BLACKOUT 365 AAQBL=12 /12567 Installation guide

Type
Installation guide
Window Panel Installation
1. Prepare curtain rod to receive window panel by unscrewing one or
both of the curtain rod finials.
2. Remove window panel(s) from packaging.
3. Feed curtain rod through window panel header.
a. On Grommet panels, feed rod through metal rings.
b. On Pole Top or Rod Pocket panels, feed rod through the side
with the larger opening.
c. On Back Tab panels, feed rod through tabs.
  • Page 1 1

BLACKOUT 365 AAQBL=12 /12567 Installation guide

Type
Installation guide

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI