Follett HMD1400NBT Installation Instructions Manual

  • Hello! I am an AI chatbot trained to assist you with the Follett HMD1400NBT Installation Instructions Manual. I’ve already reviewed the document and can help you find the information you need or explain it in simple terms. Just ask your questions, and providing more details will help me assist you more effectively!
208264
Stock Module Identification Plate
Service No.
Module No.
Product
RE
FRIG
E
R
AN
T
M
O
D
E
L
M
O
T
O
R
C
O
M
P
R
E
S
S
O
R
THE
R
M
AL
L
Y
P
R
OTE
CTE
D
E
a
s
t
o
n
P
e
n
n
s
y
l
va
n
i
a
FU
L
L
L
O
AD
AM
P
S
M
A
X
.
B
RA
N
C
H
C
I
R
C
U
I
T
F
U
S
E
S
I
Z
E
M
I
N
.
B
R
A
N
C
H
C
I
R
C
U
I
T
A
M
P
A
C
I
T
Y
D
E
S
IG
N
P
RE
S
S
U
RE
HIG
H
S
ID
E
A
M
P
S
A
M
PS
V
O
LT
S
C
O
RP
O
R
A
TIO
N
S
E
RIAL
N
O
P
HAS
E
S
IN
G
L
E
CH
AR
G
E
L
O
W
S
ID
E
P
AR
T
N
O
P
S
I
G
THE
U
S
A
M
A
D
E
I
N
O
Z
R
C
R
HZ
U
L
L
N
S
F
U
Order parts online
www.follettice.com
Horizon
Ice Machine Installation Instructions
for Ice Storage Bin Top-mount Applications
HCD/HMD/HCF/HMF1000RBT, HCD/HMD/HCF/HMF1400RBT, HCD/HMD/HCF/HMF1650RBT,
HCD1000NBT, HMD1000NBT, HCD1400NBT, HMD1400NBT, HCD1650NBT, HMD1650NBT
(See model number con gurator on page 2 for details.)
remote condensing
00159962R08
801 Church Lane • Easton, PA 18040, USA
Toll free (877) 612-5086 • +1 (610) 252-7301
www.follettice.com
2
remote condensing BIN • TOP-MOUNT
ConfigurationApplication
S RIDE™
(RIDE remote
ice delivery
equipment)
T Top-mount
400 up to
454 lbs
(206kg)
1000 up to
1036 lbs
(471kg)
1400 up to
1450 lbs
(658kg)
1650 up to
1580 lbs
(717kg)
V Vision™
H Harmony™
B Ice storage bin
J Drop-in
M Ice Manager
diverter valve
system
CondenserSeriesVoltageIcemaker
C 208-230/60/1 (icemaking head)
Self-contained only.
D 115/60/1 (icemaking head)
Self-contained and remote. If remote
unit, high side is 208-230/60/1.
E 230/50/1 (icemaking head)
Self-contained only.
F 115/60/1 (icemaking head)
Remote only. High side is
208-230/60/3.
MC Maestro™
Chewblet
®
(400 Series)
HC Horizon
Chewblet
(1000, 1400,
1650 Series)
HM Horizon
Micro Chewblet
HC 1400CSVA
A Air-cooled, self-contained
W Water-cooled, self-contained
R Air-cooled, remote condensing unit
N Air-cooled, no condensing unit for
connection to parallel rack system
Chewblet
®
Ice Machine Model Number Configurations
BIN • TOP-MOUNT remote condensing
3
Front cover
8
Internal connection
7
Ice transport tube
5
External connection
6
Louvered docking assembly
4
Bin preparation
3
Site preparation
2
Unpack
1
Read and complete the following 8 installation steps
4
remote condensing BIN • TOP-MOUNT
Carefully unpack and inspect the contents of your Follett ice machine.
1
Unpack
1/2"
1/2"
➊➋
➌➍
➎➏
Unpack ice machine
1. 1
BIN • TOP-MOUNT remote condensing
5
Prepare the installation site.
2
Site preparation
Provide drainage, water supply and electrical power to within 6 feet (2m) of ice
machine in accordance with local and national codes. Outdoor installation is
not recommended and will void warranty.
NEMA
5-15
3/8" (9,5mm)
208264
Stock Module Identification Plate
Service No.
Module No.
Product
R
E
F
R
I
G
E
R
A
N
T
M
O
D
E
L
M
O
T
O
R
C
O
M
P
R
E
S
S
O
R
T
H
E
R
M
A
L
LY
P
R
O
T
E
C
T
E
D
E
a
s
t
o
n
P
e
n
n
s
y
l
v
a
n
i
a
F
U
L
L
L
O
A
D
A
M
P
S
M
A
X.
B
R
A
N
C
H
C
I
R
C
U
IT
F
U
S
E
S
I
Z
E
M
I
N
.
B
R
A
N
C
H
C
I
R
C
U
I
T
A
M
P
A
C
I
T
Y
D
E
S
I
G
N
P
R
E
S
S
U
R
E
H
I
G
H
S
I
D
E
AM
P
S
A
M
P
S
V
OLTS
C
O
R
P
OR
A
TI
O
N
S
E
R
I
A
L
N
O
P
H
A
S
E
S
I
N
G
L
E
C
H
A
RG
E
LO
W
S
I
D
E
P
A
RT
N
O
P
S
I
G
T
H
E
U
S
A
M
A
D
E
I
N
O
Z
R
C
R
H
Z
U
L
L
N
S
F
U
1/4"
1'
Electrical
120/60/1-6 amps
Potable water supply
• 10-70 psi (69-483kpa)
• 45-90 F (7-32 C)
• Follett recommends the use of an in-line water  ltration system (item# 00130286)
Drain
The drain line from the ice machine must have at least 1/4" per foot pitch (6,4mm/.3m)
Refrigeration lines
• 1000, 1400: 5/8" (15,8mm) diameter suction (insulated)
• 1650: 7/8” (22,2mm) diameter suction (insulated)
• 3/8" (9,5mm) liquid
2.1
Installation site requirements
2.1
6
remote condensing BIN • TOP-MOUNT
Prepare the bin.
3
Bin preparation
Remove protective tape from
gaskets
Bin top preparation
3.1
Apply gaskets
Install shuttle actuator
through bin top
and secure with locking nut
Bin top preparation
3.2
BIN • TOP-MOUNT remote condensing
7
Install the louvered docking assembly.
Louvered docking assembly
4
1" (25,4mm)
Stub Typ
3" (76mm)
1-3/4" (44,5mm)
3" (76mm)
3/8"
high pressure
line
1000, 1400:
5/8" low pressure line
1650:
7/8" low pressure line
Mount louvered docking assembly
“Rough-in” the refrigerant piping
2.1
Louvered docking assembly
4.1
8
remote condensing BIN • TOP-MOUNT
Braze supplied expandable refrigerant
lines in place
Refrigerant lines
4.2
BIN • TOP-MOUNT remote condensing
9
Ice transport tube
Install the ice transport tube.
5
Hot Water
160 F (71 C)
5.1
Slide insulation onto ice transport tube
Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with
pliers
before making connection to ease assembly
Connect ice transport tube to coupling on louvered docking station
Connect ice transport tube to shuttle actuator
10
remote condensing BIN • TOP-MOUNT
Connect utilities to louvered docking assembly.
6
External connections
Remove access panel if necessary.
Install drain line
.
The rigid drain line from the ice machine
must have at least 1/4" per foot pitch
(6,4mm/0,3m).
Install ice machine potable water
supply
Replace access panel
Water and drain
6.1
BIN • TOP-MOUNT remote condensing
11
Rotate and braze refrigerant lines
Refrigeration lines
7. 3
Connect louvered docking assembly to ice machine.
7
Internal connections
Slide ice machine into louvered docking
assembly
Insert ice transport tube all the way into
coupling and tighten nut  rmly
Ice transport tube installation
7. 1
Insert potable water line into valve
Push drain line over hose barb on
back of evaporator mount
Water and drain lines
7. 2
Remove twist tie
Carefully pass plug thru opening and plug
into wall outlet
Power cord
7. 4
12
remote condensing BIN • TOP-MOUNT
Position plate into opening and secure
with supplied screw
Power cord
7. 5
BIN • TOP-MOUNT remote condensing
13
14
remote condensing BIN • TOP-MOUNT
Front cover
Install front cover to ice machine.
8
Complete installation of condensing unit
or connection to rack system.
Install condensing unit
8.1
Slide ice machine cover over machine
ensuring that tabs on back of cover
slip under louvers on back of louvered
docking assembly
Insert and tighten two screws through
cover and into louvered docking assembly
Install ice machine front cover
8.2
NOTICE
Ice machine MUST be sanitized prior to operation!
Consult Operation and Service Manual provided with ice machine for sanitizing instructions.
BIN • TOP-MOUNT remote condensing
15
00159962R08
3/12
801 Church Lane • Easton, PA 18040, USA
Toll free (877) 612-5086 • +1 (610) 252-7301
www.follettice.com
Horizon, Maestro, Harmony, Ice Manager, SafeCLEAN, Sani-Sponge, RIDE and Vision are trademarks of Follett Corporation.
Chewblet is a registered trademark of Follett Corporation, registered in the US.
/