Leadvision WPC PERGOLA Installation Instructions Manual

  • Hello! I am an AI chatbot trained to assist you with the Leadvision WPC PERGOLA Installation Instructions Manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
Option A
Option B
INSTALLATION INSTRUCTIONS
WPC PERGOLA
10’x10’
269mm/10.59”
269mm/10.59”
Base plate cover
3048mm/120’’
3048mm/120’’
3048mm/120’’
2052mm/80.76”
2454mm/96,6”
2454mm/96,6”
2835mm/111.6”
L1: U-clip X16
L2: M8 60mm screw bolt X16
L3: L-angle clip X105
L4: 4.2X25mm screw X270
L5: Expansion screw X16
L6: M10 treaded rod X12
L7: 3.8X25mm screw X40
Base plate cover X4
Drill
Straight line
Straight line
Mark line
The hole size
Mark point
Z=3537mm/139.2''
16
0.629
A:Steel inner post
According to the measurement, please put the steel inner post (A)
on the ground. ATTENTION: The ground should be flat.
STEP:1
STEP:2
Z
Z
198mm7.8’’ 198mm7.8’’
Between80-90mm
(3.15’’-3.55’’)
2501mm/98.4”
2501mm/98.4”
2105mm/82.8”
2105mm/82.8”
attention
Note:
Please drill the holes as
the diagram shown.
Drill the points
Straight line
Straight line
Straight line
Straight line
Put the posts on the expansion screws (L5)
Fix the expansion screws (L5)
L5
Note:
Please be careful not to break the base
plate cover.
Put the B over the A. When touching th WPC
part, please wear gloves, in case there is oil
on the WPC posts.
Before fixing the posts to the ground, refer to the front page of the guide (option A or option B), using
the pre-drilled holes on the end of the posts, choose the orientation of the desired roof structure.
same
STEP:3
STEP:4
STEP:5
2
4
Straight line Straight line
same
Measure and adjust until the
following requirements.
Measure the distance between the
posts and the length is 2454mm/102”.
1.Use the Level to ensure the a side and b side of the
posts must be vertical to the ground.Please adjust if
necessary.
Use the wrench to fix the
expansion screws (L5)
2.The ground should be flat.
Straight line
Straight line
2454mm/102”
2454mm/102”
5
STEP:6
STEP:7
STEP:8
3
Straight line
Straight line
Post Installation A & B
Put the base plate covers (H) on the WPC posts.
6
2454mm/102”
2454mm/102”
2454mm/102”
2454mm/102”
Measure again
B
STEP:9
STEP:1
7
Assemble the treaded rod (L6) and the U-Clips (L1) as the diagram shown.
STEP:2
Install the cross beams (C) with the treaded
rod (L6) and the U-clips (L1).
8 pieces 4 pieces
L6
L1
middle
top
bottom
Note: Please adjust the distance
between the posts according to
the holes position on the C.
8
L7
L7
L7
Note: Keep the screws (L7) parallel to the cross beam (C).
Keep Parallel
Keep Parallel
L7 L7
Please pre-drill the holes for the screws (L7) with
Φ4mm(Φ0.2”) and fix the screws (L7). Please do not
pre-drill the inner aluminum.
STEP:3
9
Note :The drain holes must
be downwards.
Install the beams 2 (F) to the cross beams (C) with the U-Clips (L1) and the screws bolt (L2).
Note: Please use the wrench to
fix the L2 go through the holes of
the F tightly.
Beam F installation
10
Note :The drain holes
must be downwards.
Pre-drill the holes on the beam 2 (F), please do not
pre-drill the inner aluminum.Fixing the U-Clips (L1)
and screws (L7) with the holes we pre-drill as the
diagram shown.
Use the wrench to install the
beam 3 (G) with the screws
bolt (L2) tightly.
Fix the beam 3 (G) according to the
6 cuts of the beam 1-2 (E).
L7
L7
L7
L7
Keep Parallel
Keep Parallel
Beam G installation
11
7
D
L4
L3
Fix the L-angle clips (L3) and the screws (L4) to the beams (D).
STEP:1
Fix the L-angle clips (L3) and the screws (L4) to the beams (D).
Put the beams (D) on the cross beams (C), one piece on each side.
Beam D installation
L4
Aluminium
The hole Φ5mm
WPC
Aluminium
WPC
12
STEP:2
STEP:3
Pre-drill the cross beams (C). ATTENTION: Do not pre-drill the inner aluminum.
Measure the distance of the cross beams (C) as the diagram shown which is 222mm/8.74” and mark the points.
222mm/8.74”222mm/8.74”
Fix the screws (L4) on the cross beams (C).
Adjust the distance between the two pieces of the beam 1-2 (E), the distance “P” is
269mm/10.59” and mark the points.
E×7
E
PPPPPPPP
8
STEP:1
There are 6 cuts on each pieces. Please adjust the cuts to fit onto the cross beams (C).
13
Beam (E)
L4
L3
Fix the L-angle clips (L3) and the screws (L4) to the beams (E).
Beam E installation
M M
N
Pre-dril the points on the WPC beam and do not
pre-drill the inner aluminum.
Fix the screws (L4) and measure again the distance as the Page 1 show.
STEP:2
STEP:3
Aluminium
The hole Φ5mm
WPC
Aluminium
WPC
L4
Fix the screws (L4) on the cross
beams (C).
14
/