Fujitsu UTW-KBSXJ Installation guide

Type
Installation guide
U0654719_2029_EN_2
08/07/2019
INSTALLATION
Boiler connection kit
Code UTW-KBSXJ
for heat pump, Split single service or 2 services
For professionals. To be kept by the user for future reference
EN
- 2 -
Contents
This manual primarily concerns the installation and connection of the boiler connection.
Please refer to the technical manuals for the heat pump and the boiler for how to install and congure
these units.
Description of the equipment 3
Package ................................3
Scope of application .......................3
Specications ............................3
Operating principle ........................3
Installation instructions 4
Hydraulic connections ......................4
Fitting the boiler connection kit with single service HP .. 4
Fitting the boiler connection kit with 2 services HP .....5
Electrical connections ......................6
Overall hydraulic layouts ....................8
Boiler conguration - Unregulated boiler .......12
Boiler conguration - Regulated boiler ........13
Pre-utilization check ......................14
Boiler connection operating test .............14
Spare parts 15
Boiler connection kit / Installation / 2029 - EN
- 3 -
Description of the equipment
g. 1 - Presentation of the boiler connection kit
g. 2 - Hydraulic pressures and ow rates available
(Hydraulic unit + Boiler connection kit)
Scope of application
The connection of an oil or gas boiler to the heat pump
requires the installation of the boiler connection kit.
This corresponds to the preset conguration :
Boiler connection (Installed options )
Specications
Power absorbed . . . . . . . . . . . . W . . . . . . < 25
Maximum operating pressure . . . . bar . . . . . . . . 3
Supply voltage . . . . . . . . . . . . . . . . 230V - 50Hz
Boiler connection diameter . . . . . mm . . . . 26x34
Flow/return diameter (male) . . . . . mm . . . . 26x34
The installation a boiler connection kit is
not compatible with the use of an electrical
backup kit.
Package
1 package: Boiler connection kit.
On reception, before you t anything, it is essential
that you check the parts received and search for any
damage caused during transport.
0
100
200
300
400
500
600
mbar
1 mbar=10 mmCE=100 Pa
m/h
3
1
1,5 2 2,50,50
2
4
66
ext. in
2
4
6 7
4
2
0
100
200
300
400
500
600
mbar
1 mbar=10 mmCE=100 Pa
m/h
3
1
1,5 2 2,50,50
2
4
77
ext. in
2
4
6 7
4
2
Variable pressure
Constante pressure
Operating principle
When the heat pump cannot supply the amount of
energy required, the 3-way distribution valve shunts the
circuit through the boiler to provide additional energy.
The heat pump can be prevented from operating and
the boiler forced to operate by means of control contact
EX1 (bypass).
- Please refer to the manual provided with the heat
pump.
Boiler connection kit / Installation / 2029 - EN
This corresponds to the preset congurations 3 and 4
on the heat pump’s hydraulic unit’s regulator (line 5700).
- 4 -
Hydraulic connections
The connection must comply with good trade practice
according to local building regulations.
Tightening torque: 15 to 35 Nm.
The appliance must be connected to the installation with
union connectors and shut-o valves to facilitate its removal.
Reminder: Seal everything when tting in accordance
with prevailing trade practice for plumbing work:
- Use suitable seals (bre seals, o-rings).
- Use Teon tape or hemp.
- Use sealing paste (synthetic depending on the case).
Installation instructions
Do not position the servomotor under the valve.
Yes Yes Yes No
Fitting the boiler connection kit with
single service HP
See "Overall hydraulic layouts", page 8
Carefully comply with the direction for tting the
distribution valve.
- Way AB : Inlet from the hydraulic unit.
- Way A open : heat pump + boiler operating.
- Way B open : heat pump operating alone.
Valve motor
release button
Manual operation:
opens all the channels
for the lling and/or drainage.
A
B
AB
Heating
Circuit
Hydraulic unit
Boiler
1 - Install the directional valve of boiler connection kit
as shown in the overall hydraulic layout.
2 - Fix the ow sensor on the facility’s ow pipe.
Good contact must be maintained between the heating
ow sensor and the pipework.
g. 3 - Parts used for installation on single service HP
Make the connection manually and install it outside
the hydraulic module
g. 4 - Distribution valve
Boiler connection kit / Installation / 2029 - EN
- 5 -
Fitting the boiler connection kit with
2 services HP
Remove the front panel.
1 - Put the expansion vessel in position "maintenance".
2 - Remove and suppress the exchanger’s ow pipe.
3 - Fit the pipes of the kit.
Carefully comply with the direction for tting
the distribution valve.
- Way AB : Inlet from the hydraulic unit.
- Way A open : heat pump + boiler operating.
- Way B open : heat pump operating alone.
4 - Make an incision in the insulator and clamp the
ow sensor on the facility’s ow pipe. Apply adhesive
tape on each side of the incision.
Good contact must be maintained between the heating
ow sensor and the pipework.
2
1
3
4
Boiler connection kit / Installation / 2029 - EN
- 6 -
Electrical connections
g. 5 - Electrical wiring
g. 6 - Electrical wiring label
Ensure that the general electrical power supply has been cut o
before starting any repair work.
OFF
ON
1
2
U0629273-A
The electrical connections must only be made when
all the other tting operations have been completed
(xing, assembly, etc.).
Remark: In the case of a heated oor, insert the
oor heating thermal safety device between the X12
connector and the oor heating circulation pump.
Make the following connections:
1 - Distribution valve (deviation boiler) on the X13
connector.
2 - Connect the boiler control to the X14 connector.
Please refer to the instructions supplied with the boiler.
3 - (Only Single service HP) Disconnect the ow
sensor of the HP. Connect the provided ow sensor
using the provided bundle.
() - Stick the label of wiring inside the front plate of the
hydraulic unit.
M
X13
X12
BK
BN
BU
X14
TA
Colour code
BK Black
BN Brown
BU Blue
Distribution valve
(deviation boiler)
Boiler control
(boiler thermostat)
Regulation
board
X10
X11
X12
X13
X14
X15
X30
X50
X70
X75
X80
X82
X83
X84
X86
X100
C.C
X60
Défauts externes/
External defaults
Délestage /Power shedding
Tarifs (HP/HC; Jour/Nuit)
Taris peak times/ o-peak times
Ou/
Or
1+N
230 V
RD
BU
GN/YE
BN
L1
N
1
2
3
L
N
Ou/
Or
0/I
M
2a
1a
1b
2b
EX1
EX2
EX3
BK
BN
BU
L
N
B2
M
B1
3
2
1
Départ /
Flow sensor
Retour /
Return sensor
L
N
COM
RP ECS
L
N
L
N
230V
Contact d'organe externe
External device connection
ACI
électrode
Ballon ECS /
DHW Tank
L
N
1
2
3
4
5
L
N
COM
L
Option
Relève chaudière
Boiler connection
Ou / Or
Option
Appoint électrique monophasé / triphasé
Electric back-up Single phase / 3-Phase
Option AVS 55
Ou / Or
Option 2 circuits
2 circuits option
124534 ind. 0
A1 A2
B1 B2
L
RP1
RP2
N
( ) 3KW
(=) 6KW
L
Option Appoint électrique monophasé
Electric back-up Single phase Option
TA
M
Option Relève chaudière
Boiler connection option
M
Piscine /
Swimming pool sensor
X10
FP
X110
X112
X152
X150
X153
X154
X100
FP
Option AVS 55
Piscine /
Swimming pool sensor
X10
BK
BN
BU
M
X110
X112
X152
X150
X153
X154
X100
Ou/
Or
B2
M
B1
3
2
1
Départ /
Flow sensor
M
C.C
M
Option 2 circuits
2 circuits option
2
1
Boiler connection kit / Installation / 2029 - EN
- 8 -
Overall hydraulic layouts
■ Single service HP : Boiler connection, 1 heating circuit and DHW tank
Legend :
AE - Electrical backup
BD - Disconnection bottle
BT* - Buer tank (mandatory with Rdyn)
CAR - Non-return valve
CC - Heating circulation pump
CCI - Heating system circulation pump built into the boiler
KR - Boiler connection kit
KS - DHW Kit
MH - Hydraulic unit
PC - Underoor heating system
R - Radiator
Rdyn* - Dynamic radiator
SA* - Room sensor (option/ except with Rdyn)
SDR - Boiler ow sensor
SE - Outside sensor
SP - Heated oor thermal safety fuse
SSa - Hot water sensor
TA - Boiler thermostat
VD - Distribution valve
VDI - Distribution valve (deviation boiler)
SE
PC
MH
Db
R
Rdyn*
CC
OU
OU
SA
SA*
SA
BT*
SP
AE
Ssa
M
B
A
AB
VD
KS
M
SDR
A
B
AB
VDI
BD
CAR
CCI
TA
KR
M
SDR
A B
AB
VDI
TA
CCI
KR
Example
boiler unit D
Example
boiler unit A
Boiler connection kit / Installation / 2029 - EN
- 9 -
■ Single service HP : Boiler connection, 2 heating circuits and DHW tank
Legend :
AE - Electrical backup
AVS - Extension board, 2 circuits
BD - Disconnection bottle
BT* - Buer tank (mandatory with Rdyn)
CAR - Non-return valve
CC - Heating circulation pump
CCI - Heating system circulation pump built into the boiler
CCM - Mixed-circuit heat pump
K2c - 2nd circuit kit
KR - Boiler connection kit
KS - DHW Kit
PC - Underoor heating system
R - Radiator
SAx - Room sensor (option/ except with Rdyn)
SDpM - Mixed-circuit initial sensor
SDR - Boiler ow sensor
SE - Outside sensor
SP - Heated oor thermal safety fuse
SSa - Hot water sensor
TA - Boiler thermostat
VD - Distribution valve
VDI - Distribution valve (deviation boiler)
VM - Mixer valve
SE
PC
MH
Db
R
M
CC
VM
CCM
K2c
SDpM
CAR
AVS
SA2
SA1
Rdyn*
SA2*
OU
BT *
SP
AE
Ssa
M
B
A
AB
VD
KS
M
SDR
A
B
AB
VDI
BD
CAR
CCI
TA
KR
M
SDR
A B
AB
VDI
TA
CCI
KR
Example
boiler unit D
Example
boiler unit A
Boiler connection kit / Installation / 2029 - EN
- 10 -
SSe
SR
VE
C
VD
SDp
Pg
Pg
SaeC
Db
SE
Ssa
Sae
AE
GS
MT
CAR
CAR
D
R
OU
PC
SA
SA
Rdyn*
OU
SA*
BT *
M
VDI
KR
TA
A
A
B
AB
M
CAT
Bre
CCI
VDI
D
TA
A
B
AB
CCI
Exemple
groupe chaudière
Exemple
groupe chaudière
Legend :
AE - Hot water electrical backup
CAR - Non-return valve
C - Heating circulation pump HP
CCI - Heating system circulation pump built
into the boiler
CCM - Mixed-circuit heat pump
D - Shut-o
Db - Flowmeter
GS - Safety valve (mandatory)
KR - Boiler connection kit
MT - Thermostatic mixing valve
PC - Underoor heating system
Pg - Bleeder valve
R - Radiators
SA - Room sensor (optional)
Sae - DHW electrical backup safety thermostat
SaeC - Safety thermostat (heating backup
option)
SDp - HP ow sensor
SE - Outside sensor
SR - Return sensor
Ssa - DHW sensor
SSe - Safety valve
TA - Boiler thermostat
VD - Distribution valve
VDI - Distribution valve (deviation boiler)
VE - Expansion vessel
■ PAC 2 services : Boiler connection and 1 heating circuit.
Example
boiler unit D
Example
boiler unit A
Boiler connection kit / Installation / 2029 - EN
- 11 -
Legend :
AE - Hot water electrical backup
AVS - Extension board, 2 circuits
CAR - Non-return valve
C - Heating circulation pump HP
CCI - Heating system circulation pump built
into the boiler
CCM - Mixed-circuit heat pump
D - Shut-o
Db - Flowmeter
GS - Safety valve (mandatory)
K2c - 2nd circuit kit
MT - Thermostatic mixing valve
PC - Underoor heating system
Pg - Bleeder valve
R - Radiators
SA - Room sensor (optional)
Sae - DHW electrical backup safety thermostat
SaeC - Safety thermostat (heating backup
option)
SDp - HP ow sensor
SDpM - Mixed-circuit initial sensor
SE - Outside sensor
SP - Heated oor thermal safety fuse
SR - Return sensor
Ssa - DHW sensor
SSe - Safety valve
TA - Boiler thermostat
VD - Distribution valve
VDI - Distribution valve (deviation boiler)
VE - Expansion vessel
VM - Mixer valve
SSe
SR
VE
C
VD
SDp
Pg
Pg
SaeC
Db
SE
Ssa
Sae
AE
GS
MT
CAR
CAR
D
R
OU
PC
SA
SA
Rdyn*
OU
SA*
BT *
M
SP
CCM
VM
SDpM
K2c
CAR
AVS
SA
SA
SA*
Circuit 1
Circuit 2
CAR
M
VDI
KR
TA
A
A
B
AB
M
CAT
Bre
CCI
VDI
D
TA
A
B
AB
CCI
Exemple
groupe chaudière
Exemple
groupe chaudière
■ PAC 2 services : Boiler connection and 2 heating circuits.
Example
boiler unit D
Example
boiler unit A
Boiler connection kit / Installation / 2029 - EN
- 12 -
Boiler conguration - Unregulated boiler
Not suitable for an installation with a heated oor.
BD
CAT
BD
CAT
BD
CAT
BD
CAT
A
B
C
B’
C’
A’
D
E
...avec circulateur
chauffage extérieur
...avec circulateur
chauffage extérieur
et vanne de mélange
manuelle3voies
...avec circulateur
chauffage intégré
...avec circulateur
chauffage/sanitaire
et vanne directionnelle
intégrés
sinon
Ouvrir en grand la vanne de mélange manuelle
dans le cas d’une chaudière chauffage seul.
Si un ballon sanitaire est intégré, régler la vanne
pour limiterlatempératureàlatempérature
habituelle l’hiver.
Supprimer le circulateur chauffage
Installer une bouteille de découplage
- capacité adaptée (au moins 1,5l)
- débit maxi de 2,5m/h
-raccordementsen1
3
Groupe
chaudière
initial...
...avec circulateur
chauffage extérieur
et vanne de mélange
manuelle4voies
Supprimer le thermostat d’ambiance
Raccorder les bornes TA de la chaudière
devenues libres aux plots12et13du
module hydraulique.
Supprimer le thermostat d’ambiance
Groupe
chaudière
requis...
Régler le thermostat de la chaudièreàlatempérature habituelle l’hiver.
ParamétrerlarégulationdelaPAC suivant besoin aux lignes et .3700 3705
Raccorder les bornes TA de la chaudière devenues libres
aux plots12et13du module hydraulique.
S’il s’agitd’un contact TA à coupure sur circulateur :
- Raccorder lesplots 12 et 13 pour couper le brûleur tout en
préservant la productiond’eau chaude sanitaire si existante,
OU
-Ne pas raccorder lesplots 12 et 13, la chaudière sera
maintenue en températureen permanence (type bain-marie).
...with external
heating system
circulation pump
Initial boiler unit…
Boiler
unit
required…
...with external heating
system circulation
pump and 3-port
manual mixing valve
...with external heating
system circulation
pump and 4-port
manual mixing valve
...with built-in heating
system circulation
pump
...with built-in heating
/ domestic hot water
system circulation
pump and distribution
valve
Open the manual mixing valve wide in the case of boiler
heating only.
If an expansion tank is tted, set the valve to restrict the
temperature to the usual temperature in winter.
Remove the heating system circulation pump.
OR
Remove the room thermostat
Set the valve to restrict the temperature to the usual temperature in winter.
Remove the room thermostat
Install a disconnection bottle with
- a suitable capacity (a least 1.5 liters)
- a maximum ow rate of 2.5m
3
/h
- 1” connections
Connect the room thermostat terminals that
have been freed on the boiler to stud X14 on the
hydraulic unit.
Connect the room thermostat terminals that have been freed on the
boiler to stud X14 on the hydraulic unit.
If there is an room thermostat contact to be cut on the circulation
pump:
- Connect stud X14 to cut o the burner while maintaining the
production of hot water (if covered by the system)
or
- Do not connect stud X14, the boiler must be constantly kept under
temperature (water bath type).
Set the heat pump’s control parameters as required in HP conguration / Connection boiler [(A) only],
or in lines 88 or 3700 and 89 or 3705 [(B) only].
Boiler connection kit / Installation / 2029 - EN
- 13 -
Boiler conguration - Regulated boiler
20°
20°
BD
CAT
BD
CAT
BD
CAT
BD
CAT
20°
20° 20°
20°
SD
SD
A
B’
C’
A’
D E
20°
20°
20°
20°
...with external
heating system
circulation pump
Initial boiler unit…
Boiler
unit
required…
...with external heating
system circulation
pump and 3-port
manual mixing valve
...with external heating
system circulation
pump and 4-port
manual mixing valve
...with built-in
heating system
circulation pump
...with built-in heating
/ domestic hot water
system circulation pump
and distribution valve
Remove the heating system
circulation pump
OR
If room thermostat present If room thermostat presentIf room sensor present
Remove the room thermostat
Set the boilers manual thermostat to maximum (if tted).
Set the boiler control to AUTO mode. Match the boiler’s heating gradient to that of the heat pump.
The areas in which the outdoor sensors (for the heat pump and the boiler) must be adjacent to each other.
Controlling the boiler: Lower the summer-winter changeover temperature to 5°C.
Remove the room thermostat
Install a disconnection bottle with
- a suitable capacity (a least 1.5 liters)
- a maximum ow rate of 2.5m3/h
- 1” connections"
Connect the room thermostat
terminals that have been freed
on the boiler to stud X14 on the
hydraulic unit.
Remove the room sensor if the boiler
control system permits this or render
the sensor inactive (deactivate the
inuence of the ambient air and
adaptive automatic mode).
Connect the room thermostat terminals
that have been freed on the boiler to stud
X14 on the hydraulic unit.
If there is an room thermostat contact
to be cut on the circulation pump, do
not connect stud X14, the boiler must
be constantly kept at the temperature
calculated by the control system.
Set the heat pump’s control parameters as required in HP conguration / Connection boiler [(A) only],
or in lines 88 or 3700 and 89 or 3705 [(B) only].
For a previous Heating oor system, set "Post-circulation" = 0min [(A) only],
or set parameter 89 or 3705 to zero [(B) only].
Boiler connection kit / Installation / 2029 - EN
- 14 -
Pre-utilization check
- Please refer to the manual provided with the HP.
- Please refer to the instructions supplied with the boiler.
Boiler connection operating test
The distribution valve of the boiler connection and of the
boiler can be engaged by setting :
Auxiliary functions / Test mode / Relay test
==> Boiler connection On/Stop.
Do not forget to reset the parameter to "O"
after the test.
Boiler connection kit / Installation / 2029 - EN
The distribution valve of the boiler connection and of the
boiler can be engaged by setting the 7141 parameter to
"On" (Emergency operation = "On").
- 15 -
Nr Code Designation ........Type ....A/B ....Qty
1 988109 Valve ................... . . . . A/B .....01
2 150322 Motor ................... . . . . A/B .....01
3 142735 Seal .............. 26x34 ....A/B .....03
4 109695 Bundle .................. . . . . A/B .....01
5 198746 Sensor ........QAD36/101 .... A/B .....01
6 109614 Bundle .................. . . . . A/B .....01
7 110865 Connector ............2 x ....A/B .....01
8 184089 Pipe .................... . . . . . B ......01
9 184096 Pipe .................... . . . . . B ......01
10 184090 Pipe .................... . . . . . B ......01
g. 7 - Spare parts Boiler connection kit
Spare parts
When ordering spare parts, specify the appliance type and serial number, the name of the part and the part number.
(A : PAC 1 service / B : PAC 2 services)
3
8
10
9
1
3
2
7
6
5
4
Boiler connection kit / Installation / 2029 - EN
Commissioning date:
Address of your heating installer or customer service.
Fujitsu General (Euro) GmbH
Werftstrasse 20
40549 Düsseldorf - Germany
RC Dunkerque - Siren 440 555 886 - Subject to modications without notice. Non contractual document.
Complies with:
- Low voltage directive 2014/35/EU, under standard EN 60335-1.
- Electromagnetic compatibility Diretive 2014/30/EU.
This appliance is marked with this symbol. This means that electrical and electronic products shall not be mixed with general household waste.
European Community countries(*), Norway, Iceland and Liechtenstein should have a dedicated collection system for these products.
Do not try to dismantle the system yourself as this could have harmful eects on your health and on the environment.
The dismantling and treatment of refrigerant, oil and other parts must be done by a qualied installer in accordance with relevant local and national regulations.
This appliance must be treated at a specialized treatment facility for re-use, recycling and other forms of recovery and shall not be disposed of in the municipal waste stream.
Please contact the installer or local authority for more information.
* subject to the national law of each member state
  • Page 1 1
  • Page 2 2
  • Page 3 3
  • Page 4 4
  • Page 5 5
  • Page 6 6
  • Page 7 7
  • Page 8 8
  • Page 9 9
  • Page 10 10
  • Page 11 11
  • Page 12 12
  • Page 13 13
  • Page 14 14
  • Page 15 15
  • Page 16 16

Fujitsu UTW-KBSXJ Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI