Wolf SEW-1-300 Installation Instructions Manual

Type
Installation Instructions Manual
WOLF GMBH / POSTFACH 1380 / D-84048 MAINBURG / TEL. +49.0. 87 51 74- 0 / FAX +49.0.87 51 74- 16 00 / www.WOLF.eu
Document no.: 3064300_201703 Subjecttotechnicalmodications
GB
Installationinstructions
DHWcylinderforheatpumps
CEW-1-200 / CEW-2-200
SEW-1-300 / SEW-1-400
SolarDHWcylinder
SEM-1W-360
CPM-1-70buffermodule
SPU-1-200buffercylinder
2
3064300_201703
Tableofcontents
Contents ....................................................................................... Page
Information,positioningandinstallation
1. Safety information / standards ........................................................................4
2. General information .........................................................................................5
3. Technical information .................................................................................. 6-7
ProductdescriptionHydrotower(CEW-1-200+CPM-1-70)
4. Appliance description CPM-1-70 / CEW-1-200 ...............................................8
5. Transport .........................................................................................................9
6. Minimum clearances CPM-1-70 ....................................................................10
7. Combinations with CEW-1-200 .....................................................................11
8. Dismantling / assembling the CPM-1-70 casing ...........................................12
9. Fitting the CPM-1-70 to the CEW-1-200 .......................................................13
10. Pipework connection diagrams for CPM-1-70 as cylinder in series ..............14
11. Pipework connection diagrams for CPM-1-70 as separating cylinder ...........15
Productdescription–Splitheatingcentre
(BWL-1S(B)-07/10/14+CEW-2-200)
12. Appliance description CEW-2-200 ................................................................16
13. Minimum clearances for split heating centre .................................................17
14. Combination BWL-1S with CEW-2-200 .........................................................18
15. Connection CEW-2-200 ................................................................................19
16. Installation BWL-1S(B) on CEW-2-200 ................................................... 20-22
ProductdescriptionSPU-1-200,SEW-1-300/400,SEM-1W-360
17. Appliance description SPU-1-200 .................................................................23
18. Appliance description SEW-1-300/400..........................................................24
19. Appliance description SEM-1W-360 ..............................................................25
Specication
20.SpecicationCPM-1-70/7(8),CEW-1-200 ....................................................26
21.SpecicationCEW-2-200 ..............................................................................27
22.SpecicationSEW-1,SEM-1 .........................................................................28
23.SpecicationSPU-1-200 ...............................................................................29
3
3064300_201703
Contents ....................................................................................... Page
Pipeworkconnection
24. Pipework connection SEW-1-300/400 SEM-1W-360 ....................................30
25.PipeworkconnectionCEW-1-200,CEW-2-200 .............................................31
26. Pipework connection SPU-1-200 ..................................................................32
Performancecurves
27.Performancecurves,heat-uptimes–Wolf3-waydivertervalve ..................33
28. Performance curves SEW-1-300 ...................................................................34
29. Performance curves SEW-1-400 ...................................................................35
30. Performance curves SEM-1W-360 ................................................................36
31. Performance curves CEW-1-200 and CEW-2-200 ........................................37
32. Performance curves 7m / 8m pumps ............................................................38
33.Congurationexample ..................................................................................39
Commissioning+maintenance/accessories/troubleshooting
34. Commissioning / maintenance ......................................................................40
35. Electric booster heater ..................................................................................41
36.Troubleshooting–buffermoduleCPM-1-70,buffercylinderSPU-1-200 ......42
37.Troubleshooting–DHWcylindersCEW-1-200,SEW-1,SEM-1W ...............43
4
3064300_201703
1. Safetyinformation/standards
Safetyinformation Thefollowingsymbolsareusedinthisdescriptiontohighlight
importantinformationconcerningpersonalsafetyandoperational
reliability:
Denotes instructions with which you must strictly comply to prevent risk or
injurytoindividuals,faultsordamagetotheappliance.
Denotes danger due to 'live' electrical components.
"Note"indicatestechnicalinstructionsthatmustbeobservedtoprevent
malfunctionorappliancedamage.
Please note
Beforecommissioningtheappliance,pleasereadcarefullythroughthefollowing
installation and commissioning instructions. This will avoid damage to your
system which could arise through incorrect handling.
Improperuseandanyunauthorisedmodicationsmadetothedesignorduring
installationwillresultinanyliabilityclaimsbeingexcluded.
Inparticular,observeengineeringstandards–inadditiontoanyspecicnational
regulations.
DIN 1988: Technical rules for drinking water installations
DIN 4751: Safety-related equipment of heating systems
DIN 4757: Solar heating plants / solar thermal systems
DIN 4753: Water heaters and DHW heating systems for drinking and
process water; requirements, designation, equipment and
testing
DIN EN 12828 Central heating systems in buildings - Designing hot water
heating systems
DIN 18380: CentralheatingsystemsandDHWheatingsystems
DIN 18381: Installationofgas,wateranddrainagepipeworkinsidebuildings
VDI 2035: Prevention of damage in water heating installations
Drinking Water Ordinance [Germany]
The illustrations used are symbolic. Due to the possibility of typographical
andprintingerrorsandtheneedtomakeon-goingtechnicalmodications,
we accept no liability for the accuracy of the contents of this document.
Should any information in these installation instructions contradict
anycurrentnationalregulations,thecurrentnationalregulationstake
precedence.
Please refer to the currently applicable version of the general terms and
conditions.
Standards
5
3064300_201703
Theheatpumpsystemmustbesited,installed,set-upandcommissionedby
aqualiedcontractor,incompliancewiththeapplicablestatutoryregulations,
ordinances and directives and the installation instructions.
Inparticular,observetheDrinkingWaterOrdinance[Germany].
Maintenanceworkmustonlybecarriedoutbyaqualiedheatingcontractor.
RegularmaintenanceandtheexclusiveuseoforiginalWolfsparepartsare
crucial for trouble-free operation and a long service life for your appliance.
We therefore recommend you arrange a maintenance contract with your local
heating contractor.
AsignicantamountofenergycanbesavedbyoperatingtheDHWcylinder
at a temperature below 55 °C.
The ideal operating temperature range is 50 - 55 °C.
Heatlossesandscalingaresignicantlyreducedinthisrange.
WolfheatpumpsrequirespecialDHWcylindersfordomestichotwaterheating;
these are available from the Wolf range of accessories.
ThecylindersaremadeofS235JRsteelandcomewithaqualitycerticate.
The indirect coil surface area in the DHW cylinders must be at least
0.25m²perkWofheatingoutput.
Theappliancemayonlybeopenedbyaqualiedcontractor.
Beforeopeningtheappliance,allcurrentcircuitsmustbeisolatedfromthe
power supply (only for CPM-1).
Never treat appliance surfaces with scouring agents or cleaning agents
containing acid or chlorine.
For installation in Austria:
Observe the ÖVE regulations and requirements and those of your local
power supply utility.
Observethespeciedelectricalfuseratings(seeSpecication).
Only replace faulty components with original Wolf spare parts.
AnydamageorlossresultingfromtechnicalmodicationstoWolfcontrol
unitsisexcludedfromourwarranty.
IftheDHWtemperatureissetabove60°Corwhenpasteurisingata
temperatureinexcessof60°C,alwaysensurethatcoldwaterismixedin
with the hot (risk of scalding).
Risk of water damage and faulty operation through freezing.
The heat pump is automatically protected from frost when it is switched on.
Observe the Drinking Water Ordinance [Germany].
2.Generalinformation
Thefollowinginformationmustbetakenintoaccountwhencarryingout
installation,commissioning,maintenanceandrepairwork:
6
3064300_201703
3.Technicalinformation
Hot/coldwaterconnectionfor
oor-standingDHWcylinder
TheDHWcylindermustbeconnectedinaccordancewiththefollowingpipework
diagram.
Thereshouldbenoshut-offsysteminstalledbetweentheoor-standingDHW
cylinder and the safety valve.
Ifthecylinderisconnectedtothehotandcoldwaterconnectionswith
non-metallicpipematerials,thecylindermustbeearthed.
Installingdirttrapsorothermodicationswhichconstricttheconnecting
linebetweentheoor-standingDHWcylinderandthesafetyvalveisnot
permitted.
- Observe the connection thread types:
 - Flatgasketconnections(typeG),suchascoldwaterandDHWconnections:
Thesemustbettedwithaatgasket.
- Thread-sealing connections (type R): Using too much sealing material (e.g.
hemp),resultsinexcessivestressontheconnection.Thiscanresultinthe
enamel cracking. Make sure the thread between cylinder connection and
pipework is fully covered.
- ThecoldwaterandDHWconnections maycontainplasticsleeveinserts.
These must remain in the cylinder. Do not pull them out before installation.
Whenselectingtheinstallationmaterialforthesystem,observeengineering
standardsandanypossibleelectro-chemicalprocesses(mixedinstallation). The
cylindercanbeequippedwithanelectricboosterheaterwhichisttedwitha
highlimitsafetycut-out.Intheeventofamalfunction,thehighlimitsafetycut-
outdeactivatesfurtherheatingwhenamax.temperatureof110°Cisreached.
Therelevantconnectionsmustbedesignedforthistemperature,orelse
thetemperaturemustbelimitedbymeansofamixingvalve.
ItisgenerallyrecommendedthatDHWtemperaturesabove60°Carelimited
to60°Cbymeansofamixingvalve.
Hotwatercancauseinjuries,inparticularscalding.
Please note
Please note
Please note
Connectiontotheheatingsystem Thecylindermustbeequippedwithitsownsafetydevices(safetyvalve,
expansionvessel)ifitcanbeshutofffromtheheatingsystemorifthe
existingcomponentsarenotdesignedfortheadditionalbuffervolume.
Installingdirttrapsorothermodicationswhichconstrictthesupplylineto
the safety valve is not permitted. When selecting the installation material
forthesystem,observeengineeringstandardsandanypossibleelectro-
technicalprocesses(mixedinstallation).
Please note
Siting Thecylindersmayonlybeinstalledinroomswhichareprotectedfromfrost,
otherwisethecylinderandallwater-carryingttingsandsupplypipesmustbe
drained if there is a risk of frost.
Theformationoficeinthesystemmayresultinleaksandcould
destroythecylinder.
The installation room must provide enough space for maintenance and repair
workandthegroundmusthavesufcientload-bearingcapacity.
Drinkingwaterlter
Werecommend the installationofadrinkingwaterlterintothecold water
supply,asforeignbodiesintroducedintothesystemcanblockttingsandmay
lead to pipe corrosion.
Please note
7
3064300_201703
Expansionvessels All expansion vessels must be tted so that they can be isolated from the
heating system.
Shut-off systems must be sufciently secured against unintentional closing
(e.g. by means of a cap valve with wire and seal).
DiaphragmexpansionvesselsmustcomplywithEN13831.
Expansionvesselsmustbeinstalledinfrost-freeroomsorprotectedagainst
freezing.ExpansionvesselsmustbedesignedtoDINEN12828.
Drainoutlet Theoor-standingDHWcylinder/buffercylindermustbeinstalledtoenable
it to be drained as fully as possible.
Pleasenote:Whendrainingthesystem,hotwatermayescapeand
causeinjury,inparticularscalding.
Venting The cylinders are equipped with a 1" or 1¼" socket in the top centre for the
purpose of venting.
Thermalinsulation
Donotbringre,solderamesoroxy-acetylenetorchesintothe
vicinityoftheinsulation.
Pleasenote:Riskofre.
Pressurereducer The installation of a pressure reducing valve is recommended. The permissible
operatingpressureoftheDHWcylinderis10barontheDHWside.Ifthesupply
networkisoperatedatahigherpressure,apressurereducermustbeinstalled.
Exceedingthepermissibleoperatingpressuremayresultinleaksand
coulddestroythecylinder.
Toreduceownoiseinsidebuildings,thelinepressureshouldbesettoapprox.
3.5 bar.
Safetyvalve(SV),heatingwaterside
Only one individually tested SV may be used. The response pressure must be
suitableforallsystemcomponentsandmaynotexceed3bar.
Exceeding the permissible operating pressure may result in
leaksandcoulddestroythecylinder.
TheSVis designed to DINEN12828,DIN 4753 and DIN1988. Forthis,a
heating output of 1.5 kW for each collector is assumed.
Totalheatingoutput
(boiler+collector)
Nominaldiameter
50 kW DN 15
100 kW DN 20
200 kW DN 25
350 kW DN 32
The discharge pipe must have a diameter at least equal to the outlet cross-
sectionofthesafetyvalve,itmustnothavemorethan2elbowsandmustbe
no more than 2 m long. If it is absolutely necessary to have 3 elbows or a pipe
lengthofupto4m,thenominaldiameteroftheentiredischargepipemustbe
implemented one nominal diameter size larger. More than 3 elbows and a pipe
length above 4 m are notpermitted. The discharge pipe must be installed with
a fall. The drain pipe downstream of the tundish must have a diameter at least
twice as big as the valve inlet diameter. Place a sign close to the safety valve
discharge pipe with the following inscription:
"Forsafetyreasons,waterisdischargedfromthedischargepipe
duringheating.Donotcloseoffthedischargepipe".
Please note
Sizingofthesafetydevices
3.Technicalinformation
Ensure that the cylinder's packaging, and that of any accessories used, is
disposedofcorrectly.Packagingiscollectedbyourcertieddisposalpartners.
Disposal
8
3064300_201703
4.AppliancedescriptionCPM-1-70/CEW-1-200
CEW-1-200DHWcylinderwithinternalindirectcoil.
Steel cylinder with corrosion protection provided by special enamelled
coatingontheinnerwallofthecylinder,complianttoDIN4753.Additional
corrosionprotectionprovidedbysacricialmagnesiumanode.DHWcylinder
forDHWheatinginconjunctionwithaheatpump.
SuitableforsystemstoDIN1988,EN12828andDIN4753.
DimensionsanddesignaretailoredtotheWolfheatpumprange,enabling
variable combination.
TheDHWcylinderisequippedwithahighlyefcientbare-tubeheat
exchangerwithindirectdualcoilforconvenientDHWheating.
The PU rigid foam insulation ensures minimum radiation and standby heat
losses.
CEW-1-200
The dimensions and design of the buffer module CPM-1-70 are tailored to
theWolfheatpumprange,enablingvariablecombination.
The CPM-1-70 is supplied ready for connection as a separating cylinder or
cylinderinseries.Itisdesignedtoprovideoptimumevaporatordefrosting,in
particular for the BWL-1 air/water heat pumps.
Whenconnectedasaseparatingcylinder,italsoactsasalowlossheader.
AclassAhigh-efciencyheatingcircuitpumpandthree-waydivertervalve
forDHWheatingarealreadyinstalledinsidethecasing,includingthe
necessarypipework,readyforconnection.TypeCPM-1-70/7with7mpump
and type CPM-1-70/8 with 8m pump.
The PU rigid foam insulation ensures minimum radiation and standby heat
losses.
Apre-installed,thermallyinsulatedsafetyassemblyissuppliedforon-site
installation.
CPM-1-70
StandarddeliveryCPM-1-70
Packagedinbox,fullyencased,
classAhigh-efciencypumpand
3-waydivertervalvewithallnecessarypipework,
readytoconnect,incl.installedboilerdrain&llvalve,
adjustablefeet,installedsensorwellandventvalve;
safety assembly and connecting cable for 3-way diverter valve
andhigh-efciencypumpprovided,
connecting pipe for separating cylinder version with heat pump
returnowincluded,
installation instructions included.
Standarddelivery CEW-1-200
Packagedinbox,fullyencased,readyfor
connection,incl.installedboilerdrain&llvalve,
adjustable feet and installed sensor well;
installation instructions included.
9
3064300_201703
5.Transport
- The appliance should be transported fully packaged and on a pallet
- A sack truck is a suitable for this
- Positionthesacktruckbehindthecylinder,securewithastrapand
transport to the installation location
- Remove strap and packaging
- Removethefourxingscrewsonthepallet
- Lift the cylinder off the pallet
Transport
- The cylinder should be installed on a level surface which is substantial
enough to carry its weight.
- Level the cylinder horizontally using the adjustable feet.
Strap
10
3064300_201703
CPM-1-70andCEW-1-200areinstalledagainstawall.Toallowforttingthe
connections,ensureamin.clearanceof200mmfromthewall.Astheirbody
isround,theSEW-1andSEM-1Wcanberotated,consequentlynowall
clearance is required.
A clearance of 800 mm must be maintained at the front for ease of
installation,maintenanceandrepair.
TheCPM-1-70+CEW-1-200Hydrotowerrequiresaminimumroom
heightof2.30m.
Wheninstallingincombinationwithheatpumps,theminimumclearances
speciedfortheBWL-1andBWS-1mustalsobeobserved.
Recommended minimum wall
clearancesCPM-1-70
Service clearances
Ceiling
Wall
Wall
Wall
Wall
≥0mm
≥0mm
≥200mm
≥2300mm
CPM-1
CEW-1
≥800mm
1980 mm
182 mm
Hydrotower
6.MinimumclearancesCPM-1-70
11
3064300_201703
7.CombinationswithCEW-1-200
The combination with Wolf heat pumps provides a variety of space-saving
installation options.
The Wolf WPM-1 heat pump manager with integral BM programming unit
is a required accessory for all heat pumps and cylinders. The cylinder
temperature sensor is available as a required control accessory.
Combinationoptions
ForhigherDHWdemandorheatpumpoutput,combinewitheitherthe
SEW-1-300 or SEW-1-400 instead of the CEW-1-200.
BrineheatpumpBWS-1+cylinderCEW-1-200formax.10kWheatpump
output. The following installation options are available when in combination
with brine heat pumps.
CEW-1-200 + BWS-1
CEW-1-200 BWS-1
WPM-1
BWS-1
CEW-1-200
WPM-1
Space-saving modular principle with air/water heat pump BWL-1
forexternalorinternalinstallationand
HydrotowercomprisingCEW-1-200+CPM-1-70.
Formax.air/waterheatpumpoutputof10kW.
CEW-1-200 / CPM-1-70
+ BWL-1
BWL-1-I
Hydrotower
WPM-1
BWL-1-A
Hydrotower
WPM-1
BWL-1...AExternalinstallation
BWL-1 ... I Internal installation
CPM-1-70
CEW-1-200
CPM-1-70
CEW-1-200
12
3064300_201703
8.Dismantling/assemblingtheCPM-1-70casing
Undothescrewsonthe
frontcasingandremove
thefrontcover
Pull"top"sectionofcasing
forwardsandremoveit
13
3064300_201703
9. Fitting the CPM-1-70 to the CEW-1-200
AssemblingtheHydrotower ThebuffercylinderCPM-1andDHWcylinderCEW-1-200aresupplied
separately and must be assembled on-site.
1.RemovecasingcoverfromDHWcylinder
2. Place buffer cylinder on the mounting bracket of the CEW-1 and align
them vertically.
3. Then hook the securing tabs into the back of the casing of the CPM-1-70
and secure in place as illustrated.
The casing of the CEW-1-200 bears the entire weight of the buffer
cylinder.
4.Hoseconnections
HoseconnectionsetBWL-1/BWS-1
Suitable for establishing the hydraulic
connections between the CEW-1-200 and the
BWS-1-6/8/10asacentre,orbetweenthe
CEW-1-200andCPM-1-70asaHydrotower.
Insulated corrugated stainless steel hoses with
unionnutttings,atgasket,2xG1½",
L = 1400/1950 mm
Forotherpipework:
HoseconnectionsetBWL-1/BWS-1
Suitable for establishing hydraulic
connections.
Corrugated stainless steel hoses with
unionnutttings,atgasket
2xG1½",L=1000mm
WhencombiningtoformaHydrotower,the
casingcoveroftheCEW-1isnotrequired
14
3064300_201703
10.PipeworkconnectionsforCPM-1-70
ascylinderinseries
PipeworkconnectionsfortheCPM-1-70asacylinderinseriesforair/waterheatpumpBWL-1,
connectiontypeA
Heatpump-ow
DHW-ow
Heatpump-return
DHW-return
Heating-return
Heating-
ow
Sensor well
BDF valve
3-way valve
24V AC
Heatingcircuitpump
class A
7m or 8m
head
Manual air-vent valve
Front view
Rear view
Connection type A applies to the CPM-1-70 as a cylinder in series
15
3064300_201703
PipeworkconnectionsfortheCPM-1-70asaseparatingcylinderforair/waterheatpumpBWL-1,
connectiontypeB
Heatpump-ow
DHW-ow
Heatpump-return
DHW-return
Heating-
ow
BDF valve
Heatingcircuitpump
class A
7m or 8m
head
Sensor well
Heating-
return
Connection pipe
for heat pump
return
Connection type B applies to the CPM-1-70 as a separating cylinder
IftheCPM-1-70isusedasaseparatingcylinder,theconnectionpipefortheheatpumpreturnmustbeinstalled
on-site. It is included in the standard delivery.
Pleasenote:
Thecylindercannotoperateproperlyasaseparatingcylinderwithouttheconnectionpipefortheheat
pumpreturn.
Manual air-vent valve
Front view
Rear view
3-way valve
24V AC
11.PipeworkconnectionsforCPM-1-70
asseparatingcylinder
16
3064300_201703
The CEW-2-200 can be installed in combination with the BWL-1S-07/10/14
or BWL-1SB-07/10/14 as a stacked heating centre.
Splitheatingcentrewith
CEW-2-200
Split heating centre with CEW-2-200
Height,indoormodule A mm 790
Height,CEW-2-200 B mm 1290
Overall height C mm 2080
Overallheightwith25lexpansionvessel(ADG)
(accessories - on back of indoor unit)
D mm 2160
Width E mm 650
12. AppliancedescriptionCEW-2-200
CEW-2-200DHWcylinderwithinternalindirectcoil
Steel cylinder with corrosion protection provided by special enamelled
coatingontheinnerwallofthecylinder,complianttoDIN4753.Additional
corrosionprotectionprovidedbysacricialmagnesiumanode.
SuitableforsystemstoDIN1988,EN12828andDIN4753.
DimensionsanddesignaretailoredtotheWolfheatpumprange,enabling
variable combination.
Thecasingisdesignedforhighload-bearingcapacity,toallowtheindoor
module of a BWL-1S split air/water heat pump to be mounted on the
CEW-2-200.
TheDHWcylinderisequippedwithahighlyefcientbare-tubeheat
exchangerwithindirectdualcoilforconvenientDHWheating.
The PU rigid foam insulation ensures minimum radiation and standby heat
losses.
CEW-2-200
DHWcylinder
Standarddelivery CEW-2-200
Packagedinbox,fullyencased,readyfor
connection,incl.boilerdrain&llvalve,
adjustablefeet,installedsensorwell;
installation instructions included.
170 170
85
85
59
691
650
338
650
17
3064300_201703
13.Minimumclearancesforsplit
heatingcentrewithCEW-2-200
Minimumclearances
Splitheatingcentrewith
CEW-2-200
≥2100(2200*)
OverallheightwithADG*
≥800
≥300
≥500
Service clearances
18
3064300_201703
BWL-1S
indoor module
AM display module
CEW-2-200
DHWcylinder
BM-2 programming unit
serves as remote control
BWL-1S
outdoor modules
Splitheatingcentre
14. Combination BWL-1S with CEW-2-200
19
3064300_201703
Splitheatpumpindoormodule-ow
Splitheatpumpindoormodule–return
Cold water
DHW
DHWcirculation
15. Connection CEW-2-200
CEW-2-200
20
3064300_201703
16.InstallationBWL-1S(B)onCEW-2-200
Step1 Step2
Installationofindoormodule
on CEW-2-200
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16
  • Page 17 17
  • Page 18 18
  • Page 19 19
  • Page 20 20
  • Page 21 21
  • Page 22 22
  • Page 23 23
  • Page 24 24
  • Page 25 25
  • Page 26 26
  • Page 27 27
  • Page 28 28
  • Page 29 29
  • Page 30 30
  • Page 31 31
  • Page 32 32
  • Page 33 33
  • Page 34 34
  • Page 35 35
  • Page 36 36
  • Page 37 37
  • Page 38 38
  • Page 39 39
  • Page 40 40
  • Page 41 41
  • Page 42 42
  • Page 43 43
  • Page 44 44

Wolf SEW-1-300 Installation Instructions Manual

Type
Installation Instructions Manual

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI