upgrades cyclers can be connected and
controlled by normal
computer through RJ45
interface.
9 Power Switch Turn the equipment ON/OFF. -
10 Power Socket Connect power supply. -
11 Fuse Socket Install fuse in the socket to protect
equipment from over-current.
The fuse specifications are as
follows: 250V 8A, 5×20. Fuse
should be replaced by one
that complies with these
specifications.
1.2.2 Installing your instrument
Install and Remove the block as follows:
1.2.2.1 Installation:
• Place the block (1) into the housing well (2) and
push it slowly forwards until a connection between
the block socket and the main unit’s connection
plug (3) is achieved.
• Press the locking handle (4) downwards, the block
will move forward automatically until you hear the
click sound, which means the block is installed
successfully.
• Do not force!
1.2.2.2 Removing the Block
• Turn off the power supply.
• Uplift the locking handle (4), the block will move
backward a bit.
• Pull the locking handle to move block gently
towards the rear of the main body.
• Remove the block from the main body.
Note: • Turn off the power supply before installing block.
• When installing the block, pay close attention to pushing the block slowly and gently ; or the
main unit’s connecting plug may be damaged.
• When uninstalling the block, please pull the block from the block bath gently. Do not tilt the
block or the connection plug may break.