Newport Brass 35-28/20 Installation guide

  • Hello! I am an AI chatbot trained to assist you with the Newport Brass 35-28/20 Installation guide. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Installation Instructions
Towel Bar & Tissue Holder
Model No. 34-02, 34-05, 34-28,
35-02, 35-05, 35-28
1. Using the table below, measure the appropriate distance between post centers.
(See Fig. 1)
Note: Hole locations should be level.
· 24" Towel Bar - 24"
· 24" Double Towel Bar - 24"
· Tissue Holder - 7 1/4"
2. Drill hole(s) in wall at points marked using the appropriate drill size:
· Wood Screw (#6 x 2”) - use: 3/32" Drill
· Toggle Screw (6-32 x 3”) - use: 3/8" Drill
3. Fasten FLANGE (1) to wall using either WOOD/TOGGLE SCREW (3). Engage
POST (2), into FLANGE (1). Complete engagement of POST (2) height is 2" from
mounting surface. Secure POST (2), into place by tightening SETSCREW (4), on
FLANGE (1). (See Fig. 2)
4. Place ESCUTCHEON (3), onto FLANGE (1), place BONNET (4) over POST (2)
and against ESCUTCHEON (3). (See Fig. 3)
5a. Towel bar: Insert BAR(S) (2) into END POST(S) (1). Slide END POST (1) into
BONNET (3). Secure into place with SCREW (4). Place O-RING (5) onto END CAP
(6) and press into END POST (1). (See Fig. 4 & 5)
5b.Tissue Holder: Slide END POST (1) into BONNET (3). Secure into place with
SCREW (4). Place O-RING (5) onto END CAP (6) and press into END POST (1).
Place HOLDER (7) between END POSTS (1). (See Fig. 6.)
Distance
between posts
Fig. 1
Fig. 3
4
3
1
2
(949)417-5207
AMS-34-02 Santa Ana CA 92705 9/13/2011
www.brasstech.com
Fig. 6
1
2
3
1
4
3
1
3
4
6
7
5
6
2
5
Fig. 4
Fig. 5
4
5
6
2”
Fig. 2
4
1
2
3
Recommended Installation by a Professional Contractor
/