EDGE Nitrogen Accessory Page 2 of 2
2021-01
© 2020 CEM Corporation
Installation
1. The EDGE should be unplugged without a solvent or waste bottle attached.
2. Place the EDGE so you can access the nitrogen fitting on the clear cover.
3. Connect the assembly to the EDGE using the supplied 0.25” tubing by pressing it into the push-to-
connect fitting as shown in the image below. Ensure the tubing is pushed in fully by pulling on the
tubing once installed. If it does not move, it is locked in place.
4. Connect the other side of the tubing to the Nitrogen accessory.
5. Connect the Nitrogen accessory to the nitrogen source using polypropylene tubing with an OD of 0.25”.
Note: 0.25” polypropylene tubing is required to connect the nitrogen accessory to the nitrogen
source.
6. Turn the gas on when ready to run samples.
Note: The gas must be turned on in order for the EDGE to function.
7. Run your EDGE as normal, and turn the gas off at the source to prevent gas from escaping when
EDGE is idle.
Caution
A regulator that restricts the pressure/flow to no more than 100 psi entering the box is required. Anything
above this flow will cause damage to the EDGE and Nitrogen accessory.