Anybus X-gateway - PROFIBUS Slave Interface Network Installation Sheet
www.anybus.comSP1752, rev. 2.00, Apr 2015
Accessories Checklist
The following items are required for installation:
• USB cable (included)
• GSD fi le for network confi uration (avalable at www.anybus.com)
• PROFIBUS cable (not included)
• PROFIBUS confi guration tool (not included)
Installation and Startup Summary
1. Set the node address
2. Connect the gateway to the network1
3. Connect a PC to the gateway via USB (optional)
4. Power up and (if required) confi gure the gateway
5. Install the GSD fi le in the PROFIBUS confi guration tool
1 If the node is the last on a bus segment, use a PROFIBUS connector with
built-in terminating resistors.
LED Indicators
LED Indication Meaning
GW Status See Gateway Installation Sheet
Acyclic Green Processing acyclic request
Off No acyclic traffi c
Online Green Online
Off Not online
Offl ine Red Offl ine
Off Not offl ine
Diagnostics
Red (1 Hz) Confi guration error
Red (2 Hz) User parameter data error
Red (4 Hz) PROFIBUS ASIC error
Off No diagnostics present
Top-mounted
GW Status
Online
Acyclic
Offline
Diagnostics
GW Status
Online
Acyclic
Offline
Diagnostics
USB
(X4)
USB
(X4)
B
m-m
n
Product Overview
The PROFIBUS Slave interface can be either top- or bottom-mounted.
Both of these options are illustrated below.
Top-mounted Interface
PROFIBUS Connector (X1)
Node Address x 10
Node Address x 1
Power Connector (X3)
Bottom-mounted Interface
PROFIBUS Connector (X2)
Node Address x 10
Node Address x 1
Node Address Switches
Two rotary DIP switches are used to set the node address of the
interface between 1 and 99.
Example:
Address = 42 (4 x 10) + (2 x 1)
x10 x1
PROFIBUS Connector
Pin Signal
96
15
1, 2, 7, 9 (not used)
3 Line B
4RTS
5 GND Bus
6 +5 V Bus Out
8 Line A
Housing PE
Technical Support
Technical support, documentation and software downloads are
available at www.anybus.com.
Technical questions regarding the PROFIBUS fi eldbus system should
be addressed to www.profi bus.com.