Prime-Line M 6071 Installation guide

Type
Installation guide

Prime-Line M 6071 is a versatile tool designed to assist users in replacing rollers or roller brackets on sliding tub doors. Its primary function is to facilitate the lifting and tilting of the door from inside the tub, allowing for easy access to the components that need replacement.

With its precise measurements of 1" (2.5 cm) and 1-1/2" (3.8 cm), the Prime-Line M 6071 is suitable for various sliding tub door configurations. Whether you encounter difficulties with a single roller or the entire bracket, this tool empowers you to handle the repair task efficiently.

Prime-Line M 6071 is a versatile tool designed to assist users in replacing rollers or roller brackets on sliding tub doors. Its primary function is to facilitate the lifting and tilting of the door from inside the tub, allowing for easy access to the components that need replacement.

With its precise measurements of 1" (2.5 cm) and 1-1/2" (3.8 cm), the Prime-Line M 6071 is suitable for various sliding tub door configurations. Whether you encounter difficulties with a single roller or the entire bracket, this tool empowers you to handle the repair task efficiently.

M 6071 M 6071 M 6071
Tools needed / Herramientas necesarias / Outils requis Tools needed / Herramientas necesarias / Outils requis Tools needed / Herramientas necesarias / Outils requis
From inside the tub, lift up and tilt out door. If necessary,
raise top track to free doors to clear bottom guide. Replace
roller or roller bracket.
Desde adentro de la bañera, levante e incline la puerta
hacia afuera. Si fuese necesario, levante el riel superior
para liberar las puertas de la guía inferior. Reemplace la
rueda o el soporte de la rueda.
De l’intérieur du bain, levez la porte et inclinez-la vers
l’extérieur. Si nécessaire, levez le rail supérieur poursortir
la porte et dégager le guide inférieur. Remplacez la roulette
ou le support de roulette.
From inside the tub, lift up and tilt out door. If necessary,
raise top track to free doors to clear bottom guide. Replace
roller or roller bracket.
Desde adentro de la bañera, levante e incline la puerta
hacia afuera. Si fuese necesario, levante el riel superior
para liberar las puertas de la guía inferior. Reemplace la
rueda o el soporte de la rueda.
De l’intérieur du bain, levez la porte et inclinez-la vers
l’extérieur. Si nécessaire, levez le rail supérieur poursortir
la porte et dégager le guide inférieur. Remplacez la roulette
ou le support de roulette.
From inside the tub, lift up and tilt out door. If necessary,
raise top track to free doors to clear bottom guide. Replace
roller or roller bracket.
Desde adentro de la bañera, levante e incline la puerta
hacia afuera. Si fuese necesario, levante el riel superior
para liberar las puertas de la guía inferior. Reemplace la
rueda o el soporte de la rueda.
De l’intérieur du bain, levez la porte et inclinez-la vers
l’extérieur. Si nécessaire, levez le rail supérieur poursortir
la porte et dégager le guide inférieur. Remplacez la roulette
ou le support de roulette.
1"
2.5 cm
1"
2.5 cm
1"
2.5 cm
1-1/2"
3.8 cm
1-1/2"
3.8 cm
1-1/2"
3.8 cm
  • Page 1 1

Prime-Line M 6071 Installation guide

Type
Installation guide

Prime-Line M 6071 is a versatile tool designed to assist users in replacing rollers or roller brackets on sliding tub doors. Its primary function is to facilitate the lifting and tilting of the door from inside the tub, allowing for easy access to the components that need replacement.

With its precise measurements of 1" (2.5 cm) and 1-1/2" (3.8 cm), the Prime-Line M 6071 is suitable for various sliding tub door configurations. Whether you encounter difficulties with a single roller or the entire bracket, this tool empowers you to handle the repair task efficiently.

Ask a question and I''ll find the answer in the document

Finding information in a document is now easier with AI