SP90493 Transfertubekit–1.5kW
7 SP90494 Transfertubekit–2.4kW
7 SP90531 Transfertubekit–3kW
8 SP90495 Banjoscrew
9 SP90496 O-ringkitcomplete
10 SP90517 Fascia&lenskit
11 SP90110 Fascialightkit
12 SP90081 Thermostatkit1.5–25litres
13 SP90127 Overloadkit,otherHSmodels
14 SP90501 Taptopkit
15 SP90502 Tapassemblycomplete
16 SP90503 Strap&keykit1.5–3litres
Key Part No Description
16 SP90504 Strap&keykit5&7.5litres
17 SP90505 Tapnutkit
18 SP90506 Tapextension
19 SP80563 Elementkit1.5kW110v1.5&3litres
19 SP90485 Elementkit1.5kW240v1.5&3litres
19 SP90486 Elementkit2.4kW240v5.0&7.5litres
20 SP90491 Cleaningholecoverkit
21 SP90492 Draincap&sealkit
 SP90522 Cisternjetnozzlekit
 SP90132 Hottanklid&gasketsfor5&7.5litres
 SP90131 Hottanklid&gasketsfor1.5&3.0litres
SP90130 Lid clips
 SP81230 TapFlowrestrictor
SP88296 Cisterntank1.5–7.5litres
 SP88490 CisternTankGrommetKit
 SP88394 3LMaintankcomplete
SP88264 5LMaintankcomplete
SP88381 7.5LMaintankcomplete
Page 12 of 12 Zip Hydroboil - Installation & Operating Instructions - 85264 - May 2013 v1.01
Head Office
ZipHeaters(UK)Ltd
14 Bertie Ward Way
Dereham
NorfolkNR191TE
Website:www.zipheaters.co.uk
Telephone: 0870 6 005 005
Facsimile:01362692448
CertainwarrantiesmaybeimpliedbylawintoyourcontractwithZip.The
warrantyprovidedbelowisadditionaltotheseimpliedwarrantiesandnothing
setoutbelowshalllimityourstatutoryrightsorrightsatlaw.
ZipHeaters(UK)Ltdwarrantsthat,shouldanypartfailwithin24calendar
monthsofinstallation,thatpartwillberepairedorreplacedfreeofchargeby
ZiporitsDistributororServiceProvider,exceptassetoutbelow,provided
theapplianceisinstalledandusedstrictlyinaccordancewiththeinstructions
supplied,andthatfailureisnotduetoaccident,misuse,abuse,unsuitable
waterconditions,ortoanyalteration,modificationorrepairbyanypartynot
expresslynominatedbyZip.
Nocostsarepayablebythecustomerotherthananymileageortravelling-time
chargesincurredbyaZipServiceProviderorthecostofremoval,cartageand
re-installationofanycomponentoftheapplianceifitneedstobereturnedfor
repair to Zip or its Distributor.
Thiswarrantydoesnotcoverdamageresultingfromnon-operationofthe
appliance,theuseofnonauthorisedpartsorconsequentialdamagetoany
other goods, furnishings or property.
Nowarrantyappliestothelifeofanyfiltrationcartridgeinstalledwiththe
applianceascartridgelifemayvaryaccordingtowaterqualityandtherateof
waterconsumption.
Zipdoesnotexclude,restrictormodifyanyliabilitythatcannotbeexcluded,
restrictedormodifiedorwhichcannot,excepttoalimitedextent,beexcluded,
restrictedormodifiedasbetweentheowneroruserandZipunderthelaws
applicable.
Furthermore,thiswarrantydoesnotdisplaceanystatutorywarranty,but,tothe
extenttowhichZipisentitledtodoso,theliabilityofZipunderanystatutory
warrantywillbelimitedatZip’soptiontothereplacementoftheappliance
orsupplyofequivalentappliance,thepaymentofthecostofreplacingthe
applianceoracquiringanequivalentappliance,orthepaymentofthecostof
having the appliance repaired or the repair of the appliance.
Registering Your Purchase
RegisteringyourZipinstallationontheZipwebsitemayhelptoestablishdate
ofinstallationshoulditbecomenecessarytoservicetheapplianceunderterms
oftheZipwarranty.Toregisteryourinstallationgotowww.zipheaters.co.uk
andlookundertheheading“Warranty”.
As Zip policy is one of continuous product improvement, changes to
specificationsmaybemadewithoutpriornotice.Imagesinthisbooklethave
beenmodifiedandmaynotbetruerepresentationsofthefinishedgoods.
End of life disposal
Warranty Information
Theuseofthiscrossedoutwheeledbinlogoindicatesthatthisproductneedstobedisposedof
separatelytoanyotherhouseholdwaste.
WithineachoftheEuropeanUnionmembercountries,provisionshavebeenmadeforthecollection
andrecyclingofunwantedelectricalandelectronicequipment.
Inordertopreserveourenvironmentweaskthatyoudisposeofthisproductcorrectly.
PleasecontactZipCustomerServiceforadviceon08456005005.
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12

Zip Hydroboil HS105 Operating instructions

Category
Water heaters & boilers
Type
Operating instructions

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI